My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 12:01:32 PM
Creation date
11/5/2018 12:57:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\15600\PR0231585\COMPLIANCE INFO 2000 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2004
QuestysRecordDate
4/11/2018 8:20:49 PM
QuestysRecordID
3752482
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: 1p S J y ad U ua&2 al 'a.-4 4 3 k y'gc eq, Oe of festin Servicin 6IVff- <br /> F. In-Tank Gauging/SIR Equipment: 0-CHFcck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-lank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: �.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> IT Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Y;s ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> L ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑'N/A <br /> ❑ No* For electronic LLDs, does the turbine aromatically shut off if any portion of the monitoring system is disable�/A or disconnected? <br /> ❑ X�`110* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> l�N/A malfunctions or fails a test? <br /> ❑ Yes ❑ * For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Q N/A <br /> J Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments' <br /> Page 3 of 3 05/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.