My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2300 - Underground Storage Tank Program
>
PR0501853
>
REMOVAL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 1:00:01 PM
Creation date
11/5/2018 12:49:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1992
RECORD_ID
PR0501853
PE
2381
FACILITY_ID
FA0005245
FACILITY_NAME
Granite Construction Company-French Camp Facility
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
French Camp
Zip
95231
APN
193-270-03
CURRENT_STATUS
02
SITE_LOCATION
10500 S Harlan Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10500\PR0501853\REMOVAL 1992.PDF
QuestysFileName
REMOVAL 1992
QuestysRecordDate
5/9/2013 8:00:00 AM
QuestysRecordID
158648
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLL, PROTOCOL FOR ROUTINE TANK REyVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br /> contamination is documented during closure,an Unauthorized Release Notification must be completed and submitted within <br /> five (5) working days. California Health & Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 1,000 - 10,000 2 per Tank 1 at each End of Tank <br /> 2�3rt} > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> # (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> �/3 y Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TANK PIT p <br /> Soil samples shall be obtained be th the slab within native soils. Penetration through the obstruction will be required in <br /> order to collect the samples. (Phys 1 removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE M NUMBER OCATION of SOIL SAMPLES <br /> # (Gallons) of SO LES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000 - 10,000 5 per T Center and Ends OR Sides of Tank <br /> > 10,000 5 More per Tank and Middle and generally spaced along <br /> the len of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> TANK & PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> EH 23 047 (REV 4/23/91) <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.