Laserfiche WebLink
S WRCB,January 2002 Page_of_ <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: X Tank Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure X Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Gast Vacuum Pump/Vacuum Gauges in Hg. Equipment Resolution: -%"x-30"Hg. <br /> Tank# 1 Tank#2 Tank# ;rank# <br /> Is Tank Exempt From Testing?' No No <br /> Tank Capacity: I2K 5K <br /> Tank Material: Jacketed Double Jacketed Double <br /> Wall Steel Wall Steel <br /> Tank Manufacturer: Joor Joor <br /> Product Stored: Plus 89 Red Diesel <br /> Wait time between applying 15 Minutes 15 Minutes CN IRONMENT <br /> vacuum and startingtest: <br /> Test Start Time: 10:30 10:40 <br /> Initial Reading(R,): -7 Hg. -7 Hg. <br /> Test End Time: 11.30 11:40 <br /> Final Reading(Rr): -7 Hg. -7 Hg. <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(R,-R,): 0 Hg. 0 Hg. <br /> Pass/Fail Threshold or Criteria: No Loss in Hg. No Loss in Hg. <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? Yes Yes <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {Califomia Code of Regulations,Title 23, Section 2637(a)(6)) <br />