ELECTRICAL PROJECT COMPLETION a
<br /> 1. WORK SHALL CONFORM TO THE FOLLOWING CODES: 14. CONDUIT SUPPORT: CONDUIT SHALL BE SUPPORTED AT CLEAN.-UP
<br /> INTERVALS NOT EXCEEDING 10 FEET WITH A SUPPORT NOT
<br /> A. NFPA 70-NATIONAL ELECTRICAL CODE MORE THAN 3 FEET FROM THE OUTLET AND AT ANY POINT m
<br /> B. UNIFORM BUILDING CODE, LATEST EDITION WHERE IT CHANGES IN DIRECTION. CONDUIT PLACED AGAINST 1• THE CONTRACTOR SHALL CLEAN UP THE JOB SITE PRIOR TO
<br /> C. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) CONCRETE OR MASONRY ABOVE GROUND SHALL BE FASTENED THE CLIENT'S REPRESENTATIVE ACCEPTANCE FO THE WORK.
<br /> STANDARDS TO THE CONCRETE NTH PIPE STRAPS OR ONE-SCREW - DIRT EXCESSES AND DEBRIS SHALL BE REMOVED TO REVEAL ¢
<br /> D. UNIFORM FIRE CODE CONDUIT CLAMPS ATTACHED TO THE CONCRETE BY MEANS OF A CLEAN SITE APPEARANCE. ANY DAMAGE DONE BY THE o
<br /> E. CCR TITLE 23 EXPANSION ANCHORS AND SCREWS. EXPANDERS AND SHIELDS CONTRACTOR TO ANY PART OF THE SITE SHALL BE
<br /> F. CITY OR COUNTY CODES AS APPLICABLE AND BOLTS SHALL BE SUCH THAT THE PROOF TEST LOAD CORRECTED AT HIS EXPENSE.
<br /> WILL NOT BE LESS THAN (4) TIMES THE ACTUAL WORKING 2. ALL TANK SUMPS AND DISPENSER BOXES SHALL BE LEFT
<br /> 2. ELECTRICAL MATERIALS USED ON THIS PROJECT SHALL BE LOAD.
<br /> NEW AND FREE FROM DEFECTS AND SHALL CONFORM WHERE CLEAN, DRY AND FREE OF ANY CONSTRUCTION DEBRIS. N
<br /> APPLICABLE TO THE FOLLOWING STANDARDS, UNLESS 15. CONDUIT BENDS OR OTHER ;THAN FACTORY ELLS SHALL HAVE 3. PERCEPTIBLE WATER IN TANKS AND CONTAINMENT AREAS 6
<br /> OTHERWISE NOTED. A RADIUS OF NOT LESS THAN TEN (10) TIMES THE INTERNAL SHALL TI REMOVED BY THE CONTRACTOR. o
<br /> DIAMETER OF THE CONDUIT.
<br /> A. NEMA - NATIONAL ELECTRICAL MADS AC.INS ASSOCIATION 16. CONDUIT PROTECTION: CAP CONDUIT DURING CONSTRUCTION DOCUMENTATION
<br /> B. ANSI - AMERICAN NATL. STANDARDS INSTITUTE S
<br /> C. UL - UNDERWRITERS LABORATORIES, INC. BY MEANS OF MANUFACTURED SEALS. SWAB OUT CONDUIT La
<br /> 3. THE EXTENT OF THE ELECTRICAL WORK INCLUDES BUT IS NOT
<br /> BEFORE PUTTING IN WIRE. THE FOLLOWING DOCUMENTATION IS TO BE SUBMITTED TO THE
<br /> 'S
<br /> LIMITED TO THE FOLLOWING ITEMS: 17. PULLING: NO OIL, GREASE OR SIMILAR SUBSTANCES SHALL BE CLIENTREPRESENTATIVE UPON COMPLETION OF THE PROJECT:
<br /> USED TO FACILITATE THE PULLING IN OF CONDUCTORS. USE 1. TANK MONITOR WARRANTY REGISTRATION
<br /> A. PROVIDE RECEPTACLE OUTLETS, PULLBOXES, SWITCHES, A UL-APPROVED WIRE PULLING COMPOUND. NO WIRE OR
<br /> WIRE, CIRCUITS, RELAYS, CONDUITS WITH SUPPORTS, CABLE SHALL BE PULLED IN UNTIL CONSTRUCTION WHICH 2. ALL PERMIT DRAWINGS
