My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9508
>
2300 - Underground Storage Tank Program
>
PR0231588
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2021 11:36:18 AM
Creation date
11/5/2018 1:03:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231588
PE
2381
FACILITY_ID
FA0003917
FACILITY_NAME
BORAL ROOFING
STREET_NUMBER
9508
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19321003
CURRENT_STATUS
02
SITE_LOCATION
9508 HARLAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\9508\PR0231588\REMOVAL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r./ .� <br /> 1.0. SCOPE OF WORK: <br /> Excavation and removal of(1) 10,000 gallon diesel underground storage tank. Tank will <br /> be purged of all remaining residues, and these residues will be stored on site in 55 gallon <br /> D.O.T. approved drums until they are hauled away for disposal by a certified hazardous <br /> materials hauler. <br /> The tank will be inerted with a minimum of 301bs. of dry ice per 1,000 gallons of tank <br /> capacity. More ice will be added if necessary to displace the oxygen in the tank to a <br /> concentration level below the OSHA approved lower explosive limit. When this level is <br /> obtained the tank will be removed and samples will be collected per the approved work <br /> plan. <br /> 1.1. Responsibilities of Other Agencies Present: <br /> I.I.I. The Environmental Health Department is responsible for approval <br /> and inspection of procedures, including excavation, sample <br /> procurement and integrity of work plan. <br /> 1.1.2. The Fire Department is responsible for inspection relative to safe <br /> procedures and condition of tank prior to removal. <br /> page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.