1.04 Quality Assurance The shielded cable must be Belden#88760,2 conductor, 18 AWG,or approved equal. 3.03 Tank Testing and approved by the Owner at selected points during the construction. The drawings must be approved prior to progress payment REVISIONS
<br /> approval.
<br /> approval. J y y y
<br /> A.Firms regularly engaged in the manufacture of vehicle servicing equipment whose products have been in satisfactory use for not less F.Electrical Specifications:-ELECTRICAL INSTALLATION of these specifications must be rigidly adhered to during installation of the A.Upon receipt of the storage tank at the site,and before installation,this Contractor shall measure the diameter of the tank at each
<br /> than mesa(3)years. inventory4eak detection system. Installation must be in accordance with the National Electrical Code(NFPA Code 70,1993),particularly opening and shall document each dimension in writing to the Owner. After the tank has been installed and backfilled,the Contractor shall B.The completed record set of record drawings shall be delivered to the Owner prior to the Electrical Contractors request for final m
<br /> Article 504,Section 500, Intrinsically Safe Systems. measure the diameter of the tank at each opening. The tank shall not be out of round by more than two percent of its original diameter. payment. Record documentation shall meet or exceed all Division 1 Specification requirements.
<br /> B.The Contractor shall be a Manufacturer-Certified Underground Tank Installer and a State Licensed piping installer. Contractor shall Each dimension shall be documented,in writing,to the Owner. c
<br /> provide documentation to Owner of proof of training and names of contractors employees that have been trained and licensed and will be G.Start-up and Training: The Contractor will be responsible for the provision of an authorized Veeder-Root representative for system C.Submit operations,maintenance and service manuals. F 77 m M ZZ m v
<br /> working on the fueling system. Contractor agrees to allow only those employees,who have been trained and licensed,to work on this start-up and training of the local FedEx Ground Manager and key personnel in its operation. Contractor will supply as part of the Close-out B.Inthe event the tank is more than two percent out of round,this Contractor shall remove the tank and he shall retest and reinstall the v m 2
<br /> project. Documentation a list of the individuals/personnel trained on the Veeder-Root system. tank as directed by the Owner at the Contractors expense. If the tank has been damaged due to improper installation or handling and 1.04 Regulatory Requirements oZ U
<br /> cannot be repaired to the Owners satisfaction,the Contractor shall furnish a new tank at his expense. Of
<br /> 1 05 Codes and Regulations 2.05 Site Controller and Card Reader System A.The Contractor shall secure and pay for all permits and inspections required by the governing authorities for the prosecution of the 0 0
<br /> C.The tank shall be leak-tested in Shia accordance with the lank manufacturer's latest published instructions for double-wall tanks. electrical work. All permits and certificates of inspection and approval signed by the controlling building department shall become the
<br /> The installation shall be in conformance with all tonal,state and federal regulations to include: A.The Contractor shall install a Fuel Management System. The system to be installed is an eFueling Site Controller property of the Owner. Of Q 0- Z
<br /> D.A pressure relief valve,set at six psig,shall be installed for all tests to protect the tank against over pressure. o - U
<br /> A.National Fire Protection Association(NFPA)Codes:NFPA 30,Flammable and Combustible Liquids Code;and NFPA 30A,Automotive Unless otherwise shown on the Construction Drawings,all work shall be done in accordance with NFPA Code 70,National Electrical B.All wiring shall be in compliance with the current edition of the National Electric Code,applicable state and city regulations and OSHA.
<br /> and Merin,Service Station Code Code,and NFPA Code 30A,Automotive and Marine Service Station Code. E.CAUTION: Tank must be isolated from fuel piping when piping tests are conducted. In cases of conflict between Code and Specifications,the mare restrictive requirements shall govern. W m U
<br /> F- J (A (n j
<br /> B.Federal,state and local regulations/codes B.System Desuiption/Installation:The fuel management system includes features that improve the ability of the fleet manager to F.Prior to backfilling to grade,conduct a soap bubble,five psi air pressure test on all piping connections and unused tank openings. C.The Contractor shall submit proof,if requested by the Owner,that the materials,appliances,equipment or devices that he furnishes J Z =Z W W
<br /> accurately collect,sort,analyze and store vehicle and fueling data efficiently as possible. and installs under this contract,meet the requirements of the Underwriters'Laboratories,Inc. Underwriters'Laboratories,Inc.and its J
<br /> C.American Petroleum Insfitute(API)standards for fueling installations. G.Owner's representative is to be present at the time of the tank tests and is to approve the installation. publications will be referred to hereinafter by the abbreviation UL,with or without additional identifying symbols. Q. d jU" J W fu
<br /> The configuration specified herein consists of but is not limited to a fuel site controller,mag-ship,island card reader w/racelpt printer, log D.The National Electrical Code(NEC)of the National Fire Protection Association,and Publications and Standards of the organizations P2) - U I_D.Latest edition of manufacturer's published installation guidelines printer,keypad,pump control terminal,modem and related hardware. 3.04 Fuel and Vent Piping Installation listed below are referenced herein by the abbreviations noted in parentheses,with or without additional identifying symbols. Unless fn U f- X
<br /> otherwise specified,all work shall be manufactured,tested and installed in accordance with such reference standards. W W :5 (n W W - Z
<br /> E.Local fire and health departments The Contractor is to install all equipment in strict accordance with the eFueling Installation Manual,or latest published installation A.Primary,secondary containment and vent pipe shall be installed in strict accordance with the manufacturers published instructions. m U U F W Z U F a
<br /> guidelines and the project drawings/specifications. 1.American Society for Testing and Materials(ASTM). Q > U 0- (r) W y z
<br /> F.Materials,fabrication and testing shall conform to standards of NEMP,IEEE,NFPA,UL and USAIA. B.Slope all vent piping up from tanks at a pitch of 1/8 inch per foot. 2..Underwriters'Laboratodes,Inc.(UL). () W (� W Z U o w L D 3
<br /> C.Electrical Specifications:-ELECTRICAL INSTALLATION of these specifications must be rigidly adhered to during installation of the fuel 3. Insulated Power Cable Engineers Association(IPCEA). 0 Z n Ur U Mn Q. F w
<br /> G.U.S.EPA 40 CFR 280 regulations. management system.Installation must be In accordance with the National Electrical Code(NFPA Code 70, 1993),particularly Article 504, C.Pipe trenches shall be backfilled with compacted granular material in accordance with the provisions of Division Two. 4.National Electrical Manufacturers Association(NEMA). 0 = Z 0 Z 0 m0 Om a o'
<br /> Section 500,Intrinsically Safe Systems. 5.Institute of Electrical and Electronic Engineers(IEEE). Z U U W Z 0 1 0 1, O �
<br /> PART 2-PRODUCTS 3.05 Steel Pipe Installation 6.American National Standards Institute,Inc.(ANSI). J Z Z 0 (' n F (n o � a w m
<br /> D.Start-up and Training: The Contractor will be responsible for the provision of an authorized Gilbaroo representative for system start-up 7.Nafional Fire Protection Association(NFPA). J F U Q' o = o rn rn
<br /> N N m W N
<br /> 2.01 Pipe and Fittings and training of the local FedEx Ground Manager and key personnel in its operation. Contractor will supply as part of the Closeout A.Piping shall be cut accurately to measurements at the site and worked into place without springing or forcing. B.Flammable&Combustible Liquid Code. (n � � (7 J m ¢
<br /> Documentation a list of the individuals/personnel trained on the eFueling System. 9.NFPA Cade 30A,Automotive&Marine Service Station Code 2000. LL m 0 (n (� J U - a Q a u
<br /> A.Pipe Handling: Each pipe and fitting shall be carefully inspected before the exposed pipe or fang is installed or the buried pipe or B.Unions or flanges shall he installed in all connections to equipment,as necessary to permit removal of equipment and specialties for r r r r r r r r
<br /> fitting is lowered Into the trench. Use proper Implements and tools for the safe and proper protection of the pipe. Carefully handle pipe in E.Site controller software to be programmed for FedEx Terminal Number 274. servicing,repairing or cleaning. 1.05 Hazardous Area Classifications In O to O ) O
<br /> such a manner as to avoid any physical damage to the pipe.Do not drop or dump pipe into trenches under any circumstances. N V O n In O O
<br /> 2.06 Fuel Dispensers C.Threads shall be made full depth and cleaned,and joints shall be made up with a joint compound or tape,suitable for the service. Cut A.Reference Is made throughout this specification to hazardous areas and,in tum,Class I Division 1 and Division 2 designations for d' tf�
<br /> Flexible Underground Piping(FUP): All underground piping and fittings for the handling of flammable and combustible liquid motor fuels snits of pipe shall have burrs removed by reaming. electrical equipment and wiring. This section defines these classifications and describes the extent of the hazardous areas associated with O O O O O O O (fl
<br /> shall be flexible thermoplastic conforming to Underwriter Laboratory(UL)971. The FUP system shall be comprised of a flexible primary A.Install the Gilbarco dispensers as per Drawing P-1. the improvements identified on the Construction Drawings. r
<br /> fuel pipe within a flexible secondary containment pipe. The primary pipe shall be retractable and completely accessible from the surface for 3.06 Pipe Tests and Cleaning
<br /> inspection,repair,or replacement without requiring excavation. 2.07 Corrosion Protection B.Class I,Division 1: Denotes a location in which ignitable concentrations of flammable gases or vapors can exist under normal
<br /> A.This Contractor shall clean and test all piping under this contract,and furnish all labor and materials to conduct these tests,as follows: operating conditions,or exist frequently because of repair or maintenance operations or due to leakage.
<br /> B.Primary Piping. A.All underground ferrous tank fittings,tank anchoring wire rope and fangs and piping that are exposed to the backfill material are to be
<br /> protected from corrosion by the Installation of dielectric coatings. 1.The diesel fuel piping system shall be tested against leaks by applying a 60 psig air pressure test,with all joints and fittings soaped C.Class 1,Division 2: Denotes a location in which volatile flammable liquids or flammable gases are handled,processed or used,but in
<br /> 1.Material-All primary diesel piping shall be 2"FRP pipe,as manufactured by NOV(Red Thread l IA). from a period of sixty(60)minutes,or until all joints have been inspected. CAUTION: Tanks must be isolated from piping duringtesting. which the liquids,vapors or gases will normally be confined within a closed system from which they can escape only in the case of
<br /> 2.Fittings-All primary couplings,sump entry fittings,and miscellaneous piping appurtenances shall be as manufactured by Bravo. B.The dielectric coatings that may be applied in the field are:coal tar epoxy,urethane or isophthalic polymer resin or other coating accidental rupture or breakdown of such systems or in case of abnormal operation of equipment.
<br /> 3.Testing-Piping shall be tested as set forth in Section 3.06 of this document.This testing shall be in compliance with the pipe materials approved by Owner. 2.The secondary containment and vent piping systems shall be tested at 3 psi with air. All joints shall be soaped to test for leaks. Ur
<br /> manufacturers installation instructions. Pressure shall be maintained for one hour or until all joints have been inspected. 1.The same hazard exists with both classifications,i.e.,under normal or abnormal operating conditions. Electrical equipment and Z
<br /> 2.08 Tank Ballast wiring installed in Class 1,Division 1 locations must be"explosion proof'or"intrinsically safe." In Class 1,Division 2,equipment and wiring
<br /> C.Secondary Containment Piping. Secondary containment piping shall be installed on all primary product underground piping. 3.Owners representative is to be present at the time of the tests and is to approve the installation before any piping is covered. may be"vapor tighC or"inbinsically sate." National Electric Code Articles 500,501,511,514,and 515 cover installation for Class 1, J
<br /> Tank ballast shall be drinking quality water. Division 1 and Division 2local_Klaus. J
<br /> 1.Material-Secondary containment piping shall be 3"FRP pipe,as manufactured by NOV(Red Thread IIA). 4.After the piping has been tested,the underground tanks and all fuel and secondary containment piping shaii be maintained with a LL
<br /> 2.Fittings-All secondary containment piping sump entry fittings and test tools shall be as manufactured by Bravo,and shall be fully 2.9 Backfill continuous 3 PSIG air pressure during backfill and paving. Each line shall be famished with a pressure gauge and arrangements shall be D.The installation shall be utilized for diesel fueling at this time. Diesel fueling does not require Class l installation methods. However it is Y
<br /> air-testable to 5 psi. made to periodically check and log the air pressure. The pressure shall be checked daily and a log maintained,during time periods of the intent of the documents that this installation be in full compliance with Class 1,Division l and Division 2 areas to allow potential gasoline U
<br /> 3.Testing-Piping shall be tested as set forth in Section 3.06 of this document.This testing shall be in compliance with the pipe A.For bank hole and piping trenches: backfilling and paving and weekly during periods of inactivity near the pipe installation. The daily log shall be famished to the Owner at the fueling in thefuture. In Q
<br /> manufacturers installation instructions. completion ofthe project. 0 fn
<br /> 1.General: Must be clean,washed,well granulated,free flowing,noncorrosive and void of ice or snow. Must be compacted and probed 1.06 Electrical Class I Locations 0 co
<br /> D.Rigid Underground Vent Piping: under the shoulders to the lank and piping to achieve proper support. 3.07 Owners Tank and Piping System Test = U
<br /> A.UNDERGROUND STORAGE TANK F_ Z
<br /> 1.Material-All underground vent piping shall be double wall 273"FRP pipe,as manufactured by NOV(Red Thread IIA). 2.Pea Gravel: Relatively self-compacting rounded aggregate with a mix of particle sized not less than one eighth inch and no greater A.After this Contractor has completed the installation and testing of the underground storage tank,piping and dispensing system and Division W _
<br /> 2.Fittings-All vent piping sump entry fittings shall has as manufactured by Bravo,and shall be fully air-testable to 5 psi. than three quarter inch. Must meet ASTM C-33,Paragraph 7.1,for quality and soundness. Dry density must be a minimum 01`95 pounds after the grading,paving and concrete work is finished,the Owner will conduct a test of the storage tanks and piping. This lest will be Within 3feet of open and of vent,extending in all directions. 2 =
<br /> 3.Taxi-Vent piping shall be tested as set forth in Section 3.06 of this document.This testing shall be in compliance with the pipe per cubic fool. conducted by an independent testing agency which will be selected and supervised by the Owner. The Owner will incur all costs of this test 0U
<br /> manufacturers installation instructions. which include all labor,materials and equipment necessary to conduct this test. Division 2 ad Z Z
<br /> 4.Slope:All underground vent piping shall be sloped ata minimum of l/4"per lost from the riser to the tank. B.Contractor shall submits sieve analysiscertitying the backfill meets the tank manufacturers requirements. Area between 3 feel and 5 feet from open end of vent extending in all directions. (n r r, = W 2
<br /> S.The Owners tank test will be a precision lest which will be conducted in accordance with NFPA 329,"Handling Underground Releases J - U 0� W
<br /> E.Aboveground Steel Piping: PART 3-EXECUTION of Flammable and Combustible Liquids",which takes into consideration the effects of temperature change during the test. The maximum B. BOTTOM UNLOADING(al tank truck) Q Z 1-- U F F
<br /> allowable leakage rate,corrected for temperature and pressure variables,is 0.10 gallons per hour. Division 2 W ix Q Z i W i
<br /> 1.Diesel Piping:All aboveground diesel product piping shall be carbon steel,seamless or Siesta,resistance welded,per ASTM A53, 3.01 Excavation and Backfill Within 3 feet of point of connections,extending in all directions. Also up to 18 inches above grade within a horizontal radius of 10 feet W ` a a Z �- m Z
<br /> Grade 8,Schedule 40. C.At the Contractors option,he may have an observer present during the entire duration of the test,to verity to his satisfaction that the from point of connection. 5 .6 a
<br /> 2.Vent Piping:All aboveground vent piping shall be shall be carbon steel,seamless or electric resistance welded,per ASTM A53,Grade A.Excavation for the tank shall be as recommended by the manufacturer and slope of sides to be dependent on type of earth. lest procedures have been conducted properly and the results are accurate. ~ j" F Q Z
<br /> B,Schedule 40. C. FUEL DISPENSING PUMP g _J 0 0 Q U w �
<br /> w
<br /> z &,,9
<br /> v
<br /> 3.Joining. Joining method for carbon steel pipes and smaller shall be screwed. B.Excavation must allow 36"clearance over tank ribs and beyond tank ends and be dee enough allow l2 inches of a ravel under D.The Contractor willbeheld corn letel res risible for the int ri of Mes stem and must fake alta ro nate corrective action '4'"
<br /> 9 9 P Pe Y P 9 Pe 9 P Y Pa he by Y PP P Division 1 Z > = pjf u¢O i N o
<br /> 4.Fittings. Fittings for steel pipe 4-inch and smaller shall be screwed, 150 pound,porton sleelfittings,flanges and couplings. Unions the tank. necessary to find and repair any leaks with no additional cost to the Owner. Ifo leak is detected and after corrective action is completed by Any pit, box,or space below grade level which is within Division lor Division 2. U W F Of) Q 0 W wao$n
<br /> shall be 300 pound,carbon steel. All fittings must be properly protected against corrosion the Contractor,the precision test shall be conducted again at the contractor's expense. (n Z F W U Z LL. N r i$
<br /> 5.Thread Lubricant. Thread lubricant for steel pipe shall be a joint compound that is insoluble in hydrocarbons;non-hardening,solvent C.An earthen dike shall be constructed around the excavation b0 prevent water entry into tank hold unfit tank backfill is installed to top of Division 2 Q W = I X U - z R w w d
<br /> free,Teflon-based,thread sealant. tank and tank is ballasted with water. E.At the Contractors option,additional testing of the tanks and piping,in addition to the tests as required in this Section of the Up to l 8 inches above grade level within 20 feet horizontally of any edge of enclosure, IM (1) U LL W U §i o ,2IZ
<br /> Specification,may be conducted to insure the integrity of the tank and piping,prior to the Owner's precision test. The Contractor shall r r r r r r a o w 0
