My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
704
>
2300 - Underground Storage Tank Program
>
PR0506555
>
REMOVAL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 11:36:29 AM
Creation date
11/5/2018 1:08:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1997
RECORD_ID
PR0506555
PE
2381
FACILITY_ID
FA0007500
FACILITY_NAME
BRYNER PROPERTY
STREET_NUMBER
704
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
704 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAZELTON\704\PR0506555\REMOVAL 1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 76' E. Hazelton St. , Stockton, CA 95203 <br /> Owner <br /> Zoya 0. Bryner Phone No. N/A <br /> Contractor Jim Thorpe Oil, Inc. Phone No.(209)368-6175 LicenseNo495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> X 2. Submission of verification, e.g-, load ticket, with"m30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 da s of project completion,or submission of <br /> verification that the select material described above will be placed at a minimum of five (5 cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * Jim Thorpe Oil, Inc. by Richard Thorpe <br /> ame rmt) <br /> * Cot ct r/ resident <br /> t[e( n <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.