My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
255
>
2300 - Underground Storage Tank Program
>
PR0537549
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 4:52:46 PM
Creation date
11/5/2018 1:04:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0537549
PE
2351
FACILITY_ID
FA0021617
FACILITY_NAME
HARNEY LANE AMPM
STREET_NUMBER
255
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
062-580-40
CURRENT_STATUS
01
SITE_LOCATION
255 E Harney Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARNEY\255\PR0537549\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
7/18/2017 11:36:57 PM
QuestysRecordID
3515379
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California <br /> acility/Site <br /> HARNEY LANE AMPM CERS ID <br /> 55 E Harney Ln 10484500 <br /> adi,CA 95240 <br /> UST Tank p <br /> TA0520539 <br /> Pipe Monitoring is Performed Using the Following Method(s) <br /> ¢s Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Under Vacuum VEEDER ROOT VEEDER ROOT <br /> Panel Model N Leak Sensor Model It <br /> TLS-350 794380-208 and 001 smart sensor <br /> es Leak Alarm Triggers Automatic Pump Shutdown <br /> ¢s Failure/Disconnect Triggers Pump Shutdown <br /> Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> Yes Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> eederroot Yes <br /> LLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> 484 Yes <br /> Pipeline Integrity Testing Visual Pipeline Monitoring <br /> Pipeline Integrity Testing Frequency Visual Pipeline Monitoring Frequency <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> Other Pipeline Monitoring <br /> Under Dispenser Containment(UDC)Monitoring <br /> DC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> ontinuous Yes <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> DC Panel Manufacturer Yes <br /> EEDER ROOT Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> OC Panel Model p Yes <br /> LS-350 UDC Monitoring Stops Flow of Product at Dispenser <br /> DC Leak Sensor Manufacturer <br /> EEDER ROOT UDC Construction <br /> DC Leak Sensor Model Double-walled <br /> 94380-208 UDC Secondary Containment Monitoring <br /> Liquid <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> Yes <br /> eriodic System Testing <br /> ELD Testing <br /> Secondary Containment Testing <br /> es Spill Bucket Testing <br /> Printed on 7/24/2014 10:42 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.