<br /> Pipe threaded connections shall be treated with a non-hardening,solvent free,Teflon-based,thread sealant,such as Casale soft-set of D.Backfill for lank hold shall be installed per lank manufacturer's published Instructions and in accordance with Division Two immediately notify the Owner of any leak in the tank,piping or Inings. Special attention shall be given to NEC Article 514-1l circuit disconnects for the fueling pumps(all conductors,Including phase and a $onu
<br /> Jomar seal. SEALANT SHALL BE APPROVED FOR USE IN DIESEL PIPING(when applicable). requirements. neutral must be simultaneously broken by the primary disconnect)and NEC Article 501-13 Conductor Insulation. (Only TW Gasoline and M d- r9 O O
<br /> 4Y LA L() O CO N U
<br /> 3.08 Site Controller Installation Oil Resistant or THHNliHWN Gasoline and Oil Resistant wire is UL-approved for this purpose:) O O t O O P
<br /> 2.02 Piping Specialties 3.02 Tank Installation O (D t0 O O O O Z
<br /> A.The site controller and all peripheral equipment shall be installed and tested in strict accordance with the manufacturer's published Law voltage direct current(VDC)control circuitry shall be"intrinsically safe"in accordance with NFPA 70,National Electric Code,Article r r
<br /> A.Furnish and install lank piping accessories,such as manholes,fill boxes,etc.as shown and specified on the drawings. A. The Contractor shall be certified and/or licensed to perform tank-handling activifies by the authorities having jurisdiction and have instructions. 504,Section 500.
<br /> those additional certifications required by the applicable equipment manufacturers. All work must be accomplished in accordance with �-t�
<br /> B.Contractor shall attach a brass tag to the fuel lank spill container cover. This tag shall have embossed the following statement: federal,state,and local requirements and accepted safety standards. Before initiating the work,the Contractor must consult applicable 3.09 Card Reader System Installation In hazardous areas,each enclosure for circuit breaking or other potential spark producing device shall be properly sealed with a conduit V
<br /> regulatory and permit requirements with the appropriate government agencies. The Contractor is responsible to advise the Owner of any seal(Crouse-Hinds EYS or EZS or equal)as close to the device as possible. A conduit union shall be installed Immediately between the
<br /> "Non-Metallic Underground Tank for Petroleum Products Only" conflict between applicable regulatory requirements and these Construction Specifications. A.The card reader system shall be installed and tested in strict accordance with the manufacturer's published instructions. seal and the enclosure it protects. O Z
<br /> _
<br /> 2.03 Undergmund Tanks B. The Contractor shall obtain all applicable permits before commencing any work.Contractor shall Install and test tank In strict 3.10 Level Gauging and Leak Sensing Equipment 1.07 Emergency Electrical Disconnect Switch Ir
<br /> acceptance with the manufacturers written recommendations and Instructions.Contractor shall submit to Owner,upon completion of the SLI
<br /> A.Contractor shall install(2)Xerxes double wall 30,000 gallon fiberglass lank. See Drawings T-1 &T-2. work,the completed and signed installation check list which is shipped with each lank.When complete,the tank installation shall conform A.The system shall be installed in strict accordance with the manufacturer's published instructions. A.Purpose. The emergency electrical disconnect switch provides a means to disconnect ail electrical power to the motor fuel dispensing W
<br /> Substantially to the configuration shown on the Construction Drawings. equipment and all associated power,control,signal circuits and other electrical equipment in hazardousiclassified areas during an 2
<br /> 2.04 Tank Monitoring System 3.11 Calibration of Equipment emergency. Z
<br /> C. Minimum depth of Grover from the top of the tank shall be 4.0 feet. Maximum depth of cover shall not exceed 7.0 feet.Tank Bail
<br /> A.The tank monitoring systems will be Installed by the Contractor.The system to be Installed is a TLS-350 UST monitoring system as must conform to manufacturer requirements for backFll material. Tank depth shall allow for a minimum of V8"per foot of slope and a A.After this Contractor has completed the installation and testing of the fuel storage tank,piping and dispensing system,and the card B. Location. Emergency controls shall be installed as indicated on the drawings. _� 3
<br /> manufactured by the Veeder-Root Company, 125 Powder Forest Drive,Simsbury,Connecticut 06070. Attn:Curtis Brown, (301)582-0500. maximum of 1/4"per foot of slope of productivent piping back to tank, reader system,the fueling system shall be calibrated. F W Z
