My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10998
>
2300 - Underground Storage Tank Program
>
PR0500063
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 2:02:49 PM
Creation date
11/5/2018 12:51:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0500063
PE
2361
FACILITY_ID
FA0004559
FACILITY_NAME
BENETO TANK LINE
STREET_NUMBER
10998
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333030
CURRENT_STATUS
02
SITE_LOCATION
10998 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10998\PR0500063\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC-K{FFIILL EXCAVATION CERTIFICATE l../ <br />Project Location ( D ' " ' ' i(� t K!"Q <br />Owner 'J \ rr_ Phone No. � Z e co <br />,/ 5p3 <br />Contractor ��51Z Al C10_ Phone No. (Loci) 5Zq _ I1�53 License No. 1/q ! 8 (0 7 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12" lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br />backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />Name (Print) <br />Yl �� -2j�7T 1 C> r <br />We rim \ <br />Stgnature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.