My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOURBON
>
1413
>
2300 - Underground Storage Tank Program
>
PR0231869
>
INSTALL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:55 AM
Creation date
11/5/2018 12:13:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1994
RECORD_ID
PR0231869
PE
2361
FACILITY_ID
FA0003958
FACILITY_NAME
AT&T California - UE694
STREET_NUMBER
1413
STREET_NAME
BOURBON
STREET_TYPE
St
City
Stockton
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
1413 Bourbon St
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BOURBON\1413\PR0231869\INSTALL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. PLAN REVIEW GUIb.—,LINES <br />a. The enclosed plan review sheet is provided for your information to assist you in interpreting <br />our requirements for your new UST system. <br />b. A copy of the California UST Regulations may be obtained from the State Water Resources <br />Control Board at (916) 739-4332. <br />C. Permits and/or plan check approval may also be required by the San Joaquin Air Pollution <br />Control District, County/City Building Department and Fire District in your respective area. <br />d. Complete and submit the State Water Resources Control Board "Facility Permit (A)" and <br />"Tank Permit (B)" application forms. <br />e. A minimum of 3 inspections will be conducted on the UST system installation. A $78 per <br />hour inspection fee shall be charged for additional inspections or reinspection as required. <br />(See required inspection below) <br />f. Applicant/contractor to adhere to the approval plan and any change or deviation shall be <br />reported and approved by PHS/EHD prior to installation. <br />g. Application for installation of underground tanks are only valid for the calendar year in which <br />it has been issued. A permit may be extended into the next calendar year if a letter is sent <br />to PHS-EHD requesting this extension thirty days prior to the end of the calendar year. A <br />one year --one time extension may be granted by PHS-EHD upon receipt of this letter. <br />4. REQUIRED INSPECTIONS <br />All appointments for inspection must be made at least 48 hours in advance for the following: <br />a. Primary and secondary tank(s) shall be tested pneumatically at 3 - 5 p.s.i. for one hour, one- <br />half hour for primary tank and one-half hour for secondary tank. Double walled tanks are <br />exempt if annular space is monitored using either pressure or vacuum testing. (All external <br />connection shall be soap tested while under pressure) <br />b. Pressure piping shall be hydrostatically tested to 150% or pneumatically tested to 110% of <br />maximum anticipated system pressure but does not less than 5 lbs. per square inch at the <br />highest point of the system for a minimum of 20 minutes. <br />C. All lines other than pressure piping shall be pressure tested at not less than 3 p.s.i. and not <br />more than 5 p.s.i. for a minimum of 20 minutes and soap tested while under pressure. <br />d. Containment sumps shall pass a 24 hour leak tesL <br />e. Overfill protection shall be capable of draining liquid back into fuel tanks. <br />e. Monitoring system shall pass a functional test The functional test shall consist of the <br />activation of the alarm via the monitoring probes/sensors. <br />f. Final inspection and approval to operate will be granted after the above requirements are <br />satisfied and a hard copy of the precision test is submitted to inspector at site. <br />The contractor's approved printset of the UST installation shall kept at the job site and must be shown to the <br />inspector upon request. In addition, the Local Fire Department shall approve UST installation prior to <br />commencement of work - <br />If you need further assistance, or wish to schedule an appointment to discuss the plan review or field <br />inspection, please contact our Underground Storage Tank Staff at (209) 468-3427. <br />
The URL can be used to link to this page
Your browser does not support the video tag.