<br /> See Drawings T-1,T-2,T-3,P-1, E-1 &EJ. 1.08 Quality Assurance O
<br /> D. The Contractor shall take all safeguards to prevent the flotation of the lank during the instailalion or upgrade projects. These SECTION 16051 - BASIC MATERIALS & METHODS Z t- LJJ
<br /> B.Unless otherwise shown on the Construction Drawings,all work shall be done in accordance with NFPA Code 70,National Electrical safeguards include,but are not limited t0,excavation dewatering,lank ballast,or other means and methods approved by the Owner. The PARTI GENERAL A.Weds shall be performed in compliance with the current edition of the National Electric Code,applicable State and City regulations and W W VJ
<br /> Code,and NFPA Code 30A,Automotive and Marine Service Station Code. Contractor shall fake all necessary precautions to prevent the introduction of petroleum products by others into any 1`11 opening,piping,tank OSHA. In cases of cre id between Code and Specifications,the more restrictive requirements shall govern. � W > ,
<br /> or excavation unfit the entire project has been accepted or as otherwise directed. 1.01 Scope of Work Y W U) , '
<br /> C.System Description/Installation:tion/Installation: The UST leaks,
<br /> system includes features that improve the a pr to control inventories 1.Only experienced craftsmen shall be employed under direct supervision of a full-time competent foreman. U
<br /> IX U
<br /> Y P 9 Y P aY Y PP P 0 � (,) X 0 ,
<br /> accurate) reconcile shift and Bail totals, leaks and warn of tank overfills. These features are programmable and can be set to E. After the final pavement is installed and ail testing of tanks and piping completed,the contractor shall evacuate all water from the tanks A.The work shall include the furnishing ofs stems equipment,and materialss ecified in this Division and as called for on the Drawings,Y Y identify P 9 P 9 Pt 9 P 9 systems, P P 9 Z W Z
<br /> match operating requirements. The design is modular,which allows each system to be configured with monitoring input and output and piping. The contractor shall then supervise the Initial filling of the tanks with product(famished by Owner)to assure that no spillage or to include: Supervision,operations,methods and labor for the fabrication,installation,start-up and tests for the complete electrical 2.Contractor shall keep fully informed as to progress ofwork,so that work of this Division may be built into place in sufficient time to 3: U
<br /> capabilities according to the specific need. overflow occurs. installation in accordance with the Drawings and Specifications. insure against delay to other trades,and to prevent misalignments or damage to deadest work. 2 LL O U J
<br /> U = W
<br /> The configuration specified herein consists of a monitoring console with integral printer and communications module,magnetartrictive F. Before diesel fuel lank is fitted with petroleum product,"NO SMOKING"signs are to be displayed,and the electrical equipment B.Drawings other than electrical drawings,and other Sections of this Specification may show or specify electrically operated equipment, 1.09 Guarantee w ZW W Y) LL
<br /> Y)
<br /> for inventory control,piping sump leak sensors,and hydrostatic leak sensors for interstitial monitoring of the storage tanks.The disconnected at the source. Personnel shall remain clear of Me area. wiring diagrams,etc. The Contractor shall examine all such Drawings and Specification Sections and became familiar with the � IX U J
<br /> monitor shall be located in the Line Haul Office. characteristics of.and required connections for all equipment for which wiring is t0 be provided. A.The Electrical Contractor shall guarantee for a period of one year that all work and equipment will remain free from all defects in Q (D 0
<br /> G. Special Requirements. Personnel may be exposed to petroleum hydrocarbon liquids or vapors during the lank Installation. All workmanship and materials,and that it will comply with all the specific requirements of the Specifications and other Contract Documents W W J Z W 3
<br /> The Contractor is to install all equipment in strict accordance with Veeder-Root latest published written installation guidelines. personnel involved shall be familiar with the potential hazards and appropriate health and safety measures to ensure a safe working 1.02 General Requirements governing the work. W W 4. ~ 0 F" ~ •£
<br /> environment. LL. LL. Z Z Z X Q €,
