My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015 AS BUILT PART 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
INSTALL_2015 AS BUILT PART 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 11:37:07 AM
Creation date
11/5/2018 1:21:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015 AS BUILT PART 1
RECORD_ID
PR0540345
PE
2351
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOOD\5655\PR0540345\2015 INSTALL\AS BUILT PART 1.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. PLAN VIEW SUBMERSIBLE PUMP SUMP <br />C. PLAN VIEW SUBMERSIBLE <br />PUMP SUMP <br />E. PLAN VIEW FILL SUMP <br />G. FIBERGLASS SUMP CONNECTION DETAIL <br />REVISIONS <br />J <br />J <br />J <br />J <br />N <br />N <br />PRODUCT LINE TO DISPENSERS <br />PRODUCT LINE TO DISPENSERS <br />812 CONDUIT HOME RUN <br />o <br />n <br />700 8 9 12 13 <br />700 8 9 12 13 <br />TO PULL BOX <br />\ <br />----- <br />N <br />m <br />\``` <br />705 <br />705 <br />`� 352 <br />SUMP TOP <br />401 14 <br />401 14 <br />�, 1 <br />, <br />2 811 182 <br />703 <br />182 <br />703 <br />505 ,i �i \\ \\ 811 <br />CONDUIT HOME RUNS <br />CONDUIT HOME RUNS <br />TO PULL BOXES <br />401 14 MANIFOLD LINE <br />MANIFOLD LINE 705 / — - _ _ _ <br />_ _ _ \ 813 TO PULL BOXES <br />508 509 700 11 <br />\ <br />RESERVOFILL <br />(PROPYLENE 516 II II <br />INSIDE FIELD LAV -UP <br />OUTSIDE FIELD LAY-UP <br />GLYCOL AS <br />INTERSTITIAL 21 II II II 11 <br />FLUID) II 1( II <br />rc <br />755 // <br />II <br />755 <br />\\ II <br />❑ <br />, �� <br />II // <br />\\ <br />K <br />K <br />I I <br />�� // q <br />a <br />II <br />O <br />w <br />a <br />m <br />y <br />� <br />SUMP BODY <br />------------ <br />----------- <br />a <br />��a <br />FACTORY INSTALLED <br />516 �`� <br />4 <br />FACTORY INSTALLED <br />516 <br />�/ , <br />F. ELEVATION FILL SUMP <br />MONITORING RESERVOIR ` <br />518 517 <br />MONITORING RESERVOIR � <br />\�\ <br />) 518 517 <br />SUMP BODY <br />ROPYLENE <br />(PGLYCOL AS � <br />21 <br />�6 <br />i <br />°j <br />(P ROPYLENE GLYCOL AS 21 � <br />`�� <br />�/ <br />�\J <br />INTERSTITIALFLUID) <br />INTERSTITIAL FLUID) <br />520 <br />, <br />� <br />G <br />NOTE: \`\ _ _ _ <br />— - - - <br />ISTIED TO VEEDER ROOTP CONTROLS <br />_ _ _ _ _ i 100 NOTE: <br />- - - - — TEST BOOTS AT TANK SUMPS <br />751 TO REMAIN CLOSED TO KEEP <br />THE PIPING INTERSTITIAL <br />NOTE: `\\ <br />IST PUMP CONTROLS ARE <br />TIED TO VEEDER ROOT <br />100 NOTE: <br />751 TEST BOOTS AT TANK SUMPS <br />TO REMAIN CLOSED TO KEEP <br />THE PIPING INTERSTITIAL <br />51 51 150 155 154 <br />TLS -350 PLUS, SEE SHEET 14 401 <br />TLS -350 PLUS, SEE SHEET 14 401 <br />1 <br />INSIDE FIELD LAV -UP <br />E-5 FOR DETAILS. <br />508 509 700 11 SPACE CONTINUOUS. <br />7p5 <br />E- FOR DETAILS. <br />5 <br />508 509 700 11 SPACE CONTINUOUS. <br />705 <br />3 4 <br />OUTSIDE FIELD LAY-UP <br />VENT LINE <br />VENT LINE <br />� a <br />� <br />8 9 12 15 700 <br />8 9 12 15 700 <br />/ <br />COLLAR <br />162 <br />B. ELEVATION A—A SUBMERSIBLE