My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1011
>
2300 - Underground Storage Tank Program
>
PR0503343
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 11:56:26 AM
Creation date
11/5/2018 12:16:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0503343
PE
2381
FACILITY_ID
FA0005794
FACILITY_NAME
FRANK SPINGOLO TRUCKING CO INC
STREET_NUMBER
1011
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14315013
CURRENT_STATUS
02
SITE_LOCATION
1011 N BROADWAY AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BROADWAY\1011\PR0503343\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
1/24/2012 8:00:00 AM
QuestysRecordID
106921
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�... <br /> SPATE OF CAl1FORNA <br /> STATE WATER RESOURCES CONTROL BOARD 3 <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION• FORM B �e <br /> `�tsONN� <br /> COMPLETE A SEPARATE FORM FORE TANK SYSTEM <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ETr5 CHANGE OF INFORMATION ❑ 7 PERMANENTL CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMO D <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: Qe'l A/ , Qj-Oli,dLJ <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED AY/YEAR) u�, D. TANK CAPACITY IN GALLONS: <br /> II.TANK TENTS IFA-11SMARKED.COMPLETE REM C. <br /> 1 MOTOR VEHICLE FUEL ❑ 6 OIL S, C, ❑ 1aUNGULARD 8 3 DIESEL ❑ 6 AVIATION GAS <br /> A. O 2 PETROLEUM ❑ 80 EMPTY 1 PROIXICT ❑ 1b IUM 6 GASAHOL ❑ 7 METHANOL <br /> NLEADE <br /> ET <br /> ❑ 3 CHEMICAL PRODUCT O 95 UNKNOWN ❑ 2 WASTE 2 LEADED D ❑ 99 JOTHER L(DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.0: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX <br /> A. TYPE OF Q 1 UBLE WALL F-13 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM GLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL F—] 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE e POLYVINYL CHLORIDE ❑ 7 ALUMINUM D 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ D LINING ❑ 3 EPDXY LINING ❑ 6 PHENOLIC LINING <br /> C.INTERIOR F75 GLASS LINING <br /> LINING 6 UNLINED 96 UNKNOWN [j99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 ATING F-] 3 VINYL WRAP E::] 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE O 96 UNKNOWN O 99 OTHER <br /> IV.PIPING INFORMATION RCLE A IFABOVEGROUNDOR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U Sucr A u A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELW/COATING A U 8 10D% METHANOL COMPATIBLENFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3INTERSTITIAL ❑ 99 OTHER <br /> MONITORING <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAININGGALLONS INERTMATERIAL7 YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 8 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM 8 (9.90) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.