Laserfiche WebLink
�.. <br /> STATE OF CALIFORNIA -ftw •`�� <br /> STATE WATER RESOURCES CONTROL BOARD m�. �g <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 6 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 1.21,:21 64"ae (, , <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.P / B. MANUFACTURED BY: L/ <br /> C. DATE INSTALLED(MODAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A ❑ I MOTOR VEHICLE FUEL 4 OIL B. C. 1# REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM E:380 EMPTY ❑ 1 PRODUCT ❑ lb PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 8 M85 <br /> 3 CHEMICALPRODUCT [:3 95 UNKNOWN 2 WASTE 0 £ML RADE UNLEADED ❑ SADEDJOTTHER(DESCR❑IBE IN REM D.BELOW) <br /> D. IF(Al)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED QL C. .S-99'. <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK � BARE STEEL [72 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (P"-ry Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER UNED ❑ 2 ALKYD LINING ❑ 3 EPDXY UNING ❑ 4 PHENOUC LINING <br /> LINING OR ❑ 5 GLASS UNING ❑ 6 UNUNED 95 UNKNOWN ❑ 99 OTHER <br /> COATING 1S UNING MATERIAL COMPATIBLE WITH 100% METHANOL? %_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE95 UNKNOWN E:] 99 OTHER <br /> E.SPILL AND OVERFILL,GLC. SPILL CONTAINMENT INSTALLED(YEAR) O FILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO_ STRIKER PLATE YES_ NO_ DISPENSER CONTAINMENT YES_ NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A.9W3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 UNED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 S L W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION j 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑1 RECH 1 LINE LEAK ❑2 UNF TMM m ❑3 CONfIXLtlU4 NTER3TRML M 4 ElECTRIX#C UNE ❑5 A.T .PUW ❑ 99 OTHER <br /> bETEOTOR MONTOn <br /> MVING M9 Um OETECT011 91UTWVN! <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 RRECONCILIATION UAL INVENTORY ❑ 3 VAOZEMONIITORING ❑ 4 AUTOMATIGAUGINGC TANK ❑5 MON TORINGOUND �R ❑ 6 ANNUALTESTING <br /> ❑ 7 <br /> MONITORING INTERSTITIAL ❑ B SIR ❑ 9 TANKCGAUGINGAL ❑10 MONTHLY TANK 5 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PUCE) <br /> 1.ESTIMATED DATE USED O/O NR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> /07,49c 1SUB STA NCE REMAINING _GALLONS INERT MATERIAL? YES O N <br /> THIS FORM HAS BEEN' COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTm SSN3NATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW 5d <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# 5H I 12 3 /6 <br /> PERMIT NUMBER I FIERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE q/ <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR I ALLATIONS.THIIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PLD 'LE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE U' `GROUND STORAGE TANK REGULATIONS <br /> FORM B (6.95) `ol Iftw FOROD3413,1V <br />