<br /> AND SLEEVES, ADDITIONAL MATERIALS AND MIGHT DAMAGE INSULATION OR FILL CONDUIT 'NTH FOREIGN
<br /> ACCESSORIES AS REQUIRED FOR A COMPLETE MATERIALS IS COMPLETED. WIRE SHALL BE PULLED INTO 3, COMPLETED PERMIT CARDS
<br /> FUNCTIONING INSTALLATION. ALARM UNIT AND BELL. CONDUITS WITH CORE TO PREVENT DAMAGE TO INSULATION. p
<br /> USE BASKET PULLING GRIPS TO AVOID SLIPPING OF 4. AS-BUILT DRAWINGSZ
<br /> B. INSTALL OWNER FURNISHED TLS-350 PANEL SENSORS INSULATION ON CONDUCTORS. NYLON ROPE OR OTHER "SOFT"
<br /> AND PROBE. SURFACE CABLE MUST BE USED FOR PULLING IN CONDUITS N
<br /> OTHER THAN STEEL. < „�
<br /> 4. BREAKERS: VOLTAGE AS REQUIRED. MANUFACTURER SHALL v a
<br /> BE THE SAME AS THE PANEL BOARD OR SWITCHBOARD ON 18. CONNECTIONS: STRANDED CONDUCTORS NO. 8 AND SMALLER `oo 0) o
<br /> WHICH THEY ARE MOUNTED. IF TWO OR THREE POLE SHALL BE TERMINATED WITH TERMINALS OF APPROPRIATE
<br /> BREAKERS OCCUR IN THE PANELS, THEY SHOULD BE COMMON SIZE WHERE CONNECTED TO SCREW TYPE LUGS. JOINTS, 9
<br /> TRIP UNITS. SINGLE POLE BREAKERS WITH TIE-BAR BETWEEN SPLICES AND TAPS IN DRY LOCATIONS FOR CONDUCTORS M0 �tD
<br /> HANDLES WILL NOT BE ACCEPTED. BREAKERS SHALL HAVE NO. 8 AND SMALLER SHALL BE MADE WITH TWIST ON d 0 fD
<br /> TOGGLE, QUICK-MAKE, AND QUICK-BREAK OPERATING CONNECTORS SUITABLY SIZED FOR THE NUMBER AND GAUGE o N N a
<br /> MECHANISMS WITH TRIP-FREE FEATURE TO PREVENT CONTACTS OF THE CONDUCTORS. FURNISH AND INSTALL PROPER LUGSo'o
<br /> j p U M M
<br /> BEING HELD CLOSED AGAINST OVER CURRENT CONDITIONS IN PANEL BOARDS, SWITCHBOARDS AND GUTTERS AS REQUIRED ')N owro
<br /> IN THE CIRCUIT. TRIP POSITION OF THE BREAKERS SHALL TO PROPERLY TERMINATE EVERY CABLE. WHERE PARALLELED m?O,p� a
<br /> BE CLEARLY INDICATED BY MOVEMENT OF THE OPERATING CONDUCTORS ORCONDUCTORS OF LARGE SIZES ARE TO
<br /> HANDLES TO THE CENTER POSITION. TERMINATE ON A BREAKER, A SHORT LENGTH OF COPPER °i�
<br /> CABLE (OF CAPACITY OF THE BREAKER) SHALL BE U v
<br /> 5. RIGID STEEL CONDUIT: COMPLY TO UNDERWRITER'S CONNECTED TO THE BREAKER, AND THE PROPER COMPRESSION z o
<br /> LABORATORIES UL-6 SPECIFICATION, ANSIC80.1 AND FEDERAL TYPE LUG INSTALLED TO CONNECT THIS CABLE TO THE - 5
<br /> SPECIFICATION WW-C-581 OR LATEST REVISIONS. HOT FEEDER CABLE. THE CUTTING OF CABLE STRANDS TO FIT "
<br /> 0
<br /> DIP GALVANIZED ON THE EXTERIOR. ZINC OR ENAMEL ON THE BREAKER WILL NOT BE PERMITTED. COPPER TO (n
<br /> THE INTERIOR. COUPLINGS, LOCKNUTS, AND OTHER FITTINGS ALUMINUM CONNECTIONS OF BUS BARS AND LUGS SHALL BE - W
<br /> SHALL BE GALVANIZED OR SHEARDIZED, WATERPROOF AND MADE USING 13ELLEMLLE WASHERS AND FLAT WASHERS TO Q
<br /> THREADED TYPE ONLY. COMPENSATE FOR DIFFERING RATES OF THERMAL EXPANSION.
