Laserfiche WebLink
SWRCB,January 2002 • . <br /> Page_of <br /> 8. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equip ed With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br /> Test Method Developed By: Spill Bucket Manufacturer ❑Industry Standard =Professional Engineer <br /> Other(Spzci,fy) <br /> Test Method Used: _Pressure :'& 01 Gnurn ---- Hydrostatic.- <br /> Other(Specrjy) I <br /> Test Equipment Used Equipment Resolution <br /> 3t . <br /> x - <br /> rM q. � Spill Box# Spill Boa I Spill Boa# Spill Boa# <br /> Bucket Diameter: <br /> Bucket Depth:— I - "- <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rt): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result* 11 Pass ❑Fail I ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ' ❑ Fail <br /> C:OMMeUt$-(include information on repairs made prior to testing and recommendedollow up forfailed tests) <br />