Laserfiche WebLink
Tanknology <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility Information Technician Information <br /> Site#:Fed Ex Ground Tracy Date:8/17/2016 <br /> Address: 120 S Hansen Road Name:Jarrod Cooke <br /> City/State:Tracy CAS <br /> Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITE DATA <br /> 1 Number of E-Stop switches INSIDE of the building: 0 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 2 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram C. r C' <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS C: r (' <br /> 5 Do all E-Stops shutdown power to ALL STP's C• C r <br /> 6 Are ALL E-Stops clearly Labeled C•' <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled C: r <br /> POST TEST <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. r <br /> 9 All safety barricades and test equipment has been properly removed C C (� <br /> 10 E-Stop was reset and all dispensing functions are normal ( (+ <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Comments(Clearly describe any deficiencies found) <br /> ongoing const. <br /> WO:2328908 <br />