Laserfiche WebLink
$, a Describe the method that will be utilized to urge andlor Inert the tanks} 1 , �+ <br /> um dr Xce pe,r .eco q CA Jlon$ Oi' <br /> t3ST Sj2rc C <br /> b. TankMping Hauler. <br /> Name Vlesk 9 A- <br /> Address ?.(). Q o X 3 g City Tu r oc.lC zip S 3 <br /> phone Ne.( a() I ) (CQ 9- 9 2) 8 <br /> Hauler Reglatmdon#(ifhauled ashazardous) N/A <br /> C. TauMping Disposal Site: <br /> Name W e 5+ C nzt.5 - <br /> Address 1SY6 W,-s+ L,-nnewaA city aor)oc -- Zig q53 9-0 <br /> Phone No4 n o <br /> BPA M#(if transported to a permitted TSD facility) N A <br /> 9. is the sampling firm an Independent third party from the contractor? YES,* NO <br /> 9a. Describe,in detail,how the sail and/or water samples} heath the tank and piping will be obtained: <br /> Sae"-Ole..s (,eJM bQ bficx.n� .' 6* exc&va-k-_n$ Z- L� 1pt below <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> i <br /> 01`f C lean F:I\ {+tip -era� Ver 6Uf Jen w,' h alt <br /> so <br /> b e- E3 5 eA <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> 1�j f lasI c - S1.eel,h I <br /> b)What will be the final destination of the excavated stockpile? <br /> USel _Q S �: I 1 Kc4cr-a l <br /> „r e}Contaminated Solt ous Waste Hauler T R �/ 'Y <br /> Pwry' v iv k►C <br /> Name L2 Hauler 1;elpstrettlon# M 4772t <br /> �X\r Address �O X - City 7.i) <br /> Phone Nro. <br /> "046(Revised 08113199) Page 5 <br /> I <br />