My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2300 - Underground Storage Tank Program
>
PR0501853
>
REMOVAL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 1:00:01 PM
Creation date
11/5/2018 12:49:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1992
RECORD_ID
PR0501853
PE
2381
FACILITY_ID
FA0005245
FACILITY_NAME
Granite Construction Company-French Camp Facility
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
French Camp
Zip
95231
APN
193-270-03
CURRENT_STATUS
02
SITE_LOCATION
10500 S Harlan Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10500\PR0501853\REMOVAL 1992.PDF
QuestysFileName
REMOVAL 1992
QuestysRecordDate
5/9/2013 8:00:00 AM
QuestysRecordID
158648
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SITE SAFETY PLAN <br /> GRANITE CONSTRUCTION COMPANY <br /> 10500 SOUTH HARLAN ROAD <br /> FRENCH CAMP, CALIFORNIA <br /> A. SITE DESCRIPTION <br /> Date: December 20, 1991 Location: 10500 South Harlan Road <br /> French Camp, CA <br /> Hazards: Diesel fuel, unleaded gasoline, waste oil. <br /> Area Affected: Underground tank and possibly surrounding <br /> soil, if contaminated. <br /> Surrounding Population: Sparse. <br /> Topography: Flat . <br /> Weather Conditions: Fair to poor; average temperature 60°F. <br /> Additional Information: None. <br /> B. ENTRY OBJECTIVES <br /> The objective of the entry to the potentially contaminated <br /> area is to remove one (1) 12, 000-gallon underground diesel <br /> tank, one (1) 20,000-gallon underground diesel tank, two (2) <br /> 10,000-gallon underground unleaded gasoline tank, one (1) <br /> 2,000-gallon underground waste oil tank. <br /> C. ON-SITE ORGANIZATION AND COORDINATION <br /> The following personnel are designated to carry out the <br /> stated job functions on site: <br /> PROJECT TEAM LEADER: Mike Fuller <br /> FIELD TEAM MEMBERS: To be given on site <br /> LOCAL AGENCY REPRESENTATIVES: <br /> San Joaquin County Environmental Health Representative <br /> French Camp Fire Marshal, Mr. Lewis McCall <br /> CONTRACTOR(S) : Aronson Engineering <br /> 6809 McComber Street <br /> Sacramento, CA 95828 <br /> (916) 381-1600 <br /> PAGE 1 OF 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.