PUMP SUMP <br />D. ELEVATION B—B SUBMERSIBLE <br />PUMP SUMP <br />6 <br />RESERVOIR 23 <br />(PROPYLENE 516 Z <br />178 <br />\_/\ <br />3 4 <br />SYPHON CHECK VALVE, <br />STD4009B893 <br />GLYCOL AS p, ? <br />INTERSTITIAL FLUID) o <br />FACTORY LAV -UP <br />FACTORY LAY-UP <br />176 <br />Y" NPT SYPHON 3 4 <br />505 <br />d a <br />1 <br />PORT <br />z <br />y <br />a 4 <br />811 <br />(5 <br />gy <br />.'I <br />816 <br />i_ <br />w <br />Q <br />d d <br />753 6 7 <br />ZOi'q <br />z <br />° <br />51 <br />1 01 <br />5 <br />NOTE <br />a <br />352 <br />UST INSTALLATION NOTES: <br />Z;x 6 <br />88- <br />VAC SENSOR SHOWN <br />omwi$ <br />10 <br />N THIS LOCATION <br />101 <br />5 <br />1. <br />SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN. <br />E p - <br />^ - <br />o <br />FOR CLARITY; <br />$ <br />2 n <br />3 RESERVOIR 516 <br />CONTRACTOR TO <br />77 <br />O <br />(PROPYLENE GLYCOL <br />INSTALL AS PER <br />520 <br />2. <br />JUNCTION BOXES IN TANK SUMP TO BE MOUNTED AS HIGH AS POSSIBLE IN SUMP. <br />4 AS INTERSTITIAL FLUID) 21 <br />100 MANUFACTURER'S <br />RESERVOIR 51s <br />? <br />CONDUIT & JUNCTION BOX TO BE OUTSIDE OF PERIMETER OF TANK ENTRY MANWAY. <br />Nd <br />INSTRUCTIONS <br />(PROPYLENE GLYCOL <br />Z <br />2 811 <br />WHERESPACE <br />AS INTERSTITIAL FLUID) 21 <br />100 <br />ALLOWS. <br />2 511 <br />N <br />3. <br />REINFORCING BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" FROM SURFACE. <br />® <br />816 <br />I <br />517 518 <br />816 <br />4. <br />REINFORCE CONCRETE SLAB AROUND MANHOLE WITH (4) #4 REBAR 60" IN LENGTH. <br />Qu <br />CONNECT TO VENT <br />22 <br />PLACE REBAR 6" FROM SIDES OF BOX. <br />Z <br />705 <br />LINE ENTRY BOOT <br />700 8 9 12 16 <br />705 <br />6 7 753 <br />5. <br />PEA GRAVEL BACKFILL. ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER <br />Lusoe <br />353 <br />509 700 11 <br />AND OWNER'S FIELD REPRESENTATIVE. <br />Lu353 <br />813 <br />zo <br />fTEST <br />6. <br />REAM ALL RISERS FOR FULL PIPE BORE. <br />Z <br />_ <br />/ <br />\ <br />_ _ — <br />813 <br />401 14 <br />— <br />8 9 <br />700 <br />FITTING <br />7. <br />COAT ALL BURIED GALVANIZED STEEL WITH COAL TAR EPDXY/WRAP. <br />® Z <br />52 <br />\ <br />12 ifi <br />\ <br />56 OR 56 <br />8. <br />PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A 6" COMPACTED PEA <br />W <br />14 401 <br />\ <br />GRAVEL BEDDING. PIPING SHALL NOT BE SUPPORTED BY BLOCKS, PLANKS, OR OTHER <br />, <br />18 182 <br />_ _ <br />DEBRIS. <br />,,' <br />22 <br />52 <br />22 <br />9. <br />ALL ENTRIES TO BE PERPENDICULAR TO CONTAINMENT SUMP. MAXIMUM 15° OFF LINE <br />18 182 w v w <br />WHEN USING FLEXIBLE ENTRY BOOTS. <br />CONNECT TG VENT <br />LINE ENTRY BOOT <br />10. <br />PLYWOOD 48" X 48" X 3/4" PLACED TO ASSURE 2" CLEARANCE BETWEEN CONCRETE <br />DOUBLE TAP <br />157 <br />517 518 <br />AND CONTAINMENT SUMP. <br />BUSHING <br />20 <br />157 <br />INSTALL SO THAT BOTTOM <br />508 sos 700 11 <br />DOUBLE TAP <br />504 505 <br />11. <br />18" LONG 2" DIAMETER FRP SLEEVE TO BE MOUNTED WITH UNSTRUT & U -BOLTS TO <br />.