Laserfiche WebLink
05/25/2005 11:47 2099829 5 JOES TRAVEL PLA7A PAGE 05 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH I)EPARTMEINT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 . <br /> Mol. <br /> TYPE OF ACTION I.NEW PLAN El2.CHANGE OF INFORMATION <br /> Mot. <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL 11$7s AT THIS FACILfIY- <br /> (Chec%oneitemonly) THIS PLAN COVERS ONI.YTHE FOLLOWING USTSYSTEM(S): <br /> I... FACILITY:INFORMATION <br /> rFACILITYDN(Agency Dae Only)NAME ��lCITYsSITE ADDRESS Q H.•EgMPMENPTESTING.AND PREVEN LVE MAIN ITENANC <br /> quires that"ting,pmvmtvc maintenance,and cal L)mtion of monitoring equipment(c.g.,sensors,probes,line leak detectors,etc.)he performed in Maa• <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified onncl. Mm. <br /> MONITORING EQUIPMENT.1$SERVICED ❑ 1.ANNUALLY 99.OTHER(Specify): i 5 _ <br /> III:'MONITORING LOCATIONS:: <br /> This monitoring pt=' I't include a Site Plan showing the grncral rook and piping Layouts and the iocanons where monitoring Is pernomned(i.c.,location of each sensor, <br /> lint teak detector,monitoring system contort panel,etc J. If you nlreedy have a diagram(c.g.,current UST Monlmring Site Man from a Monitoring System Certification <br /> form,Hazardods Materials Business Plan ma ,etc. which ahowa all Tog <br /> airs!infOmiatiem,include it with this lam. <br /> IV. TANK MONITORING <br /> . >. ....' MIs. <br /> MMOnn''NITORING IS PERFORMED USING'THE FOLLOWING METHOD(Sy(Check all that apply) <br /> TI,CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> 1 �.{ d.UNDER VACUUM M11- <br /> PANEL <br /> CONTAINMENT IS: ❑ s.DRY ❑ b.LIQUID FILLED ql�,e.UNDER PRESSURE U <br /> f lCl2 MODELM MD' <br /> PANELMANIJFACTIHtER: <br /> LEAK SENSOR MANUFACTURER: MIo. MODEL#(S): MIs. <br /> ❑ 2,AUTOMATICTANK GAUGING(ATO)SYSTEM USED TO MONITOR a2jLLE WALL MIs MODEL N: Ma <br /> PANEL MANUFACTURER: <br /> MIT. MODEL#(S): M19. <br /> IN-TANK PROBE MANUFACTURER: <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIG14TLY ❑ e.WEEKLY Mxo. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21' <br /> Mx2. MCI. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. Q b.0.2 g•p.h. ❑ c.OTHER(Specify): <br /> El3.INVENTORY RECONCILIATION C3a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 ' <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> M^3. <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR 12643.1 Mza Mri. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY, ❑ c.OTHER(Specify): <br /> (5.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY c" *"comm-!) <br /> MIS. <br /> 99.OTHER(Spmifj): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mso. <br /> O <br /> 'm}1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)1'fRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLEDT�j c.UNDER PRESSURE. � 4.UNDER VACUUM Mgl' <br /> PANEL MANUFACTURER: Mia. MODEL#: MIs. <br /> LEAK SENSORMANUFACTURER: MX MODELN(S): Mas. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ❑ b.NO AO6' <br /> WILL FAILURVDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Mn. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLAW WHEN A LEAK IS DETECTED MI> <br /> MLLAMANUFACTURF,R(s): MIsMODEL#(S): <br /> ❑ 3.ELECTRONIC IJNE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORM$3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: 'W- MODEL Mdl. <br /> PROGRAMMED LME INTEGRITY TESTS: [] a.MINIMUM MONTHLY 0.2 g.p.h. El b.MINIMUM ANNUAL 0.1 g.p.h. Max. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M°1' <br /> WILL ELLD FATLUREIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M4d <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M43. M46. <br /> 5.VISUAL MONITORING DONE: '9a.DAILY ❑ b.WEEKLY' ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47. <br /> •aegatrev ogenryapprowi ••nllowed far monaaring aflmbaned emagenrygew�w nlel piping only pee ryas:SRsaal.slb%)) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUtREMF,NTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(x)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING 15 CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(specify) Mos. <br /> $JCEHD4(07103).1/4 07423103 <br />