<br /> D. Leak Detection Programming A.Related and general provisions of Contract including General and Supplementary Conditions and Division 1 Specification Sections B.All work found b the Owner to be detective shall be replaced with new work meeting all there requirements of the Contract. The - €O
<br /> 9 9 9 P 9 PP ry P Y P 9 q r W £.
<br /> F
<br /> U U J
<br /> H. Tank is to be level with in 3/e inch plus orminus and is to rest on afirm bed of gravel. Care must be taken that no voids remain under shall apply to this Section. Electrical Contractor shall bear all costs of supplying such new work,and installing and finishing same,and shall assume all costs for Z W 0 - � ❑ 6=
<br /> The Veeder-Root must be programmed with the following parameters at a minimum: or around the tank as gravel backfill is being placed. replacing other work damaged by the removal and replacement of any of the work. The Electrical Contractor shall bear all costs for freight, Z Z U Q F 0 J - o,
<br /> B.Drawings for the work are diagrammatic,intended to convey the scope of the work and to indicate the general arrangement and drayage and demurrage,and all labor in connection therewith. U 0 Q W Q D Q - K m
<br /> 1.Proper lank size,product,and gallonage I: Equipment Handling:33, locations of the work. Because of the smote of the Drawings,certain basic items such as conduit fittings,access panels,sleeves,pull and U U U (n LL LLQ LL U z m ad
<br /> 2.Water level warning at 2" junction boxes may not be shown. Where such items are required by Code or by other Sections,or where they are required for proper PART 2 PRODUCTS r r r r r r r W < ur 6 ao
<br /> 3.High water level limit at 2" 1.Storing and Handling of Tank Equipment: installation of the work,such items shall be included. O O O O O O O WQ> `g
<br /> 3 4.Overfill limit-90% 2.01 General O O O O O LfJ (O D } M< `B
<br /> a 5.High product level-90% Tank should not be dropped,rolled or impacted. Tank shall be stored,prior to installation,on smooth ground,free from rocks and foreign C.Equipment Specification may not deal individually with minute items such as components,parts,controls and devices which may be M M M n O O J QUQ o K 69
<br /> 6 6.Delivery lima-3000 objects. Chock and lie down tanks with minimum 2-inch diameter rope,as recommended by the manufacturers instructions. required to produce the equipment performance specified or as required to meal the equipment warranties. Where such items are required, A.All equipment and devices s Khali be new and shall conform to NEMA and Underwriters'Laboratories Standards. Where O O O O O r r UJ R ry --
<br /> 0 7.Low Product level-7.5% they shall be included by the supplier of the equipment,whether or not specifically called for. Symbols used on the floor plans are defined Spe�cafions describe,or Drawings show,materials or equipment of higher quality than required by code and local ruling,the Drawings (nH �
<br /> a Stare pump and electrical equipment in a clean,dry,enclosed area,poor to installation. in the Electrical Symbols Schedule on the Drawings. Not necessarily shall all symbols scheduled be required for the project. and Specifications shall govern the quality of the material or equipment. UJ
<br /> All liquid sensors shall be identified as to their location. If multiple sensors are used,Contractor will post a laminated drawing adjacent to I 0 S€
<br /> m the monitor to indicate the location of the sensors by name and number.Both the UST sump and the master pump sumps shall be Piping shall be stored in padded pipe racks or raised lay down areas. Piping shall be stored with end caps to prevent the internal D.The Contractor shall refer to Division l Section 01560 Temporary Facilities for construction phase general temporary power 6. Materials and equipment used as extensions to existing spacial systems shall be of matching electrical characteristics for satisfactory
<br /> H equipped with Veeder-Rool(model#VR-794380-352)discriminating sump sensors. accumulation of water or debris. Handle piping to prevent impacts that could damage pipe. Do not use chain or cable around piping. Do requirements. operation of the complete system and shall be of the same manufacture and design unless otherwise approved. (n 6`
<br /> not drop pipe into trench. Lay piping by hand d
<br /> 3
<br /> E.Shielded Cable: As of September 11 1998 Na use of shielded cable for"all robes and sensors"re artless of conduit material or E.The Electrical Contractor shall be aired to visit the site of the work and familiarize himself with all such conditions affecting the work. C.Bidders desiring topropose volunta alternates for thes specified brands or methods shall refer to the lnslmctiona to Bidders.
