My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
3900
>
2300 - Underground Storage Tank Program
>
PR0232330
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 11:24:52 AM
Creation date
11/5/2018 1:12:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0232330
PE
2381
FACILITY_ID
FA0003837
FACILITY_NAME
TRACY WASTEWATER TX PLNT-MAINTENANC
STREET_NUMBER
3900
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95304-1618
APN
21223005
CURRENT_STATUS
02
SITE_LOCATION
3900 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOLLY\3900\PR0232330\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1.0 INTRODUCTION <br /> The health and safety of all project personnel involved at the City of Tracy Waste Water <br /> Treatment Plant underground storage tank excavation project is of primary importance. <br /> Therefore, this Health and Safety Plan was developed and is intended to be followed by all project <br /> personnel. It is the responsibility of the Project Manager to implement and enforce the plan and <br /> any subsequent revisions, during the course of all operations at the site. <br /> 1 . 1 OVERVIEW <br /> The City of Tracy has retained Wright Environmental Services, Inc. (WES) to bring the tank <br /> removal at the Waste Water Treatment Plant into compliance for the removal of one (1) <br /> underground storage tank (UST) at the site. The work will consist of sampling the surrounding <br /> soil and groundwater, if encountered, tank disposal, performing any additional excavation from <br /> the removed UST, and documented disposal of contaminated soil and groundwater generated from <br /> tank removal. The typical steps involved with tank removal are: <br /> 1. Draining/cleaning of all liquid from the tank and all associated lines. <br /> 2. Capping or removing associated lines. <br /> 3. Excavation and removing the tank from the ground. <br /> 4. Freeing the tank of toxic vapors <br /> S. Disposing of the tank <br /> 6. Backfilling the excavation hole. <br /> The chemical hazards expected to be encountered at the site may be organics from diesel fuel. <br /> The other hazards expected to be encountered during the project are exposure to physical <br /> hazards such as slipping, tripping, cuts, strains bruises, smashing limbs from working around <br /> heavy equipment (pinch points), excessive noise, broken bones and heat stress. The tank <br /> capacity and contents are listed below: <br /> CAPACITY (gallons) CONTENTS <br /> 1 7500 Diesel fuel <br />
The URL can be used to link to this page
Your browser does not support the video tag.