My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2008 CLOSURE IN PLACE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2300 - Underground Storage Tank Program
>
PR0501853
>
REMOVAL_2008 CLOSURE IN PLACE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 12:57:50 PM
Creation date
11/5/2018 12:49:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2008 CLOSURE IN PLACE
RECORD_ID
PR0501853
PE
2381
FACILITY_ID
FA0005245
FACILITY_NAME
Granite Construction Company-French Camp Facility
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
French Camp
Zip
95231
APN
193-270-03
CURRENT_STATUS
02
SITE_LOCATION
10500 S Harlan Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10500\PR0501853\EXEMPT UST CIP 2008.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` KLE ! (VLELDEr <br /> ` generally made with an incomplete knowledge of the subsurface and/or historic <br /> conditions applicable to the site. The conclusions of this assessment are based on field <br /> 4 observations and analytical results obtained from soil samples collected from the site. <br /> More extensive studies may further reduce the uncertainties associated with this <br /> assessment. Kleinfelder should be notified for additional consultation if the client wishes <br /> 6, to reduce the uncertainties beyond the level associated with this report. No warranty, <br /> expressed or implied, is made. <br /> Kleinfelder offers various levels of investigative and engineering services to suit the <br /> varying needs of different clients. Although risk can never be eliminated, more detailed <br /> and extensive investigations yield more information, which may help understand and <br /> manage the level of risk. Since detailed investigation and analysis involves greater <br /> expense, our clients participate in determining levels of service which provide adequate <br /> information for their purposes at acceptable levels of risk. Granite Construction <br /> 6 Company has reviewed the scope of work and determined that it does not need or want <br /> a greater level of service than what was provided. <br /> Regulations and professional standards applicable to Kleinfelder's services are <br /> continually evolving. Techniques are, by necessity, often new and relatively untried. <br /> Different professionals may reasonably adopt different approaches to similar problems. <br /> Therefore, no warranty or guarantee, expressed or implied, will be included in <br /> Kleinfelder's scope of service. <br /> 6. During the course of the performance of Kleinfelder's services, hazardous materials <br /> may have been discovered. Kleinfelder will assume no responsibility or liability <br /> whatsoever for any claim, loss of property value, damage, or injury that results from pre- <br /> existing hazardous materials being encountered or present on the project site, or from <br /> the discovery of such hazardous materials. <br /> Nothing contained in this scope of work should be construed or interpreted as requiring <br /> Kleinfelder to assume the status of an owner, operator, generator, or person who <br /> arranges for disposal, transport, storage or treatment of hazardous materials within the <br /> meaning of any governmental statute, regulation or order. <br /> This document may be used only by the client and only for the purposes stated, within a <br /> reasonable time from its issuance. Land use, site conditions (both on site and off site) <br /> or other factors may change over time, and additional work may be required with the <br /> passage of time. Based on the intended use of the report, Kleinfelder may require that <br /> additional work be performed and that an updated report be issued. Non-compliance <br /> with any of these requirements by the client or anyone else will release Kleinfelder from <br /> ` any liability resulting from the use of this document by any unauthorized party. <br /> 90163.T03/STO7R1061 January 3,2008 <br /> 0 2007 Kleinfelder Page 6 of 7 <br /> V <br />
The URL can be used to link to this page
Your browser does not support the video tag.