Laserfiche WebLink
F. In-Tank Gauging /SIR Equipment: fr'Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no lank gauging or SIR equipment is installed. <br /> e <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Cl Yes ❑ No* Was accuracy of system product level readings tested? <br /> MNo* Was accuracy of system water level readings tested? <br /> No* Were all probes reinstalled properly?No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section.H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: Q 3 g.p.h.; ❑ 0.1 g.p.h; ❑0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> gr-Y6s ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> Q Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> fd�I%A <br /> ❑ Yes 13 NO* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> a—g/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> Q-i A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Q-19-A <br /> Yes I ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> PageFof3 03101 <br />