My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIANCHI
>
4
>
2300 - Underground Storage Tank Program
>
PR0505060
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:54 AM
Creation date
11/5/2018 12:10:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0505060
PE
2381
FACILITY_ID
FA0010636
FACILITY_NAME
STKN MUD WW
STREET_NUMBER
4
Direction
W
STREET_NAME
BIANCHI
STREET_TYPE
RD
City
STOCKTON
Zip
95207
APN
10231004
CURRENT_STATUS
02
SITE_LOCATION
4 W BIANCHI RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BIANCHI\4\PR0505060\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)(A.IESTI( TECH <br /> CHECK LIST Yes No Appy <br /> 42, DO HEUCOPTER CRANES MEET CONSTRUCTION REQUIREMENTS? (11.0.01, te.0.04, 14.0.1 e7 <br /> 43. DO HYDRAULIC JACK$ MEET SPECIAL SAFETY CONDITIONS? (10-4) <br /> u. IS CONCRETE EQUIPMENT FITTED WITH ADEQUATE SAFETY DEVICES? (14.0.32, 15.0,03, 14.0.96, <br /> (14.0.07,16.0.04) <br /> 45. ARE ELEVATING AND ROTATING WORK PLATFORMS IN CONFORMANCE WITH ANSI A92.2? <br /> (nx6 u <br /> 46. DO CONVEYORS, CABLEWAYS, AND RELATED EQUIPMENT CONFORM TO ANSI 820.017 <br /> (nJco u <br /> 47. ARE PILE DRIVERS EQUIPPED WITH ALL APPROPRIATE SAFETY DEVICES? (1e.4 <br /> Aa. 00 MATERIAL HOISTS CONFORM TO ANSI A10.5? CILJ) <br /> 49. 00 PASSENGER ELEVATORS CONFORM TO ANSI A10,1? 00 TEMPORARY HOISTS IN ACCORDANCE <br /> TO ANSI Al 0,22? (14!101) <br /> 50. DO HAND AND POWER TOOLS COMPLY WITH APPLICABLE ANSI STANDARDS? (SEC f1) <br /> The following = questions cppLy to C,rIgnes and Hoisting Equipment only and need ' <br /> not be answered for other conrtructian equipTrLent. <br /> 51. 15 HIGH VOLTAGE SIGN POSTED? (16.E.04, 14.0.02) <br /> 52, IS EQUIPMENT FITTED WITH POSITIVE STOPS FOR ROTATION WHEN NEAR POWER LINES? <br /> (101017 <br /> 53. IS THERE ANY VISIBLE EVIDENCE OF DAMAGE TO 00061? (2!131,14.0.01) <br /> 54. IS THE BOOM POSITION INDICATOR OPERATING AND VISIBLE TO OPERATOR? (14A.04, 11.0,17, <br /> L1.0s, 14.P.03, 14.0.04) <br /> 55. HAVE ALL OPERATORS HAD A CURRENT PHYSICAL EXAMINATION? (06101,06!1.001 <br /> 56, IS BRAKING EQUIPMENT CAPABLE OF EFFECTIVELY BRAKING. LOWERING AND SAFELY HOLDING <br /> A LOAD OF AT LEAST THE FULL RATED LOAD AS REQUIRED? (10.C.04) <br /> REMARKS: <br /> CERTIFICATION: 1 hereby certify that this iteof 99uipTnrnt is in good operating condition ond that it meets <br /> m <br /> oft above rrquirernents except 0.r noted under remarks. <br /> SIGNATURE OF COMPETENT MECHANIC DATE <br /> SIGNATURE OF SUPERINTENDENT/QUALITY CONTROL ENGINEER DATE <br /> PAGE 3 OF 3 PAGES <br /> CESPD Form 150—R <br /> 1 Apr 90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.