My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
5451
>
2300 - Underground Storage Tank Program
>
PR0232598
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 4:28:33 PM
Creation date
11/5/2018 12:47:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0232598
PE
2381
FACILITY_ID
FA0004520
FACILITY_NAME
KJAX RADIO*
STREET_NUMBER
5451
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
10122041
CURRENT_STATUS
02
SITE_LOCATION
5451 E HARDING WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARDING\5451\PR0232598\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
5/14/2013 8:00:00 AM
QuestysRecordID
161218
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD �� a,•9 c <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EA TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT EFOI-CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: V AJ. `G/ Dora o 6 s <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-SPECIFY IF UNKNOWN <br /> A OWNERS TANK I.D. O B. MANUFACTURED BY: <br /> (�L <br /> C. DATE INSTALLED(MO/DAV/YEM) �t/G D. TANK CAPACITY IN GALLONS: <br /> SU' O Cl <br /> ILTANK ENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. O 1a REGULAR <br /> R 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ BO EMPTY 1 PRODUCT tb PREMIUM 4 GASAHOL <br /> ❑ UNLEADED ❑ 5 JETFUEL 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ W OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARKONE ITEM ONLY IN BOXES A,B.ANOC,ANDALLTHATAPPUES IN BOX DANDE <br /> 1 LISLE WALL 3 SINGLE WALL WITH EXTERIOR LINER <br /> A. TYPE OF ❑ ❑ as UNKNOWN <br /> SYSTEM �GLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) O 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrlmaryTAnk) ❑ B BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ W OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 KYO LINING r-] 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR <br /> ❑ 5 GLASS LINING 8 UNLINED ❑ 95 UNKNOWN ❑ aB OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP n ?,/COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION F-15 CATHODIC PROTECTION 91 NONE ❑95 UNKNOWN ❑ W OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFA13OVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A USUCTI A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U W OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 8 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ MOERTITLA ❑ W OTHER <br /> V.TANK LEAK DETECTION <br /> FDF1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORIN6TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ W OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2 ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL? YES ❑ �❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 8 SIGNANREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY* TANK#�-" <br /> STATE I.D.# 31j I I la 1519 <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMITE IOUE <br /> E r 9 <br /> FORMS (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORD034 <br /> �`../ <br />
The URL can be used to link to this page
Your browser does not support the video tag.