£ <br />OF PIPE 154"OFF BOTTOM <br />nD <br />TEST <br />SUSHI NG <br />20 <br />5'08 sos 700 11 <br />THE STP RISER, &SECURED 2" OFF THE TOP OF THE TANK RIB ON THE PRODUCT LINE <br />� <br />OF TANK <br />FITTING <br />OTT <br />INSTALL SOT HAT BOM <br />PENETRATION SIDE OF THE SUMP. SUMP SENSOR TO BE PLACED INSIDE OF FRP <br />J } <br />£¢ <br />OF PIPE IS 4" OFFB OM TEST <br />770 <br />F o <br />B3 <br />OF TANK FITTING <br />NOTE: <br />SLEEVE 8 REST ON THE TANK RIB. <br />Q <br />VAC SENSORSHOWN IN THIS <br />LLQ zm <br />�ed <br />LOCATION FOR CLARITY; <br />12. <br />PIPING TO BE INSTALLED PER NFPA 30A SECTION 5. CONTRACTOR TO PROVIDE AT <br />W LL <br />CONTRACTOR TO INSTALL AS <br />LEAST 4 FEET OF STRAIGHT FRP PIPE RUN BEFORE THE FIRST CHANGE OF DIRECTION. <br />z <br />MANUFACTUREITS <br />MS <br />T RUCTIONS WHERE <br />LL U N <br />Eta <br />13. <br />SLOPE PRODUCT PIPING BACK TO TANKS MINIMUM 1/4" PER V-0". <br />SPACE ALLOWS. <br />W <br />Wwo <br />14. <br />THE PRODUCT PIPING REDUCER BOOTS MUST BE ORIENTED WITH THE TEST PORT UP. <br />UHC <br />LU <br />�'?e <br />a <br />�� <br />15. <br />SLOPE VENT PIPING TO TANKS MINIMUM 1/4" PER V-0". <br />C8o <br />16. <br />MANIFOLD LINE TO BE SET LEVEL TO WITHIN 1/ 4". <br />gg <br />c/) <br />17. <br />2" SIPHON LINE STINGERS INSTALLED FOUR (4) INCHES FROM TANK BOTTOM. <br />®" <br />18. <br />MANIFOLD BALL VALVES IN THE DIESEL TANK SUMPS TO BE LEFT OPEN DURING <br />7 <br />sm <br />NORMAL OPERATION. <br />oS <br />19. <br />VACUUM SENSOR HOSES SHALL BE LONG ENOUGH SO THAT WHEN THE VACUUM <br />Wm <br />SENSOR HOUSING IS REMOVED FROM ITS MOUNT INSIDE THE TURBINE SUMP, IT CAN <br />. <br />BE EASILY PLACED OR SET ON THE TANK PAD FOR EASE OF ANNUAL TESTING. <br />We;6 <br />�:=p <br />20. <br />INSTALL PERMANENT 1/4" BALL VALVE ON TEST PORT, TO BE USED TO TEST SUMP <br />CONTINUITY. <br />SCALE: <br />21. <br />INSTALL PERMANENT LABELING TO SPECIFY THE USE OF BRINE OR PROPYLENE <br />1" = 1'-0" <br />GLYCOL. LABEL SHALL BE ABLE TO WITHSTAND DEGRADATION & SHALL BE PLACED IN <br />DRAWN BY: <br />AN OBVIOUS LOCATION. <br />GLZ <br />22. <br />CONTRACTOR MUST FIRST INSTALL SUMP RISER TO TANK MOUNTING COLLAR PER <br />DATE: <br />STRIKER PLATE <br />STRIKER PLATE <br />i <br />MANUFACTURER INSTRUCTIONS. CONTRACTOR TO ADDITIONALLY GLASS WRAP& <br />1/25/2015 <br />PROJECT NO. <br />INSTALLED BY XERXES <br />INSTALLED BY XERXES <br />STRIKER PLATE <br />9 <br />LAMINATE THE ENTIRE OUTSIDE PERIMETER OF THE BOTTOM CONNECTION <br />INSTALLED BY XERXES <br />w <br />FOLLOWING CURING OF ADHESIVE. SPECIFIC ATTENTION MUST BE GIVEN TO <br />CA -1098 <br />mw <br />D <br />SURFACE PREP. FIBERGLASS MAT MUST BE 4" WIDE MINIMUM AND MUST EXTEND 1/2" <br />DRAWING NO. <br />fO <br />BEYOND COVERAGE OF ADHESIVE. <br />23. <br />CONTRACTOR TO INSTALL THE DPW BAND CLAMPS FOR THE SHROUD BOOTS & <br />T-2 <br />SHROUD CAP PER DPW INSTRUCTIONS & SPECIFICATIONS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.