Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps X <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: ❑Pressure Vacuum ❑Hydrostatic <br /> 11 Other(Specify)Test Equipment Used: Equipment Resolution: <br /> Fill Sump# Fill Sump d Fill Sum # Fill Sum # <br /> Sum Diameter: <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying NMEN'rA <br /> water and starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Chane in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: <br /> Is there a sensor in the sump? <br /> Does the sensor alarm when <br /> either product or water is <br /> detected? <br /> Was sensor removed for testing? <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />