Laserfiche WebLink
I.. RECEIVED <br /> UNIFIED PROGRAM CONSOLIDATED FORM JAN ] j <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN — (Page 2 of 2) SAN JOAQUIN COUNTY <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORINGHEALTH DEPA <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ 1 CON INUOUS ELBCI"RONIC MONI'rORINO X 2.Pt.OA'IANDCHAINASSEMBLY ❑ 3 ELECrRONICsTAND-ALONL +"`•' <br /> ❑ 1.NO DISPENSERS ❑ 99.OTHERS _ <br /> LEAK MONITOR MANUFACTURER: +"'-S6 MODEL W: <br /> LEAK SENSOR MANUFACTURER: +"'"M7 MODEL H(S): +wsn <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES & b.NO <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES CK b.NO <br /> FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES X b.NO 41Mw'I <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT A'T'THE DISPENSER. Ida. YES ❑ b.NO 4'Mw''- <br /> UDC CONSTRUCTION I.SINGLE WALL ❑ 2 DOUBLE WALL +1M113 <br /> IF DO IB L WA anu+a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY. ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS, ❑ a.YES ❑ b.NO 4" b <br /> VII. PERIODIC SYSTEM TESTING <br /> 1 ELI) TESTING. THIS­FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED +1M'115 <br /> LEAK D EL MUST BE PERFORMED, PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.133 CCR;Mu II <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. +•Mww <br /> ® 3 SPILL BUCKETS ARE TESTED ANNUALLY <br /> VIII. RECORD KEEPING <br /> The fbllownng monitoring/maintenance records are kept for this facility: +aua <br /> ® a ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c TANK INTEGRITY TESTING RESULTS <br /> ❑ d SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g CORROSION PROTECTION 60-DAY LOGS <br /> h EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX" TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirlob duties +•M.e'n <br /> REFERENCE DOCUMENTS MA INl A INED AT FACILITY!Check all that opplo <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) w+ro <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULA"TONS <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW rnr.r'r <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: '-HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION "UNDERSTANDING AUTOMA"FIC TANK GAUGING SYSTEMS" " M <br /> ❑ OTHER(Specifv): <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council <br /> (ICC) 'The ""Designated UST Operator'will vain foci l it employees in the proper operation and maintenance of the US T systems annually,and within 30 <br /> days of hire This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's Mast management practices <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan <br /> Namers)orcomact persons)for emergencies and monitoring alarms <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pa es with additional ' enation ons cite monitoring procedures are attached to this plan. 41"1-71 <br /> Iw 1 6K, `1S�e <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that I.1 the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by thoplan occurs.2 1 all conditions that indicate a possible release are investigated,and 3.)all monitoring records are maintained properly, <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE. <br /> NAME KO -F1/f'b6')(,Q +-M'.n TITLE: /�J7ZgOft AA"Ts;"— +,"•n <br /> NAME. 01.7+ TITLE: 14*gPxrT Su/GRVI 5.0� 411,75 <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility.provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> w <br /> I . WNER/OPERATOR SIGNATURE <br /> CERTIFICATION:t certify th t[h nfo a rovided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DA'IF,. 4'"07 <br /> REPRESENTING Ira,t.o�Mzrro rales cn.aa,o„x.no., sn�mue.cuR.,a.mm�,eoro••x.r +1101, 1-11-13 .-�- <br /> APPLICANT NAME(print)' 4'M'-78 APPLICANTTITLE: JF17i <br /> U PCF UST-D(12/2007)-3/4 www.unidces.org <br />