My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARRISBURG
>
6749
>
2300 - Underground Storage Tank Program
>
PR0231972
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2021 3:52:22 PM
Creation date
11/5/2018 1:06:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231972
PE
2381
FACILITY_ID
FA0003797
FACILITY_NAME
LUSD-MAINT/OPER TRANS
STREET_NUMBER
6749
STREET_NAME
HARRISBURG
STREET_TYPE
PL
City
STOCKTON
Zip
95207
APN
09711018
CURRENT_STATUS
02
SITE_LOCATION
6749 HARRISBURG PL
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARRISBURG\6749\PR0231972\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. A. Describe the method that will be utilized to purge and/or Inert the tank <br /> Dry ice will be added to the tanks at the rate of 20fl per 1,000 gallon <br /> —c pscity for dleapl and 30d per 1,000 gallon capacity fpr gasalinacarm riIJAILar <br /> Products. <br /> b. Tank/Plping Hauler: <br /> Name Jim Thorpe 011, Inc._ <br /> Address P.O. Sox 357 City Lodi, CA Zip 95241-0357 <br /> Phone No.( 209 ) 368-6175 <br /> Hauler Registration o(If hauled as hazardous) 2667 <br /> C. Tank/Piping Disposal Site: <br /> Name Schnitzer Steel. Products <br /> Address 12000 Folsom Blvd. City Rancho CordovaZip95742 <br /> Phone No.( 916 1 985-4810 <br /> FPA Hoo (if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water samples) beneath the tank and piping will be obtained: <br /> Soil samples will be taken from native soil two to three feet under the former <br /> _tank locationwith a backhoe. Samples will be taken from the bucket. Water samples <br /> If needed, will be taken with a bailer. <br /> in. Describe how the excavation will be backfilled with suitable material upon removal: <br /> Bnckfill of the excnvition(s) will be. done at the appropriate time during this <br /> project. Backfill material will consist of the excavated spoil if useable and <br /> other clean compactible material. <br /> it. llnndling of excavaled soil: <br /> n) What material will be used to line the tank pit and cover the stockpile? <br /> 6 mil. plastic sheeting. <br /> W"Ill be the final destination of the excavated stockpile? 5t` <br /> ife'pendin8 upon the contaminate, levels of contamination and quantities of soil, <br /> the Spoil will he linnled to either n clnss I or class 2 landfill or treated on site. <br /> c) Contaminated Soil Hazardous Waste Hauler: <br /> I <br /> Name aim 'Thorpe oil., Inc. Hauler Registratloa N 2667 <br /> Address P.O. Box 357 City Lodi, CAZip 95241-0357 <br /> phone No. 209 ) 368-6175 <br /> F.11 23 0,16 (Revised 9/11/96) Page S <br /> I , <br />
The URL can be used to link to this page
Your browser does not support the video tag.