My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HIAWATHA
>
1933
>
2300 - Underground Storage Tank Program
>
PR0517364
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 1:25:57 PM
Creation date
11/5/2018 1:10:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0517364
PE
2381
FACILITY_ID
FA0013375
FACILITY_NAME
SILVERIA PROPERTY
STREET_NUMBER
1933
STREET_NAME
HIAWATHA
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1933 HIAWATHA AVE
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HIAWATHA\1933\PR0517364\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICA' <br /> 1./ <br /> Project Location 1933 Hiawatha avenue <br /> Owner mrs ethel silveria Phone No. 209 467-8320 <br /> Contractor AGE Phone No. 209-467-1006 LicenseNo.680227 — haz a <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> Submission of verification, e.,f., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12' lifts: <br /> _XXk. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> road base <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> William little <br /> * <br /> ame int <br /> * geologist <br /> it a int <br /> Nignattwe <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.