My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
255
>
2300 - Underground Storage Tank Program
>
PR0537549
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 4:52:46 PM
Creation date
11/5/2018 1:04:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0537549
PE
2351
FACILITY_ID
FA0021617
FACILITY_NAME
HARNEY LANE AMPM
STREET_NUMBER
255
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
062-580-40
CURRENT_STATUS
01
SITE_LOCATION
255 E Harney Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARNEY\255\PR0537549\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
7/18/2017 11:36:57 PM
QuestysRecordID
3515379
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mow <br /> F. In-Tank Gauging/SIR Equipment: ❑<fieck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Cornakde the following checklist: <br /> ❑ Yes "' l las all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were al n robes visually inspected for damage and residue buildup? <br /> ❑ Yes Cl No* Was accuracy of system pro uc ev ested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑-Yes. ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> " In tits Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G., Line Leak Detectors(LLD): ❑ bee this b x if LL are not" stalled. <br /> Com Tete the following checklist: <br /> ❑ Yes El " Forequipment slam-up or annual equipment certification, w• a leak simulated to verify LLD performance? <br /> ❑ N/A heck all that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g-p.h. <br /> ❑ Yes ❑ No* Were all L confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing app properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does LD rastrict product flow if it detects a Icak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbineau tically shut off if the LLD detects a leak? <br /> 13 N/A <br /> ❑ Yes ❑ No' For electronic LLDs, does the turbine automatically off if city portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any 'on of the monitoring system malfunctions <br /> ❑ N/A or Mils a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspec ? <br /> ❑ NIA <br /> ❑ Yes ❑ No* Were all items on die equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.