My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 12:01:32 PM
Creation date
11/5/2018 12:57:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\15600\PR0231585\COMPLIANCE INFO 2000 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2004
QuestysRecordDate
4/11/2018 8:20:49 PM
QuestysRecordID
3752482
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ODT-890 Leak Detector Test Record` <br /> Contractor Customer <br /> Date Location �' �,�/ Product �" -- <br /> q'-P-�Z /SEYt9 4,111A, Al' z' <rY3MY 0 1 2002 <br /> Technician ENVI:r o,,1-Hi HEALTH <br /> P. ;si11iIT;SERVICES <br /> Submersible Pump Identification <br /> Manufacturer Model No. Serial Number <br /> AJ_;kcleJ <br /> //mS2ieBb' llTt <br /> Leak Detector Identification <br /> Manufacturer Description Other Style Leak Detector <br /> /e /'Fera Diaphragm-type <br /> 5f��Zb 'P Piston-type <br /> Tamper-proof sea]installed? Yes No <br /> Leak Detector in Submersible Pump <br /> Test at Dispenser <br /> '77 <br /> 1. Operating Pump Pressureo4 psi (para. 15) <br /> 2. Gallons per hour rate 3r_0 (para.22) <br /> 3. Line pressure with pump shut ofL_21. psi (para.23) <br /> 4. Bleedback Test with pump off /o D ml (para.26) <br /> 5. Step-through time to full flow—Z-1---s- seconds(para. 30) / <br /> 6. Leak detector stays in leak search position.(para.42) Yes <br /> No <br /> LEAK DETECTOR TEST <br /> Note: Pass=Leak detector fits test protocol <br /> Fail=Leak detector fails test protocol <br /> Pass <br /> Fail <br /> Form 890C(9-1-96) *Complete thermal expansion test before failing leak detector- <br /> 1996 <br /> etector1996 Vaporless Manufacturing,Inc.,Prescott Valley,AZ <br /> ",t <br /> op <br />
The URL can be used to link to this page
Your browser does not support the video tag.