<br /> Zw=
<br /> -o P p 9 eq 9 9 voluntary P 14§
<br /> application,is required by the Veeder-Root Company. As specified,shielded cable must conform to the following criteria: 2.Lifting Tank: The submission of his bid proposal shall presuppose his knowledge of all such conditions. O a8
<br /> 3 2.02 Materials J €
<br /> 73 1.The cable must be gas and oil resistant. Handle tank in accordance with manufacturers instructions.Double-wall tanks are NOT to be unloaded from the delivery truck manually. 1.03 Submittals w 0 0-0 r»8
<br /> 0 2.The cable must contain a drain wire for easy connection of the shield. Do not roll or drag tank to hole. A.The Electrical Contractor shall furnish and Install a system of nameplates designed to identify each piece of equipment,control unit X C Q$
<br /> 3.The shield must be connected to the earth ground terminal(intrinsically safe side)at the monitor antl only. A.As work progresses during the construction period,the Electrical Contractor shall record a dedicated set of bid drawings)any thereon,and major distribution points. Nameplates shall be fastened to all enclosures by use of stainless steel sheet metal screws or Q f- 7
<br /> 0 4.The cable cannot be of a coaxial type. Only use lifting equipment sufficient in size to handle the tank weight. Use only lifting lugs provided to lift tank. Use guidelines at each deviations from the design drawings. These drawings will be inspected rivets. The following color scheme shall be used as a guide: Z 2Uo6
<br /> 5.The shield to conductor capacitance must be less than 100 p1`/ft. end of tank to guide tank. Guide Tines may be lied to special plugs threaded into the 4-Inch access ports of the tank. Do not use chains z U (1� I-L�.
<br /> X
<br /> or cables tied around tanks. 1.Far switchgear,control centers,all panels and remote control and indicating devices served by"normal"power,black plastic, U
<br /> laminated,with white engraved letters to identify basic unit name and system,and each sub-system name shall be used. Z � Y�
<br /> 0 3.Anchoring: Mechanical Tank Anchoring shall be required..Installation instructions vary with the different tank manufacturers. The �/� Z Cn Vtl1=
<br /> x Contractor shall be aware of and follow the guidelines set forth by the particular tank manufacturer for this site.Reference Drawings for 2.Size of nameplates shall be made to readily differentiate between,and identify,equipment and usage. V) 0 W W w#a 5
<br /> �-.-,a
<br /> 1.
<br /> LL project anchoring requirements. 7 U 0 LU z j ~ �a.
<br /> Itj
<br /> a i O W Q � 0 W
<br /> E o($ W Z U SCALE: a
<br /> Ur Z � c) U) W N.T.S.
<br /> N Q UQ U an drDRAWING
<br /> '`'
<br /> Lz0
<br /> (_� GLZ
<br /> Qo> m } Wo
<br /> J > W af o Z J co TE:
<br /> W af 0 Z Q2 Z m WCT NO.
<br /> U (n W (n (n 0 7 UL098
<br /> Wr r r r r r r NO.
<br /> 0^ 0 0 0 0 0 0 0
<br /> - M O I� M O N V
<br /> N M M to (D n nA4
<br /> 0 0 0 0 0 0 0
<br />
|