Laserfiche WebLink
HEALTH AND SAFETY PLAN <br /> Brandon Construction's Health and Safety Program is designed to meet the requirements <br /> of 29 CRF 1910.120. <br /> The objective of this Health and Safety Plan is to establish health and safety guidelines for <br /> the removal of one 1000 gallon underground fuel storage tank (UST) located at the Pacific <br /> Bell facility in Stockton, California. The project will consist of removal of one 1000 gallon <br /> UST, excavation, removal and disposal of one 1000 gallon UST, install one 3000 gallon <br /> UST, collecting soil samples for laboratory analyses, collecting and analyzing <br /> groundwater samples, if necessary, backfilling and resurfacing of the excavation, and <br /> general site cleanup following the completion of site operations. General information <br /> pertaining to the site is provided in Table 1. <br /> TABLE 1 <br /> GENERAL INFORMATION <br /> HEALTH AND SAFETY PLAN <br /> PACIFIC BELL <br /> Stockton, California <br /> Site: Pacific Bell <br /> Location: Stockton, California <br /> Background Review: One existing 1000 gallon diesel UST used for standby generator <br /> being upgraded to 3000 gallon system. <br /> Site/Hazard Overview <br /> Apparent Hazard: low <br /> Type of Facility: telephone switching facility <br /> Status of Facility: active <br /> Waste Types: liquid, sludge <br /> Waste Characteristics: volative <br /> Hazard Type: ]vapors, contract <br /> page 2 <br />