Laserfiche WebLink
% <br /> This tank was rem ved between September 16 , 1986 and <br /> October 6, 1986 when work was completed on the above ground <br /> tank to accept waste oil. The tank was removed because it <br /> did not pass the precision test tanken in September of <br /> 1986. The tank was removed by school district personnel, <br /> the excavation was filled with clean loam, comparted and a <br /> cement pad was poured over top of the hold to rovide a pad <br /> for the current 300 gallon waste oil above ground tank. <br /> Submitted by: <br /> Allan Patterson <br /> Director of Maintenance, Operations, <br /> Transportation, Safety and Security <br /> el <br />