VICINITYMAP
<br /> DRAWING INDEX1
<br /> B-1 COVER SHEET AND GENERAL NOTES
<br /> C-1 CANOPY & PRODUCT PIPING REPLACEMENT SITE PLAN
<br /> CS-1 CANOPY PLAN & ELEVATION
<br /> CS-2 CANOPY STRUCTURAL DETAILS
<br /> E-1 ,QANOPIY,UGHTING PLAV1 DETAILS
<br /> 2DWF'� FUEL SYSTEM STANDARDS 'AND`DETAILS `
<br /> 2DWF-3 FUEL SYSTEM STANDARDS AND DETAILS L\
<br /> 2DWF-4 FUEL SYSTEM STANDARDS AND DETAILS
<br /> pulse AVENUE 2DWF-5 FUEL SYSTEM STANDARDS AND DETAILS
<br /> N
<br /> SITE 2DWF-6 FUEL SYSTEM STANDARDS AND DETAILS
<br /> z 2DWF-7 FUEL SYSTEM STANDARDS AND DETAILS
<br /> 0 2DWF-8 FUEL SYSTEM STANDARDS AND DETAILS
<br /> 1. 2DWF-9 FUEL SYSTEM STANDARDS AND DETAILS
<br /> \ i
<br /> d
<br /> el :
<br /> ,
<br /> SCALE: N.T,S.
<br /> �xstc ,�Mlr it
<br /> trir',}�C� r•�r.��rA�r �,,�r
<br /> xilir 73r41z`h .Yi<rri.
<br /> GENERAL NOTES
<br /> �°�
<br /> yrr1C t?+..:'� vti;F�e Ff i f W..
<br /> 1. IN THE EVENT OF DISCREPANCIES BETWEEN THE DRAWINGS, SPECIFICATIONS OR
<br /> , ITIR x1q< }9 SCOPE OF WORK SUMMARY, NOTIFY TAIT & ASSOCIATES IMMEDIATELY.
<br /> 2. TAIT & ASSOCIATES SHALL NOT BE RESPONSIBLE OR HAVE CONTROL OR ppp�
<br /> Y�xoTe +° f„eT T�+rrre 'a^a�' CHARGE OVER THE ACTS OR OMISSIONS, CONSTRUCTION MEANS, METHODS, # ,r
<br /> TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR THE SAFETY PRECAUTIONS
<br /> 0 ..e.�
<br /> . AND PROGRAMS OF THE CONTRACTOR, SUBCONTRACTOR OR ANY OTHER PER— K
<br /> SONS PERFORMING WORK ON THE PROJECT.
<br /> 3. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO SEE THAT WORK IN THE
<br /> FIELD IS DONE IN ACCORDANCE NTH ALL CURRENT APPLICABLE NATIONAL,
<br /> STATE AND LOCAL CODES, ORDINANCES AND REQUIREMENTS BY GOVERNING
<br /> AGENCIES, WHETHER OR NOT SAID CODES, ORDINANCES, REQUIREMENTS, ETC, 1
<br /> ARE SPECIFICALLY SHOWN ON DRAWINGS AND/OR CALLED FOR IN THE SPECIFI—
<br /> CATIONS.
