My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9508
>
2300 - Underground Storage Tank Program
>
PR0231588
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 11:36:18 AM
Creation date
11/5/2018 1:03:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231588
PE
2381
FACILITY_ID
FA0003917
FACILITY_NAME
BORAL ROOFING
STREET_NUMBER
9508
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19321003
CURRENT_STATUS
02
SITE_LOCATION
9508 HARLAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\9508\PR0231588\REMOVAL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NRu n. SAN JOAQUIN COUNTY <br /> —� � COMMUNITY DEVELOPMENT DEPARTMENT <br /> - - •� 1870 E HAZELTON AVE STocaoN.0A 95205 - <br /> -"•��a•A OEVEI.OPM@rt SERVICES PHONE 8491 4683120 _ <br /> M AMANG PHONE(2091468-3120 <br /> 8=1NG PHONE(2091468-3123 <br /> NEiGH80RHOOD PRESERVATION PHONE(2091 1683021 <br /> BACYFILL EXCAVATION <br /> rCERTIFICATE <br /> Project Location 'qSrO$ S . Nd✓CCK cX rv�e-(A 6U1401 4fz2( <br /> Owner /(/�M 1>r- l-1 Phone No. (Zz7J) `1$Z'1�77j <br /> Contractor YEinee Phone No.ZOysZSly6S3 License No . �eZ3r� <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> 2. Submission of verification, e.g. load ticket, within 30 days of project <br /> completion that one of the fallowing materials was placed in the excavation In <br /> 12" lifts: <br /> �A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br /> inch in diameter. <br /> _ B. Crushed rock - self-compacting material not more than three-quarters <br /> (3/4) inch in cross sectional measurement. (Use of crushed rock <br /> will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or <br /> similar materials. ) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Cade Appendix Chapter 70. <br /> Name (Print) <br /> T le (Pri ) <br /> * kt <br /> gnature <br /> * Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> 6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.