Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN- PAGE 1 (One toren tier facility) <br /> TYPEOFACTION ❑ LNEW PLAN ❑ 2.CHANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY 10 it (Agenn Use Only) �} — 0 0 101 -151611 t <br /> BUSINESS NAME(Same as FACILITY NAM F) t <br /> P-Iv�Pe►I.+r �.+r*+�I,,r� Ntn-a.afrn (tssran� <br /> BUSINESS SITE ADDRESS lot. BUSINESS SITE CITY la. <br /> 9Sb N �avf. Stetr_t$IS <br /> II. SPILL C NTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g..activate pump shut-off,etc.)and if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> ' contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> .Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with my <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is nun-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors), it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc,will not be disposed to storm water systems. <br /> '+ We will review secondary containment systems for possible deterioration if any orthe following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies we replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE.BUT AVAILABLE FOR USE IF NEEDED: (Conr (ere on 1v ifa licable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> 1 Rvm, RI1. R]I. R31. <br /> S—VK1 MO`A'N! RI y� .� R21 L1t± <br /> RI t. R3. R1? <br /> R14 R24. RN <br /> Rly, R215. R)a <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R+a. TITLE <br /> NAME R+1. TITLE <br /> ',f' R31TT .pO}-- MArsile-&_ <br /> .NAME Rae. 'TITLE Rri <br /> NAME R+3. TITLE R<y. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION Nfi. INSPECTION BY QUALIFIED PERSONS <br /> ��� ❑3. RECALIBRATION OF EQUIPMENT RW <br /> []goO'rHF.R(SPc.N): ■H ECEI V `C ED R61 <br /> JAN <br /> I'N-022B-1/3 www.uniducs.org SAN JOAQUIN COUNTY Rev.04/02108 <br /> ENVIRONMENTAL <br /> HEALTH DEPARTMENT <br />