<br /> ONLY CRIMPING TOOLS APPROVED BY THE MANUFACTURER -0
<br /> 6. OUTLET BOXES: GALVANIZED STEEL BOXES INSTALLED IN ANY OF THE TERMINALS OR LUGS SHALL BE USED. NON-INSULATED 0 o$
<br /> EXTERIOR LOCATION, WHERE EXPOSED TO RAIN OR WERE LUGS AN ENDS SHALL BE INSULATED WITH LAYERS OF U)
<br /> EXPOSED TO MOISTURE LADEN ATMOSPHERE SHALL BE CAST PLASTIC TAPE EQUAL TO INSULATION OF WIRE, WITH
<br /> SCREW HUB TYPE WITH GASKETED WEATHERPROOF COVERS. IRREGULAR SURFACES PROPERLY PADDED WITH INSULATION Q
<br /> BOXES FOR VAPOR PROOF OR EXPLOSION PROOF APPLICATIONS PUTTY PRIOR TO APPOLICATION OF TAPE. SPLICES IN
<br /> SHALL BE DESIGNED SPECIFICALLY' FOR SUCH USE. UNDERGROUND PULLBOXES OR IN OTHER AREAS SUBJECT TO v
<br /> MOISTURE SHALL BE PROVIDED WITH CAST RESIN KITS.
<br /> 7, WHERE APPLICABLE, PULLBOXES AND CABINETS SHALL BE PREPARE SPLICES AS SPECIFIED BEFORE RESIN KITS ARE F-
<br /> PREFABRICATED CONCRETE TYPE; CHRISTY CONCRETE APPLIED. Q 2
<br /> PRODUCTS, BROOKS OR EQUAL. BOXES SHALL HAVE F_
<br /> STANDARD BRASS HOLD-DOWN BOLTS AND HARDWARE. 19. SYSTEMS SHALL TEST FREE FROM SHORT CIRCUITS AND
<br /> BOXES LOCATED IN PAVED AREAS OR THE AREAS OVER GROUNDS AND BE FREE FROM MECHANICAL AND ELECTRICAL
<br /> WHICH VEHICLES NORMALLY MAY TRAVEL SHALL HAVE DEFECTS. CIRCUITS SHALL BE TESTED FOR THE PROPER
<br /> TRAFFIC COVERS. -- NEUTRAL CONNECTION AND ROTATION OF MOTORS. WHERE
<br /> TESTS INDICATE FAULTY INSTALLATION OR OTHER DEFECTS,
<br /> 8. RELAY FOR PUMPS AND GENERATOR SHALL BE HEAVY-DUTY THEY SHALL BE LOCATED, REPAIRED AND RETESTED AT THE
<br /> TYPE SAFETY SWITCHES AS MANUFACTURED BY G.E., CONTRACTOR'S EXPENSE, Z
<br /> WESTINGHOUSE, CUTLER-HAMMER, GOULD OR SQUARE D. W
<br /> FURNISH WITH ENCLOSURE SUITABLE FOR APPLICATION. 20. ELECTRICAL CONTRACTOR SHALL REFER TO LATEST ISSUE
<br /> PROVIDE FUSED TYPE WHERE INDICATED OR REQUIRED BY CODE. OF VEEDER-ROOT INSTALLATION INSTRUCTIONS PRIOR TO = I,. Q :2W
<br /> MOTOR STARTERS SHALL BE DISCONNECT SWITCH TYPE STARTING WORK. N
<br /> COMPLETE WITH THREE OVERLOAD RELAYS AND ENCLOSUREZ n 0
<br /> SUITABLE FOR APPLICATION, G.E., WESTINGHOUSE, CUTLER- FINAL SYSTEM TESTINGp I