<br /> Ei
<br /> 4. THE CONTRACTOR SHALL PROTECT ALL EXISTING (TS FACILITIES TO RE—
<br /> MAIN THROUGHOUT CONSTRUCTION. THE CONTRACTORORSHALL REPAIR AND/OR PROJECT DATA
<br /> REPLACE, AT CONTRACTOR'S EXPENSE, ANY EXISTING ITEMS AND FACILITIES,TO
<br /> REMAIN THAT ARE DAMAGED BY THE CONTRACTOR'S OPERATIONS, TO THE `. PROJECT DESCRIPTION:
<br /> SATISFACTION OF TOSCO'S ENGINEER. ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS OTHERWISE NOTED. THIS
<br /> 5. ALL TOSCO SUPPLIED EQUIPMENT SHALL BE DEUVERED TO THE CONTRACTOR'S PROJECT WILL INVOLVE THE FOLLOWING:
<br /> WAREHIOUSE. THE CONTRACTOR SHALL DELIVER THIS EQUIPMENT, DAMAGE FREE, — REMOVE EXISTING CANOPY, ISLANDS, DRIVE SLAB, PRODUCT AND VAPOR RECOVERY
<br /> TO THE: JOB SITE, PIPING. INSTALL NEW 43' X 50' CANOPY WITH FOUNDATIONS AND ELECTRICAL, y
<br /> I
<br /> 6. PRIOR TO EXCAVATION, — REMOVE THREE EXISTNO UNDERGROUND PRODUCT STORAGE TANKS FOR THE THE CONTRACTOR IS TO DETERMINE AND VERIFY THE INSTALLATION OF TWO NEW TANKS AND ELECTRONIC TANK MONITOR SYSTEMS.
<br /> LOCATION OF UTILITY SERVICES IN ALL AREAS TO BE EXCAVATED. INSTALL NEW DOUBLEWALL PRODUCT; AND SINGLE WALL, FIBERGLASS VAPOR,.
<br /> 7. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING JURIS[NC— RECOVERY AND TANK VENT PIPING ELECTRICAL CONDUITS AS REQUIRED BY NEW
<br /> TONS AS REQUIRED FOR INSPECTIONS AND SHALL PAY ALL INSPECTION FEES WORK.
<br /> ASSOCIATED WITH THE WORK. — EXISTING PRODUCT DISPENSERS ARE TO BE REMOVED AND SALVAGED AS DIRECTED
<br /> CANOPY , TANK 8. PRODUCT PIPING REPLACEMENT SITE PLAN IN TOSCO ENGINEER. NEW DISPENSER ISLANDS ARE TO BE INSTALLED FOR
<br /> 8. TAIT AND ASSOCIATES SHALL APPLY FOR BUILDING PERMITS, FIRE DEPARTMENT INSTALLATION OF A NEW BRAVO CEMENTS. -GRADE PRODUCT DISPENSERS
<br /> PERMITS, AIR WAUTY PERMITS AND HEALTH DEPARTMENT PERMITS. � ARE TO BE INSTALLED AS REPLACEMENTS. f
<br /> - INSTALL NEW VEEDER-ROOT TLS-350 TANK MONITOR UNIT AND ASSOCIATED i
<br /> SYSTEMS j
<br /> * 11195
<br /> $l� Q 9. THE GENERAL CONTRACTOR SHALL APPLY, PAY FOR AND PICK UP ELECTRICAL,
<br /> FOR SERVICE STATION 11 1 1 1 V 5 GENERAL
<br /> AND ANY PERMIT L B APPLIED FOR BY TAIT & ASSOCIATES HE
<br /> GENERAL CONTRACTOR SHALL T REIMBURSED BY TOSCO CORPORATION FOR ` •�, �` •^� �•
<br /> THESE FEES.
<br /> 10, THE GENERAL CONTRACTOR SHALL PROVIDE THE TOSCO CONSTRUCTION ENGI-
<br /> NEER WITH ACONSTRUCTION SCHEDULE PRIOR TO STARTING THE WORK, SHALL '
<br /> PROVIDE A QUALIFIED JOB SUPERINTENDENT THROUGHOUT THE WORK AND
<br /> 1 ® ® ® I SE A v E . I T E R T ATE 5 11. THMEL PROMDE TOSCO CORPORATION WITH PHOTOS SHOWING PIPING AND ELEC—
<br /> TRICAL
<br /> LEC— U
<br /> TRICAL TRENCHES PRIOR TO BACKFILL AND RECORD DRAWINGS REFLECTING THE \C'
<br /> U
<br /> E GENERAL L CONTRACTOR SHALL PROVIDE BARRICADES AND SAFETY SIGNS �+
<br /> PER OSHA REQUIREMENTS.
