Laserfiche WebLink
ATTACHMENT 2 <br /> Soil samples will be taken by authorized personnel employed <br /> by the recognized laboratory under the direction and super- <br /> vision of the local County Health District . The sampling <br /> will be taken when the tank is removed from the hole . Soil <br /> analysis will consist of the following as referred to in <br /> "Sampling Protocol for Tank Removals" . <br /> WATER NOT PRESENT IN TANK PIT : <br /> Tank Size (A ) 0 to 1 , 000 gallons a minimum of one soil <br /> samples will be taken from either the pump <br /> or the fill end of the tank, below bottom <br /> of tank . <br /> (B ) 1 , 001 to 10 , 000 a minimum of two soil samples <br /> will be taken . One sample from each end of <br /> the tank , below bottom of tank . <br /> (C ) 10 , 001 and up a minimum of three soil samples <br /> will be taken space evenly along the length <br /> of the tank , below bottom of tank . <br /> WATER IS PRESENT IN TANK PIT: <br /> Tank Size (A ) 10 ,000 gallons or less ( single tank ) the <br /> minimum number of soil samples will be <br /> two from the tank wall at each end of soil / <br /> ground water interface . The minimum number <br /> of water samples shall he one . <br /> (B ) 10 ,001 and larger tank , or a cluster of <br /> tanks the minimum number of soil samples <br /> to be taken shall be four , one from each <br /> wall at soil/ground water interface . A <br /> minimum of one water sample shall be taken . <br />