Laserfiche WebLink
2'-0" CHAMFERED CORNER <br />(TYP. AT CORNERS) <br />REFER TO T -SERIES DRAWINGS FOR <br />MANHOLE DETAILS. REFER TO SITE <br />DETAILS FOR ADDITIONAL CONCRETE <br />REINFORCEMENT <br />M <br />S" REINFORCED CONCRETE DRIVE & TANK 3 <br />TANK APRONS: SEE CONCRETE 20,000BfO-DIGALLONS <br />SEL <br />PAVEMENT SECTIONS ON SHEET 0.1 B -99610 -DIESEL <br />O <br />MONITORING WELL, <br />TYPICAL OF (2) <br />FUEL ISLAND PIPING PLAN <br />I L_ <br />19'-2" <br />UST VENT RISERS, SEE <br />DETAILS ON SHEET T-6 <br />O O <br />V � <br />Q Q <br />`DEF REMOTE FILL BOX, DUAL HOSE MASTER/SATELLITE DUAL HOSE MASTER/SATELLITE <br />SEE SHEET T-4 FOR DISPENSER WITH DEF FOR USE WITH DISPENSER FOR USE WITH ADJACENT <br />DETAILS ADJACENT SATELLITE DISPENSER (TVP. SATELLITE DISPENSER (TVP. OF 2), SEE <br />TANK STICK HOLDER, OF 2), SEE SHEET P-4 FOR DETAILS SHEET P-1 FOR DETAILS <br />SEE SHEET 0.2 FOR <br />4DETAILB � IJ <br />ENTER ENTER ENTER ENTER <br />BIO -DIESEL BLENDER PUMP SUMP, <br />BY OTHERS; SEE SHEET T-5 FOR <br />DETAILS <br />StormCeptor, SEE SHEET <br />T-6 FOR DETAILS <br />TO VENT RISERS <br />- - - - - - - - - - - - - - - - - - - <br />TRANSITION POINT FOR FUEL G.C. TO <br />CONNECT TO SITE CATCH BASIN <br />10' <br />CANOPY COLUMN <br />(TVP OF 6) <br />FIRE EXTINGUISHER (TVP. OF 3), SEE <br />SHEETD-2 FOR SPECIFICATIONS <br />`4 4'xi6' RAISED FUEL <br />`r ISLAND (TYP. OF 2), SEE <br />SHEET D-1 FOR DETAILS <br />SATELLITE DISPENSER, SEE <br />SHEET P-2 FOR DETAILS <br />CATCH BASIN INLET <br />TYPE "A" (TYP. OF 4), <br />SEE SHEET D-1 FOR <br />DETAILS <br />r n <br />DUAL HOSE R&D DISPENSER FOR <br />PANEL VAN USE ONLY (TVP. OF 2), SEE <br />SHEET P-3 FOR DETAILS <br />6"0 PIPE PAINT DIRECTIONAL ARROWS <br />BOLLARDS (TVP) �& TEXT, SEE SHEET D-1 FOR <br />DETAILS <br />NOTE:E NOTE: NTE SEE CIVIL SITE PLANS <br />LOCATION OF DIESEL TANK & <br />FOR SPECIFIC STORM WATER STRUCTURES <br />LOCATION OF VENT TO BE SITE SPECIFIC, REFER <br />RISERS &BOLLARDS. TO CIVIL SITE PLANS. <br />CONSTRUCTION NOTES <br />PROJECT DESCRIPTION: <br />INSTALL NEW 30'x94' CANOPY, (6). CANOPY COLUMNS & FOUNDATIONS, (5) FUELING ISLANDS, (7) <br />DISPENSERS (4 -MASTERS, 2-P&D, 1 -SATELLITE). INSTALL (3) NEW 30,000 GALLON DOUBLE WALL <br />FIBERGLASS UNDERGROUND STORAGE TANKS, & ALL RELATED PRODUCT PIPING. INSTALL <br />STORMCEPTOR & ALL RELATED PIPING. <br />SCHEDULE OF CONSTRUCTION ACTIVITY: <br />THE CONTRACTOR SHALL IMPLEMENT ALL EROSION CONTROL MEASURES PRIOR TO OTHER <br />CONSTRUCTION ACTIVITY. ALL