Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 E. Main St. • Stockton, CA 95202-3029 • Pbone(209)468-3420 <br /> Donna Heran, R.E.H.S., Director <br /> ENVIRONMENTAL HEALTH <br /> SAN JOAQUIN COUNTY CERTIFIED UNIFIED PROGRAM AGENCY <br /> PERMIT TO OPERATE <br /> Program Permit Permit <br /> Record ID Number Program Code and Description <br /> Valid <br /> PRO519026 PT0012265 2220-SMALL QUANTITY HAZARDOUS WASTE GENERATOR FACILITY 1/1/2011 To 12/31/2011 <br /> Hazardous Waste Generator Program, <br /> In order to maintain the permit to operate, Hazardous Waste Generators shall comply with California Health and Safety Code,Div.20,Chap.6.5,Art.2-13, <br /> Sec,25100 et segs and Title 22,California Code of Regulations,Chap.20___ " <br /> --- -- ---------------- ------------------------------ ------ '---- <br /> 31028 2300- ERGROUND STORAGE TANK FACILITY 1/1/2011 To 12131/2011 <br /> JJRde. t _gym <br /> California Health and Safety Code,Div.2Q,Chap.6,7 and Title 23,California Code of Regulations,Chap, 16_ _ _ _ _ <br /> ....._ ____________le _._._..___ . . _ .._._- ___._. <br /> P/E Tank# Tank Record ID Permit# CapacityContents Permit Status System Type Leak Detection <br /> 2362 5 390002310280102805 PT0004974 12,000 MIDGRADE UNLEADED Active,billable DOUBLE WALLED Continuous Intem in ial Momma, <br /> 2360 6 390002310280102806 PT0004975 5,000 DIESEL Active,billable DOUBLE WALED Continuous Interstitial Monitoring <br /> Underground Storage Tank Permit Conditions <br /> 1) The Permit to Operate will become void if Annual Permit Fees and Service Fees are not paid and/or the UST systems)fails to remain in compliance with these Permit Conditions, <br /> 2) In order to maintain the operating permit,the owner and operator shall comply with the H&S Code,Div,20,Chap.6.7 and 6.75;and CCR,Tide 23,Chap.16 and 18,as well as any conditions <br /> established by San Joaquin County, <br /> 3) If the Tank Opermor(s)is different from the Tank Owner,or if the Permit to Operate is issued to a person other that the owner or operator of the lank,the Permittee shall ensure that both <br /> the Tank Owner and tank Operator receive a copy of the permit. <br /> 4) Written Monitoring Procedures and an Emergency Response Plan most be approved by the Environmental Health Department(EHD)and we considered UST Permit Conditions. The approved <br /> monitoring,response,and plot plans shall be maintained onsite with the permit <br /> 5) The Permittee shall comply with the monitoring procedures referenced in this permit. <br /> 6) The Pennines shall perform testing and preventive maintenance on all leak detection monitoring equipment annually,or more frequently if specified by the equipment manufacturer,and <br /> provide documentation of such servicing to this office. <br /> 7) ht the event of spill,leak,or other unauthorized release,the Permitee shall comply with the requirements of Tide 23 CCR,Chap.16,Art.5,and the approved Emergency Response Plan. <br /> 8). Written records of all monitoring performed shall be maintainedon-site by the operator and be available for inspection for a period of at least three years from the date the monitoring was <br /> performed. .. <br /> 9) The EHD shall be notified of any change in ownership or operation of the UST system within 30 days of such change. <br /> 10) Upon any change in equipment,design or operation of the UST system(including change in lank contents or usage),the Permit to Operate will be subject to review,modification or <br /> revocation. <br /> 11) Construction,repair and/or removal pemtits are required from the EHD prior to any change,repair or removal of UST system equipment. <br /> 12) The Pennine shall submit an arcual report documenting compliance with the UST Pemdt Conditions within 30 days of the date of the issuance of this permit. <br /> 13). This Permit to Operate shall not be considered permission to violate any laws,ordinances or statutes of any other Federal,State or total agency. <br /> 14) A"Conditional"Permit may be revoked if corrections specified on the inspection report are not completed by the date(s) indicated. <br /> PERMITS TO OPERATE may be SUSPENDED or REVOKED for cause. <br /> i <br /> PERMIT(s)Valid only for: RIVER POINT LANDING MARINA <br /> DBA: RIVERPOINT LANDING MARINA-R <br /> Tank Owner: RICHARD DUNN <br /> THIS FORM MUST B$DISPLAYED CONSPICUOUSLY ON THE PREMISES <br /> Regulated Facility: RIVER POINT LANDING MARINA-RESORT* Facerty11D FA0003811 <br /> 4950 BUCKLEY COVE WAY Account ID AR0003396 <br /> STOCKTON CA 95219 Issued 2/4/2011 <br /> Billing Address: <br /> RIVER POINT LANDING MARINA—RESORT* <br /> PO BOX 7995 <br /> STOCKTON 'CA 95267 <br /> 7028 pi <br />