Laserfiche WebLink
8. a. Describe the method that will be utilized to purge aid/ inert the tank(s): <br /> b. Tank/Piping Hauler. <br /> Name `'O C%-Q 0.fra� 1 nJn�e C �� <br /> Address To�/��� ./ /p�a1 ���� Lg--ACi����OCK Zip <br /> Phone No.( o�Cr/ <br /> Hauler Registration #(if hauled as hazardous) <br /> C. Tank/Pip—i-n�g-tDisposal Site: <br /> Name <br /> Addressc�—ll� �O�lyl) -1 City �r/c�b�l Zip <br /> Phone No.( � / Mfg- 3q q' <br /> EPA D?# (if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> S , ILQ � 1 <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> U <br /> 11. Handling of excavated soil: <br /> a) What <br /> material will be used to line the tank pit and cover the stockpile? <br /> lIJ <br /> b) What will be the final destination of the excavated stockpile? <br /> c) Contaminated Soil Hazardous Waste Hauler: 2 <br /> Name G QQ (5-� — Hauler Regwitratiou # <br /> Address / 6 -7.5 LL p„ <br /> Phone No ( %.00 <br /> EH 23 046 (Revised 9/11/96) Page 5 <br />