EROSION CONTROL MEASURES MUST REMAIN FUNCTIONAL UNTIL <br />THE SITE HAS BEEN STABILIZED, UNLESS OTHERWISE STATED ON THE PLAN. <br />EROSION CONTROL NOTES: <br />SEDIMENT PONDS/TRAPS, DIVERSION CHANNELS AND PERIMETER CONTROLS SHALL BE <br />IMPLEMENTED AS A FIRST STEP OF GRADING WITHIN 7 DAYS FROM THE START OF GRUBBING, AND <br />SHALL CONTINUE TO FUNCTION UNTIL UPLAND AREAS ARE STABILIZED. SEDIMENT PONDS7TRAPS <br />SHOULD BE CLEANED OUT ONCE CAPACITY HAS BEEN REDUCED BY 40%. <br />DISTURBED AREAS WHICH WILL REMAIN UNWORKED FOR PERIOD OF 45 DAYS OR MORE SHALL BE <br />STABILIZED WITH SEEDING AND MULCHING OR OTHER APPROVED MEANS WITHIN 7 DAYS. <br />EROSION CONTROL BLANKETS WITH MATTING WILL BE USED ON DITCHES GREATER THAN 1.5% AN <br />ALL OTHER SLOPES. GREATER THAN 6% GRADE. <br />CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL METHODS PER ALL LOCAL, STATE, AND <br />FEDERAL REGULATIONS. <br />NO SOLID OR LIQUID WASTE SHALL BE DISCHARGED INTO STORM WATER RUNOFF. <br />OTHER EROSION AND SEDIMENT CONTROL ITEMS MAY BE NECESSARY DUE TO ENVIRONMENTAL <br />CONDITIONS. <br />OFF-SITE VEHICLE TRACKING SEDIMENT SHALL BE MINIMIZED. CONSTRUCTION VEHICLES ARE <br />LIMITED TO THE CONSTRUCTION ACCESS ROADS) AS NOTED ON THE SITEPLAN. <br />REGULAR INSPECTION AND MAINTENANCE WILL BE PROVIDED FOR ALL EROSION AND SEDIMENT <br />CONTROL PRACTICES. PERMANENT RECORDS OF MAINTENANCE AND INSPECTIONS MUST BE KEP <br />THROUGHOUT THE CONSTRUCTION PERIOD. INSPECTIONS MUST BE MADE A MINIMUM OF ONCE <br />EVERY 7 DAYS AND IMMEDIATELY AFTER STORM EVENTS GREATER THAN 0.5 INCHES OF RAIN IN A <br />24 HOUR PERIOD. PROVIDED IN THE PERMANENT RECORDS WILL BE THE NAME OF INSPECTOR, <br />MAJOR OBSERVATIONS, DATE OF INSPECTION AND CORRECTIVE MEASURES TAKEN, IF REQUIRED. <br />ELECTRIC SHOCK HAZARD <br />THE CONTRACTOR IS SPECIFICALLY ADVISED HEREIN OF THE EXISTENCE <br />OF LIVE UNDERGROUND AND OVERHEAD ELECTRIC LINES. THE <br />CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SAFETY AND PROTECTION <br />OF ALL PERSONNEL ASSOCIATED WITH THIS PROJECT CONCERNING THESE <br />HAZARDS. <br />UNDERGROUND UTILITIES <br />LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE APPROXIMATE AND <br />HAVE NOT BEEN VERIFIED. THE CONTRACTOR SHALL DETERMINE THE EXACT <br />LOCATION OF ALL EXISTING UTILITIES WHETHER SHOWN OR NOT SHOWN <br />PRIOR TO COMMENCEMENT OF HIS WORK. THE CONTRACTOR SHALL BE <br />COMPLETELY RESPONSIBLE FOR ALL DAMAGES WHICH MIGHT BE OCCASIONED <br />BY FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL <br />UNDERGROUND UTILITIES. <br />GENERALNOTES <br />1. SEE SITE PLANS AND E -SERIES DRAWINGS FOR ADDITONAL UTILITY TRENCHING WORK. <br />2. NEW AND EXISTING ASPHALT WITHIN A 20' PERIMETER OF THE NEW REINFORCED <br />CONCRETE APRONS AND PROTECTIVE SLABS SHALL RECIEVE SEAL COATING. <br />3. ALL EXCAVATED MATERIAL NOT SUITABLE FOR BACKFILL SHALL BE REMOVED FROM THE <br />SITE. IN THE EVENT CONTAMINATED SOIL IS ENCOUNTERED, SECURE THE SITE, STOP <br />WORK, AND NOTIFY THE OWNER IMMEDIATELY. <br />J <br />O <br />10' <br />18'-6" <br />18'-6" <br />18'-6" <br />18'-6" <br />(3) 30,000 GAL UNDERGROUND SINGLE HOSE MASTER <br />FUEL STORAGE TANKS (UST), DISPENSER, WITH DEF, <br />SERVICE BOX OVER WATER VALVE, <br />0 <br />4'x8' RAISED FUEL <br />EMERGENCY SHUT OFF <br />SEE T -SERIES DRAWINGS FOR USE WITH <br />N <br />SEE SHEET D-2 FOR DETAILS <br />ISLAND. SEE SHEET <br />SWITCH MOUNTED ON <br />ADJACENT SATELLITE <br />HOSE BIBB (TVP. OF 2), SEE <br />o <br />D-1 FOR DETAILS <br />CANOPY COLUMN (TVP. <br />DISPENSER, SEE SHEET <br />P4 FOR DETAILS <br />SHEET D-2 FOR DETAILS <br />LINE OF <br />CANOPY <br />OF 2), SEE SHEET D-2 <br />FOR DETAILS <br />OO <br />in <br />co <br />m <br />rn <br />a <br />O O <br />TANK4 <br />10,000 GALLONS <br />Q <br />O O <br />DEF <br />• <br />LDEFm <br />'1 <br />m <br />m <br />19-4- <br />m m4 <br />T 8" <br />9'-3" 9'-3"9'-3" <br />9'-3" 9'-3" 9'-3" <br />ENV <br />igBOX <br />TANK2 <br />30,000 GALLONS <br />TANK1 <br />30,000 GALLONS <br />OVAELRFFIRL <br />DIESEL <br />DIESEL <br />rr <br />n <br />O <br />O O <br />�d <br />M <br />S" REINFORCED CONCRETE DRIVE & TANK 3 <br />TANK APRONS: SEE CONCRETE 20,000BfO-DIGALLONS <br />SEL <br />PAVEMENT SECTIONS ON SHEET 0.1 B -99610 -DIESEL <br />O <br />MONITORING WELL, <br />TYPICAL OF (2) <br />FUEL ISLAND PIPING PLAN <br />I L_ <br />19'-2" <br />UST VENT RISERS, SEE <br />DETAILS ON SHEET T-6 <br />O O <br />V � <br />Q Q <br />`DEF REMOTE FILL BOX, DUAL HOSE MASTER/SATELLITE DUAL HOSE MASTER/SATELLITE <br />SEE SHEET T-4 FOR DISPENSER WITH DEF FOR USE WITH DISPENSER FOR USE WITH ADJACENT <br />DETAILS ADJACENT SATELLITE DISPENSER (TVP. SATELLITE DISPENSER (TVP. OF 2), SEE <br />TANK STICK HOLDER, OF 2), SEE SHEET P-4 FOR DETAILS SHEET P-1 FOR DETAILS <br />SEE SHEET 0.2 FOR <br />4DETAILB � IJ <br />ENTER ENTER ENTER ENTER <br />BIO -DIESEL BLENDER PUMP SUMP, <br />BY OTHERS; SEE SHEET T-5 FOR <br />DETAILS <br />StormCeptor, SEE SHEET <br />T-6 FOR DETAILS <br />TO VENT RISERS <br />- - - - - - - - - - - - - - - - - - - <br />TRANSITION POINT FOR FUEL G.C. TO <br />CONNECT TO SITE CATCH BASIN <br />10' <br />CANOPY COLUMN <br />(TVP OF 6) <br />FIRE EXTINGUISHER (TVP. OF 3), SEE <br />SHEETD-2 FOR SPECIFICATIONS <br />`4 4'xi6' RAISED FUEL <br />`r ISLAND (TYP. OF 2), SEE <br />SHEET D-1 FOR DETAILS <br />SATELLITE DISPENSER, SEE <br />SHEET P-2 FOR DETAILS <br />CATCH BASIN INLET <br />TYPE "A" (TYP. OF 4), <br />SEE SHEET D-1 FOR <br />DETAILS <br />r n <br />DUAL HOSE R&D DISPENSER FOR <br />PANEL VAN USE ONLY (TVP. OF 2), SEE <br />SHEET P-3 FOR DETAILS <br />6"0 PIPE PAINT DIRECTIONAL ARROWS <br />BOLLARDS (TVP) �& TEXT, SEE SHEET D-1 FOR <br />DETAILS <br />NOTE:E NOTE: NTE SEE CIVIL SITE PLANS <br />LOCATION OF DIESEL TANK & <br />FOR SPECIFIC STORM WATER STRUCTURES <br />LOCATION OF VENT TO BE SITE SPECIFIC, REFER <br />RISERS &BOLLARDS. TO CIVIL SITE PLANS. <br />CONSTRUCTION NOTES <br />PROJECT DESCRIPTION: <br />INSTALL NEW 30'x94' CANOPY, (6). CANOPY COLUMNS & FOUNDATIONS, (5) FUELING ISLANDS, (7) <br />DISPENSERS (4 -MASTERS, 2-P&D, 1 -SATELLITE). INSTALL (3) NEW 30,000 GALLON DOUBLE WALL <br />FIBERGLASS UNDERGROUND STORAGE TANKS, & ALL RELATED PRODUCT PIPING. INSTALL <br />STORMCEPTOR & ALL RELATED PIPING. <br />SCHEDULE OF CONSTRUCTION ACTIVITY: <br />THE CONTRACTOR SHALL IMPLEMENT ALL EROSION CONTROL MEASURES PRIOR TO OTHER <br />CONSTRUCTION ACTIVITY. ALL EROSION CONTROL MEASURES MUST REMAIN FUNCTIONAL UNTIL <br />THE SITE HAS BEEN STABILIZED, UNLESS OTHERWISE STATED ON THE PLAN. <br />EROSION CONTROL NOTES: <br />SEDIMENT PONDS/TRAPS, DIVERSION CHANNELS AND PERIMETER CONTROLS SHALL BE <br />IMPLEMENTED AS A FIRST STEP OF GRADING WITHIN 7 DAYS FROM THE START OF GRUBBING, AND <br />SHALL CONTINUE TO FUNCTION UNTIL UPLAND AREAS ARE STABILIZED. SEDIMENT PONDS7TRAPS <br />SHOULD BE CLEANED OUT ONCE CAPACITY HAS BEEN REDUCED BY 40%. <br />DISTURBED AREAS WHICH WILL REMAIN UNWORKED FOR PERIOD OF 45 DAYS OR MORE SHALL BE <br />STABILIZED WITH SEEDING AND MULCHING OR OTHER APPROVED MEANS WITHIN 7 DAYS. <br />EROSION CONTROL BLANKETS WITH MATTING WILL BE USED ON DITCHES GREATER THAN 1.5% AN <br />ALL OTHER SLOPES. GREATER THAN 6% GRADE. <br />CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL METHODS PER ALL LOCAL, STATE, AND <br />FEDERAL REGULATIONS. <br />NO SOLID OR LIQUID WASTE SHALL BE DISCHARGED INTO STORM WATER RUNOFF. <br />OTHER EROSION AND SEDIMENT CONTROL ITEMS MAY BE NECESSARY DUE TO ENVIRONMENTAL <br />CONDITIONS. <br />OFF-SITE VEHICLE TRACKING SEDIMENT SHALL BE MINIMIZED. CONSTRUCTION