My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARRISBURG
>
6749
>
2300 - Underground Storage Tank Program
>
PR0231972
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2021 3:52:22 PM
Creation date
11/5/2018 1:06:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231972
PE
2381
FACILITY_ID
FA0003797
FACILITY_NAME
LUSD-MAINT/OPER TRANS
STREET_NUMBER
6749
STREET_NAME
HARRISBURG
STREET_TYPE
PL
City
STOCKTON
Zip
95207
APN
09711018
CURRENT_STATUS
02
SITE_LOCATION
6749 HARRISBURG PL
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARRISBURG\6749\PR0231972\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location Lincoln Unified School Dist. Maintainence Yard, 6749 Harrisburg Place, Stockton, CA <br /> Owner Lincoln Unified School District Phone No. (209)953-8700 <br /> Contractor JIM THORPE OIL, INC. Phone No. (209)368-6175 License No.495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ L Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br /> was placed in the excavation in 12" lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(1/2) Inch in diameter <br /> B. Crushed rock--self-compactinI material not more than three-quarters (3/4) Inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill If contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I berellor (yyii acetify 111,11 a Soil Fngineer's Compaction Report will be submitted within 30 dalys of)project completion,or submission <br /> displacement rthat and that theentire ct terial excavaiontwill beed rth backfilled ve will be and compactedlaced at a minimum Insure complianceewith thards e Uniorrgitallon lank <br /> Building <br /> Code Appendix Chapter 70. <br /> • JIM THORPE OIL,INC. <br /> game not <br /> • C0N'1'RA ... <br /> tt a ntn <br /> tgnalure <br /> " Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.