<br /> HAMMER, GOULD OR SQUARE D. O¢ :5wza
<br /> i 9. CONDUCTORS: UNLESS SPECIFICALLY NOTED OTHERWISE 1. PETROLEUM PRODUCTS FOR VESTING EQUIPMENT Q Ow x W �m
<br /> HEREIN, CONDUCTORS FOR GENERAL WIRING SHALL BE A A. THE CONTRACTOR SHALL REQUEST THE CLIENTS C) Z wo Q' ¢o
<br /> MINIMUM OF 98% CONDUCTIVITY, STRANDED, SOFT DRAWN REPRESENTATIVE TO ARRANGE FOR DELIVERY OF 1y, D =):3 p�
<br /> COPPER, N0. 10 AND SMALLER SHALL BE 600 VOLT, PETROLEUM PRODUCT 48 HOURS BEFORE PRODUCT IS .0 �a C'1
<br /> TYPE THWN. REQUIRED FOR TESTING EQUIPMENT. W ¢Z Z NZ
<br /> a
<br /> 10. CONNECTIONS: #8 AND SMALLER; PRE-INSULATED SPRING B. IMMEDIATELY AFTER DELIVERY, CONTRACTOR AND CLIENT'S 0- wY �' X�
<br /> TYPE CONNECTORS. THREADED OR CRIMP TYPES WILL NOT REPRESENTATIVE SHALL TOGETHER ACCURATELY GAUGE N Z m v FLLj 6
<br /> BE ACCEPTED. USE SKOTCHLOCK, HYDENT, T&B OR EQUAL. THE PETROLEUM PRODUCT WITH A GAUGE STICK AND R O pO
<br /> TERMINALS FOR STRANDED CONDUCTORS NO. 8 AND SMALLER RECORD THE DELIVERED QUANTITY OF PRODUCT. X w N, Q $N
<br /> SHALL BE A PRE-INSULATED CRIMP TYPE. LUGS AND Z Q N Q
<br /> CONNECTORS FOR CONDUCTORS N0. 6 OR LARGER SHALL C. UPON COMPLETION AND ACCEPTANCE OF CONSTRUCTION Q O
<br /> BE COMPRESSION TYPES OF ONE PIECE TUBULAR WORK BY THE CLIENTS REPRESENTATIVE, THE CONTRACTOR
<br /> CONSTRUCTION WITH FLAT RECTANGULAR TONGUES. TWO SHALL REPEAT THE GAUGING PROCEDURE AND RECORD _
<br /> HOLE LUGS SHALL BE USED FOR SIZES 4/0 AND LARGER. FOR COMPARISON WITH THE FIRST GAUGES. Z Z
<br /> FITTINGS FOR COPPER CONDUCTORS SHALL BE TIN-PLATED Q Q
<br /> COPPER. CAST RESIN KITS SHALL BE SKOTCHLOCK SEALING 2. FINAL SYSTEM PRECISION TEST
<br /> PACKS FOR WIRE SIZE TO #10 AND SKOTCHLOCK KITS FOR N H"
<br /> LARGER SPLICES AS RECOMMENDED BY 3M COMPANY. A. THE TANK AND PIPING SYSTEMS MUST PASS A FULL
<br /> SYSTEM PRECISION TEST PURSUANT TO SECTION 2643,
<br /> 11. GROUNDING AND BONDING: THE ENTIRE ELECTRICAL SYSTEM SUBSECTION (b) OF THE CALIFORNIA CODE OF
<br /> SHALL FORM A CONTINUOUS METALLIC ELECTRICAL CONDUCTOR REGULATIONS, TITLE 23, PRIOR TO FINAL APPROVAL.
