Laserfiche WebLink
F. In-Tank Gauging /SIR Equipment: fy'Check (his box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no lank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perfoml leak detection monitoring. <br /> Complete the following checklist: <br /> Cl Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Cl Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes 1 ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section.H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> a Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0.3 g.p.h.; ❑ 0.1 g.p.h ; Cl 0.2 g.p.h. <br /> ¢1 Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> �--Tes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ' ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑' Yes �❑,�No�* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> Q--9/_A <br /> Cl Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0--N/A or disconnected? <br /> 7 Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> C3—N1A malfunctions or fails a test? <br /> 7 Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> 1. Comments: <br /> EAii_L_ <br /> Pagerof 3 03/01 <br />