<br /> r
<br /> 12. PROVIDE
<br /> THE GENERAL CONTRACTOR SHALL PROE TESTING OF THE PETROLEUM SYS— j
<br /> LATHROP , CALIF ® RNIA TEM AND CONTROLS AND OF ALL NEW AR, WA ER AND ELEC RICAL SYS EMS
<br /> USING STATE APPROVED TESTING METHODS IF THE SCOPE OF WORK EFFECTS
<br /> ANY OF THESE ITEMS. OWNER'S NAME: TOSCO MARKETING COMPANY -
<br /> 13. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OVERALL CONSTRUCTOR SITE OWNER'S ADDRESS: 76 BROADWAY, SACRAMENTO, CA 95812-1948
<br /> CLEANLINESS THROUGHOUT CONSTRUCTION UNTIL TURNOVER TO THE CLIENT.
<br /> THE CONTRACTOR IS RESPONSIBLE FOR THE PROVISION OF DEBRIS BOX WITH OWNER'S REPRESENTATIVE: JOHN PATTON
<br /> PERIODIC SERVICING AS REQUIRED TO PREVENT BUILD—UP OF DEBRIS ON SITE. PHONE NUMBER: (918) 558-7612 -
<br /> THE ENTIRE YARD SHALL BE PICKED UP ON A DAILY BASIS AND THOROUGHLY
<br /> CLEANED AT THE COMPLETION OF TIE WORK, BUILDING CODES: '94 UBC, '94 UMC, '94 UPC,, '94 UFC, '93 NEC
<br /> 14. UNLESS STATED OTHERWISE IN THE SCOPE OF WORK SUMMARY, ALL PROCE—
<br /> DURES, TESTING, MATERIALS AND EQUIPMENT SHOWN ON THE PLANS SHALL BE
<br /> FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR.
<br /> ° 15. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF DAMAGE TO EXIST—
<br /> ING CONSTRUCTION OR THE WORK OF OTHER TRADES CAUSED BY HIS/HER OP—
<br /> ERATIONS. OCCUPANCY:AS- BUILT THE NATURE OF SUCH REPAIR WORK SHALL RECEIVE THE PRIOR
<br /> APPROVAL OF THE COMPANY REPRESENTATIVE.
<br /> d' 16. UPON COMPLETION OF THIS PROJECT, THE GENERAL CONTRACTOR SHALL FUR—
<br /> NISH TOSCO CORPORATION NTH A SET OF PRINTS OF THE FINAL CONSTRUCTION
<br /> ' DOCUMENTS. ALL "AS—BUILT" MODIFICATIONS, INCLUDING MODIFICATIONS TO THE
<br /> WORK OF ALL SUBCONTRACTORS, SHALL BE CLEARLY NOTED ON THIS PLAN.
<br /> '
<br /> AIN� 2880 Sunrise Boulevard
<br /> Suite 206
<br /> Rqncho Cordova, CA 95742
<br /> TAIT & ASSOCIATES, INC. x.(916), 635-2444
<br /> CONSULTING ENGINEERS (916) 635-2606 FAX -
<br /> ' ORANGE, CA - SAN DIEGO, CA: CONCORD, CA RNOENIX, AZ - TUCSON, AZ
<br /> TOSCO MARKETING COMPANY
<br /> A DIVISION OF TOSCO ' CORPORATION
<br /> A LICENSEE OF BP OIL
<br /> P.O. BOX 1948, 76 BROADWAY
<br /> SACRAMENTO, CALIFORNIA 95812-1948
<br /> COVER SHEET
<br /> SERVICE STATION # 11195
<br /> 16500 EAST LOUISE AVENUE
<br /> ® INTERSTATE 5
<br /> LATHROP, CALIFORNIA
<br /> REVISIONS: DATE DWN CHIS
<br /> L ftEY15E FOR TANK REPLACEMENT
<br /> 9/30/98 OA, T.P
<br /> DATE: 5/26/98 SCALE: 1-1' PLOT p
<br /> CHECKED: S.I.DRAWN: K.G." SB
<br /> HEET: . ,.... - 1
<br /> TC381\38161.DWG
<br />
|