<br /> FROM SERVICE POINT TO EVERY OUTLET AND SHALL BE -
<br /> GROUNDED BY CONNECTION TO THE MAIN SERVICE GROUND. INSTALLING CONTRACTOR TO COORDINATE SCHEDULING Z
<br /> ELECTRICAL SYSTEMS, SUPPORTS, CABINETS, CONTROL WITH CLIENT'S TANK TESTING CONTRACTOR, GENERAL w o
<br /> EQUIPMENT, MOTOR FRAMES AND UTILIZATION APPARATUS CONTRACTOR TO ARRANGE AND PAY FOR TANK TEST. F v a
<br /> SHALL BE PERMANENTLY AND EFFECTIVELY GROUNDED,
<br /> TANK TESTING CONTRACTOR SHALL PROVIDE ALL TEST
<br /> 12. CONDUIT APPLICATION: MINIMUM SIZE OF CONDUIT SHALL BE RESULTS TO CLIENT AND LOCAL AGENCY INSPECTORS AS m -- 1 uNi
<br /> 1/2 INCH. IN NO CASE SHALL THE CONDUIT BE SMALLER REQUIRED.
<br /> THAN THAT SHOWN ON THE DRAWINGS, BOXES INSTALLED a
<br /> INDOORS OR IMBEDDED IN CONCRETE SHALL BE GALVANIZED CONTRACTOR TO BE PRESENT DURING TESTS TO ASSISTn � n rn
<br /> STEEL TYPE, BOXES INSTALLED EXPOSED OR OUTDOORS TESTER.
<br /> SHALL BE GALVANIZED CAST STEEL WITH THREAD HUBS.
<br /> BRANCH CIRCUIT CONDUITS UNDER SLAB SHALL BE TEST FLUID FOR PRODUCT TANK TO BE THE DESIGNATED
<br /> SEPARATED BY AT LEAST ONE (1) INCH. IN CASES WHERE PRODUCT FOR THE SPECIIFIC TANK.
<br /> TWO OR MORE CONDUITS ARE INSTALLED IN A COMMON w
<br /> w d w
<br /> CONCRETE ENCASEMENT, THEY SHALL BE SEPARATED BY AT 3. LEAK DETECTOR FUNCTION TEST
<br /> LEAST THREE (3) INCHES. CONDUIT SHALL BE SECURELY FASTENED w j Z
<br /> w
<br /> IN PLACE SO THAT ABSOLUTELY NO SHIFTING WILL OCCUR INSTALLING CONTRACTOR TO PERFORM LEAK DETECTOR ¢ _ ¢ w ¢ w
<br /> DURING PLACING OF CONCRETE ENCASEMENT. JOINTS IN FUNCTION TEST PER MANUFACTURER'S INSTRUCTIONS. TEST 010 10101M 1 0 �-
<br /> CONDUITINSTALLEDIN CONCRETE OR EXPOSED TO WEATHER TO BE WITNESSED BY CLIENTS REPRESENTATIVE.
<br /> SHALL BE LIQUID AND GAS TIGHT. SEAL:
<br /> 13. CONDUIT LOCATION: EXPOSED CONDUIT SHALL BE NEATLY
<br /> INSTALLED PARALLEL TO OR AT RIGHT ANGLES TO THE
<br /> STRUCTURAL MEMBERS. EXPOSED CONDUIT STUBBING UP
<br /> THROUGH THE FLOOR INTO THE BOTTOM OF EXPOSED
<br /> _ PANELS, CABINETS OR EQUIPMENT SHALL BE LINED UP, .
<br /> PROPERLY SPACED AND SHALL BE STRAIGHT AND PLUMB.
<br /> 'CONDUlJITS SHALL BE INSTALLED AT SUFFICIENT DEPTH BELOW
<br /> THE FLOOR TO ELIMINATE ANY PART OF THE BEND ABOVE.
<br /> MAINTAIN 12 INCHES SEPARATION BETWEEN POWER AND
<br /> 1NTERCOMMUNICATION'CABLES. CONDUIT SHALL BE KEPT AT SHEET NO:
<br /> LEAST 6 INCHES FROM THE COVERING ON HOT WATER PIPES
<br /> AND 18 INCHES FROM THE COVERING ON FLUES AND -
<br /> BREACHING. - y PT - 6
<br /> SHEET - OF -
<br /> SCALE: -
<br />
|