My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1705
>
2300 - Underground Storage Tank Program
>
PR0501736
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 12:55:43 PM
Creation date
11/5/2018 12:18:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0501736
PE
2381
FACILITY_ID
FA0009518
FACILITY_NAME
GEORGE F SCHULER INC
STREET_NUMBER
1705
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14315007
CURRENT_STATUS
02
SITE_LOCATION
1705 N BROADWAY AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BROADWAY\1705\PR0501736\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
1/24/2012 8:00:00 AM
QuestysRecordID
106396
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA s <br /> STATE WATER RESOURCES CONTROL BOARD ' <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B eo r� , <br /> COMPLETE A SEPARATE FORM FOR EACH TA dYSTEM <br /> :' . <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 8 TEMPORARY TANK CLOSURE O 8 TANK REMOVED U, q <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 7tp ^J r O Ga Gt/W 1 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNERS TANK I.D.• CI).)— B. MANUFACTURED BY: uk <br /> C. DATE INS TALLED(M(YDAY/YEAR) a D. TANK CAPACITY N GALLONS: <br /> II.TANK C ENTS IFA-11SMARKED,COMPLETE ITEM C. <br /> REGULAR 3 DIESEL <br /> A, 1 MOTOR VEHICLE FUEL d OIL B. C UNLEADED ❑ e AVIATXXJ GAS <br /> ❑ 2 PETROLEUM W EMPTY 1 PRODl1CT ❑ 1b PREMIUM 4 GASOHOL ID 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTED 5 JET L <br /> O 2 LEADEDB W OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.m: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.ANDC.AND ALLTHAT APPLIES IN BOX DANDE <br /> A TYPE OF ❑ LE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM 2 LE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK l5r, BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ e POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 KYD LINING ❑ 3 EPDXY LINING 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 8 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100%M THANOL T YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 TING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED4+LA5_TIC <br /> PROTECTION ❑ 5 CATHODICPROTECTION 9/ NONE ❑95 UNKNOWN a 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EOUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A T A U 2 PRESSURE A U 3 GRAVITY A U 09 OTHER <br /> B. CONSTRUCTION A U A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U B CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 0 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 29 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 5 MONOORING ❑W OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ ADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> ❑ e TANK TESTING ❑ 7 INTERSTITIAL MONITORING 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE T U ED(MO/DAV/YR) 2.ESTIMATED GUANTITY OF 3.WAS TANK FILLED WITH YES ❑ <br /> 1 SUBSTANCE REMAINING GALLONS INERTMATERIAL7 No <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED d$IGNATUREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION* FACILITY# TANK# CSC0IF75/7 <br /> STATE I.D.# M�l I I I CRS-17171 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMITEXPIRATION TFC <br /> �0 /I <br /> FORM 8 (7-91) THIS FORM MUST BE ACCOMPANIED BY#PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM E FILED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.