VEHICLES ARE <br />LIMITED TO THE CONSTRUCTION ACCESS ROADS) AS NOTED ON THE SITEPLAN. <br />REGULAR INSPECTION AND MAINTENANCE WILL BE PROVIDED FOR ALL EROSION AND SEDIMENT <br />CONTROL PRACTICES. PERMANENT RECORDS OF MAINTENANCE AND INSPECTIONS MUST BE KEP <br />THROUGHOUT THE CONSTRUCTION PERIOD. INSPECTIONS MUST BE MADE A MINIMUM OF ONCE <br />EVERY 7 DAYS AND IMMEDIATELY AFTER STORM EVENTS GREATER THAN 0.5 INCHES OF RAIN IN A <br />24 HOUR PERIOD. PROVIDED IN THE PERMANENT RECORDS WILL BE THE NAME OF INSPECTOR, <br />MAJOR OBSERVATIONS, DATE OF INSPECTION AND CORRECTIVE MEASURES TAKEN, IF REQUIRED. <br />ELECTRIC SHOCK HAZARD <br />THE CONTRACTOR IS SPECIFICALLY ADVISED HEREIN OF THE EXISTENCE <br />OF LIVE UNDERGROUND AND OVERHEAD ELECTRIC LINES. THE <br />CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SAFETY AND PROTECTION <br />OF ALL PERSONNEL ASSOCIATED WITH THIS PROJECT CONCERNING THESE <br />HAZARDS. <br />UNDERGROUND UTILITIES <br />LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE APPROXIMATE AND <br />HAVE NOT BEEN VERIFIED. THE CONTRACTOR SHALL DETERMINE THE EXACT <br />LOCATION OF ALL EXISTING UTILITIES WHETHER SHOWN OR NOT SHOWN <br />PRIOR TO COMMENCEMENT OF HIS WORK. THE CONTRACTOR SHALL BE <br />COMPLETELY RESPONSIBLE FOR ALL DAMAGES WHICH MIGHT BE OCCASIONED <br />BY FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL <br />UNDERGROUND UTILITIES. <br />GENERALNOTES <br />1. SEE SITE PLANS AND E -SERIES DRAWINGS FOR ADDITONAL UTILITY TRENCHING WORK. <br />2. NEW AND EXISTING ASPHALT WITHIN A 20' PERIMETER OF THE NEW REINFORCED <br />CONCRETE APRONS AND PROTECTIVE SLABS SHALL RECIEVE SEAL COATING. <br />3. ALL EXCAVATED MATERIAL NOT SUITABLE FOR BACKFILL SHALL BE REMOVED FROM THE <br />SITE. IN THE EVENT CONTAMINATED SOIL IS ENCOUNTERED, SECURE THE SITE, STOP <br />WORK, AND NOTIFY THE OWNER IMMEDIATELY. <br />J <br />O <br />J <br />O <br />J <br />C0 <br />J <br />O <br />n <br />L <br />0 <br />N <br />rn <br />o <br />m <br />n <br />in <br />co <br />m <br />rn <br />a <br />0 <br />z <br />U <br />z <br />a <br />wrcDm$ <br />z <br />NW$� <br />oa d <br />0 w 3 <br />< M <br />O0 0u <br />NO <br />Z <br />2z <br />® cc <br />W <br />Lu <br />�® Z <br />a <br />QZ <br />LIJ <br />F <br />J � <br />a <br />Q J <br />LL z U z m <br />JQWa <br />W LL z <br />7}i> <br />LL V 6 <br />-J <br />F <br />W N <br />En <br />W ~' <br />0 <br />r <br />CALE: <br />" = i'-0" <br />WN BYGLZATE: <br />5/2015JECT NO. <br />A-1098 <br />DRAWING NO <br />A-1 <br />