Laserfiche WebLink
.. <br />_I <br />*41 <br />M Monitoring System Certification A EC E I VL E) <br />UST Monitoring Site Plan <br />Site Address: Miracle Mile Mart -244 W Harding Way Stockton 95204 MAY 0 8 2015 <br />HARDING WAY <br />..................................................... <br />. ............................ <br />KEY <br />.......... <br />A=ANNULAR <br />..................................................... <br />F =FILLS <br />.............................................. <br />T = TURBINE <br />....... <br />P=PROBE <br />... <br />........ <br />V=VAPOR <br />VENTS <br />X = SUMP SENSOR <br />VR <br />L=PLLD <br />....Q <br />M = Manway <br />_ <br />B = Brine Sensor <br />O <br />STORE <br />.... <br />I= Smart Sensor <br />. <br />S=STP <br />Date map was drawn: 6-26-14. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitonng System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, 4 installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes if used for leak detection). In the space provided, note the dale this Site Plan was prepared. <br />Monitoring System Certification Page 4 o1`4 2/21/07 <br />