My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 12:01:32 PM
Creation date
11/5/2018 12:57:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\15600\PR0231585\COMPLIANCE INFO 2000 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2004
QuestysRecordDate
4/11/2018 8:20:49 PM
QuestysRecordID
3752482
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 • Page of <br /> 5. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer Pindustry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> -------------- <br /> Test Method Used: 0 Pressure 0 Vacuum ydostati, <br /> 0 Other(Specify) <br /> Test".Equipment Used: — =Equipment Resolution: <br /> Sump# Sump# Sump# Sump# �4 <br /> Sump Diameter: <br /> sbi 11f <br /> Sump Depth: af- <i 2 <br /> Sump Materia! <br /> Height from Tank Top to Top of <br /> Highest Piping;Penetration: <br /> Height from Tank Top to Lowest 41 <br /> Electrical Penetration: /-S- <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detect' <br /> yquid(both ?Yes DNo 0 NA Ryes 0 No [INA [Ves 0 No =NA 9;-Yes 0 No 11 NA <br /> product and water)? <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe Yes &No -_7 NA 0 Yes E*o 0 NA 0 yes "To --NA <br /> El Yes 9-No 0 NA <br /> Was fail-safe verified to be <br /> o2erational'?* Yes O'No _NA OYes P<To DNA OYes EPPKo __NTA 0 Yes OtMo DNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> ,lest: 0 <br /> /0 /7 <br /> Test Start Time: 3 d G6 ev _3;z� <br /> Initial Reading(Rj): 19 '�' Z' <br /> 9 <br /> Test End Time: /,q' 9 <br /> Final Reading(RF): <br /> / 4- <br /> Test Duration: 2 6;' M 27 <br /> Change in Reading(RF-R,): <br /> PassfFail Threshold or Criteria: <br /> Test Result: 0 Pass 0 Fail 0 Pass 0 Fail q Pass 0 Fail ePass 0 Fail <br /> Was sensor removed for testing? 14'es 0 No NA es 0 No 11 NA eYes ONo __N-A [PYes 0 No 0 NA <br /> Was sensor properly replaced and <br /> verified functional after testing? :�-feS D INO CNA Y'Yes O'No 0 NA es DN'o =NA P'Yes 0 No 0 NA <br /> Comments-/include information on repairs made prior to lestilig, and rec nimendedfollow-upforfailed tests) <br /> [!'the entire depth of the sump is not tested, specify how much was tested. If the answer to Any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.