My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3128
>
2300 - Underground Storage Tank Program
>
PR0501551
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:23:48 AM
Creation date
11/5/2018 12:07:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0501551
PE
2381
FACILITY_ID
FA0005145
FACILITY_NAME
EXXON COMPANY USA
STREET_NUMBER
3128
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09523002
CURRENT_STATUS
02
SITE_LOCATION
3128 W BENJAMIN HOLT DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BENJAMIN HOLT\3128\PR0501551\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/28/2011 8:00:00 AM
QuestysRecordID
104696
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> STATE OF CALIFORNIASTATE WATER RESOURCES CONTROL BOARDUNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM Br,z COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION O 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT O 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE f1 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED:n)04j �.�L-,--sem, A- <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.a -7- -_4-a B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAY/YEAR) uN D. TANK CAPACITY IN GALLONS: WEI <br /> IL TANK CONTENTS IFA-11SMARKED,COMPLETE ITEM C. <br /> A ❑ 1 MOTOR VEHICLE FUEL 4 OIL B. C. ❑ 1fl REGULAR ED 3 DIESEL ❑ 8 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY El1 PRODUCT ❑ 1b PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> ❑ FUEL <br /> 3 CHEMICALPRODUCT ❑ 95 UNKNOWN 2 WASTE 2 LEADED ❑ 6 JETHER <br /> ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED KlVprAqIIZ WAlIVItt '=-'IL-+ C.A S. <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C,AND ALL THAT APPLIES IN BOX <br /> A. TYPE OF ❑ I DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ILL 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL F-] 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 09 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 8 UNLINED ®g°6 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL 7 YES_ NO— <br /> D.CORROSION ❑ I POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE lj;j 95 UNKNOWN ❑ 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE AIFABOVEGROUNDORUIFUNDERGROUND,BOTHIFAPPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL WICOATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION NO" UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ I AUTOMATIC LINE LEAK DETECTOR 2 LINE TIGHTNESS TESTING ❑ 3IONRORING E] 99 OTHER <br /> V.TANK LEAK DETECTION <br /> 1 VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> 6 TANK TESTING 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION 1 <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 41A 2. TAATNCE HEMAITYO a GALLONS 3 WAS TAN FILLED <br /> WITH(.kI}YES ❑ NO ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAURI=) N DATE <br /> PRINTED 8 SIGNATURE) <br /> E -3 <br /> LOCAL AGENCY LY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILTFY# TANK# <br /> STATE I.D.# 9 1 1 JIIVIZ114- <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B ISIIITHIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FOR00N8fMI�///�/) <br />
The URL can be used to link to this page
Your browser does not support the video tag.