Laserfiche WebLink
FEE WORKSHEET <br /> DBA -be &RM SeRolc 'C . _ �l Ef7-.,9 fib 66flfl//cE, <br /> ADDRESS VRavkc. 4S3sS <br /> 1. Operating Permit Application/Annual Inspection Fee <br /> a. Existing Facility and 1st Tank @ $150. / TO <br /> b. Additional Tanks Additional Tanks x $50) 0 <br /> 2. State Surcharge (per tank) (Due with Permit Application, <br /> on renewal or amendment of operation permit) <br /> ($56x Total -4 Talks) <br /> 3. *Temporary Closure (per tank) Underground Storage Tank in which <br /> storage has ceased but where the owner/operator proposes to <br /> re-use tank within 2 years. <br /> (#_ Temporary closures x $80) <br /> 4. *Permanent Closure (per tank) Underground Storage Tank in which <br /> storage has ceased and where the owner/operator has no intent <br /> of re-using tank within next 2 years. <br /> (# Permanent Closures x $90) <br /> Total Number of Tanks / Total Fee Due ��O 6 <br /> Make all fees payable to San Joaquin Local Health District. Enclose this worksheet <br /> with your check and the completed application. r <br /> EXAMPLE - Annual Fee for Facility with 4 Tanks <br /> (1 regular, 1 unleaded, 1 supreme, 1 waste oil ) <br /> la. Existing Facility & 1st Tank $150 <br /> b. 3 Additional Tanks x $50 150 <br /> 2. State Surcharge, 4 Tanks x $56 r6ang <br /> 6� '�///J <br /> Total Number of Tanks 4 Total Fee Due— rEg 3 ?Jdb <br /> ENWROMENTAL HEALTH <br /> Pow/SER"M <br /> *Both closures will be conditioned. Contact a Health District Representative. <br /> 12/85 <br />