Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: D Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#1-Plus 89 Sump#2 Red Diesel Sump# Sump# <br /> Sump Diameter: 36" 30" <br /> Sump Depth: 21" 21" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 9 Ya„ 10" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 4„ 8" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' Water Level 12" Water Level 12" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes N�Cneoetmeee� <br /> product and water , <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe yes Yes <br /> shutdown? <br /> Was fail-safe verified to be No No <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 10:50 10:45 <br /> Initial Reading(Ri): .001 .001 <br /> Test End Time: 11:20 11:15 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />