Laserfiche WebLink
i <br /> i <br /> .GENERAL NOTES <br /> MECHANICAL LEGEND <br /> A. GENERAL DUCT LEGEND <br /> 1. VERTICAL AND HORIZONTAL OFFSETS SHOWN IN DUCTS AND PIPES (SOME OF THE ABBREVIATIONS AND SYMBOLS SHOWN MAY NOT BE USED ON THIS PROJECT.) <br /> I INDICATE THE GENERAL RELATIONSHIP OF THE LOCATIONS OF THE DOUBLE LINE PRESENTATION A(*) COMPRESSED AIR (*PSI WHERE REQUIRED) FOS FUEL OIL SUPPLY RA RETURN AIR <br /> SYSTEMS. PROVIDE ADDITIONAL OFFSETS SIMILAR TO THOSE SHOWN NAME OF SINGLE LINE AD AR@A DRAIN FOV FUEL OIL VENT - RD ROOF DRAIN <br /> 4 AS REQUIRED TO SUIT CONSTRUCTION AND WORK DONE BY OTHER TRADES. FITTING PRESENTATION SUPPLY RETURN/EXHAUST <br /> I AP ACCESS PANEL FPM FEET PER..MINUTE RF RETURN FAN Stone <br /> 1 2. ALL VALVES, CONTROLS, DAMPERS, FANS, ETC., SHALL BE INSTALLED - <br /> IN ACCESSIBLE LOCATIONS. PROVIDE ADEQUATELY SIZED ACCESS DOORS _ - FS FLOW SWITCH - RH RELATIVE HUMIDITY <br /> WHERE REQUIRED. ROUND FSK FLOOR SINK RHG REFRIGERANT HOT GAS Marraccini <br /> ELBOW _ - <br /> 3. IT D THE INTENT LE THEM ALL <br /> CONDUAINCALIT, <br /> DRAWINGS TO RUN ALL PIPING FTT FLOAT AND THERMOSTAT TRAP RIC ROUGH IN AND CONNECT Patterson <br /> AND DUCTWORK CLEAR OF ALL CONDUIT, PIPES, EXAMINING, TREATMENT - r" c j <br /> AND OPERATING LIGHTS, MEDICAL GAS COLUMNS, PNEUMATIC TUBE BD BOILER BLOW DOWN G NATURAL GAS RIO ROUGH IN ONLY <br /> STATIONS (P.T.S,), AND OTHER EQUIPMENT, INSTALLED UNDER OTHER " <br /> SECTIONS OF THk THIS CONTRACT, AND SUPPORT SYSTEMS FOR SAME. BF BOILER FEED GA GAUGE RL REFRIGERANT LIQUID <br /> CONTRACTOR SHALL COORDINATE DUCT AND PIPING LAYOUT WITH ALL MITERED <br /> OTHER TRADES BEFORE FABRICATION <br /> BFP BACKFLOW PREVENTER GCO GRADE .CLEANOUT ATION AND INSTALLATION OF DUCTS. ELBOW RPM REVOLUTIONS PER MINUTE Architecture <br /> 4. ALL EXISTING SERVICES TO EXISTING BUILDING MUST BE KEPT OPERATING <br /> BFV BUTTERFLY VALVE GI GALVANIZED IRON RS REFRIGERANT SUCTIONPlanning <br /> DURING CONSTRUCTION. SHUTDOWN OF ANY BUILDING SYSTEM SHALL ONLY BHP BRAKE HORSEPOWER/BOILER HORSEPOWER GLV GLOBE VALVE RV RELIEF VENT/ROOF VENTILATOR Interior Architecture <br /> BE DONE AT TIMES ACCEPTABLE TO THE OWNER AND CONFIRMED IN WRITING. <br /> CONTRACTOR SHALL GIVE THE OWNER 48 HOURS ADVANCE NOTICE FOR THE VELOCITY BLV BALL VALVE GPH GALLONS PER HOUR RVV RELIEF VALVE VENT <br /> SCHEDULING OF THE SHUTDOWNS, PROVIDE SUPPORT AND PROTECTION FOR ALL <br /> EXISTING PIPING AND/OR EQUIPMENT TO MAINTAIN THEM IN SERVICE SPLIT BOD BOTTOM OF DUCT , GR GRADE - - SA - SUPPLY AIR/SHOCK ARRESTOR <br /> THROUGHOUT CONSTRUCTION OR UNTIL THEIR SCHEDULE SHUTDOWN TIME. BT BATH TUB GV GATE VALVE SB . SITZ BATH One Market Plaza <br /> 5. HOT-DIP GALVANIZED ALL DUCT, PIPE AND EQUIPMENT SUPPORTS EXPOSED <br /> BV' BALANCING VALVE. H(*) DOMESTIC HOT WATER. (*TEMP. WHERE REQ'D.) SD - SIGHT DRAIN Spear Street Tower <br /> TO THE OUTSIDE. WHERE SUPPORT MATERIAL HAS FACTORY-APPLIED ��--��--,,------_---1I Suite 4O0 <br /> CORROSION RESISTANT GALVANIZED COATING COLD GALVANIZING BWV DOMESTIC VALVE HE HOSE BIBS � - SDR SMOKE DAMPER - <br /> COMPOUND MAY BE USED ON RAW EDGES. COLD GALVANIZING COMPOUND VELOCITY .I11 <br /> SHALL BE RECOGNIZED BY UNDERWRITER'S LABORATORIES AND SHALL SPLIT C. . DOMESTIC COLD WATER HC HEATING SF SUPPLY FAN San Francisco <br /> HAVE PASSED 2000 HOUR SALT SPRAY TESTING WITHOUT FAILURE. CB CATCH BASIN HE HELIUM SH SHOWER <br /> CA 94105 <br /> 6. IN CASE OF ANY CONFLICTS BETWEEN FLOOR PLANS, RISER DIAGRAMS, PIPING CBI CATCH BASIN INVERT - HPDT- HIGH PRESSURE DRIP TRAP SK SINK - - <br /> AND FLOW DIAGRAMS, CONTROL DIAGRAMS AND SPECIFICATIONS, THE CONTRACTOR CBR CATCH BASIN RIM HPR HIGH PRESSURE CONDENSATE RETURN SM SHEET METAL 415 227-0100 <br /> SHALL REQUEST A CLARIFICATION FROM THE ARCHITECT. ALL INFORMATION - VERTICAL <br /> PRESENTED SHALL BE CONSTRUED TOGETHER TO PROVIDE FUNCTIONAL SYSTEMS, SPLIT " CC COOLING COIL HPS HIGH PRESSURE STEAM SP - FIRE SPRINKLER <br /> AS INTENDED BY THE ARCHITECT. OFF CAP FOR FUTURE _ HR " HEATING HOT WATER- RETURN SPD SPRINKLER DRAIN „ v��a P RO�y�tiF� <br /> 7 FOR EXACT LOCATION OF PLUMBING FIXTURES INSTALLED IN CASEWORK REFER TO - CFH CUBIC FEET PER HOUR HS HEATING HOT WATER SUPPLY SS STAINLESS STEEL rchitect,AIA �. in <br /> ARCHITECTURAL DRAWINGS. CFM CUBIC FEET PER MINUTE HTG HEATING Na 12499 + <br /> VERTICAL SSD SUB-SURFACE DRAIN - <br /> T +EN,12 93 T <br /> SPLIT CO2 CARBON DIOXIDE HU HUMIDIFIER - SSK SERVICE SINK - ITC_�o <br /> ch. . Checked Tech R ord. AT )a C'AUFOP <br /> B. HVAC COL COLUMN HV HEATING AND VENTILATING ST - STEAM TRAP - <br /> 1. THE CONTRACTOR SHALL EXAMINE ARCHITECTURAL DRAWINGS TO - CHR CHILLED WATER RETURN HVAC HEATING) VENTILATING AND AIR CONDITIONING - <br /> ENSURE THAT ALL DUCTS CROSSING FIRE ANDYOR SMOKE SEPARATIONS STD STANDARD <br /> (E cll,ue�. <br /> ARE EQUIPPED WITH FIRE AND/OR SMOKE DAMPERS. WHERE ADDITIONAL - CHS 'CHILLED WATER SUPPLY T HWR .DOMESTIC HOT WATER RETURN STL STEEL 303 RUTHERFORD <br /> St. Suite E800 N. <br /> DAMPERS ARE REQUIRED, THE CONTRACTOR SHALL NOTIFY THE TAP-IN NOT USEDSecond <br /> ARCHITECT. - r l ClCI CAST IRON - HZ " HERTZ - ST-# SOUND TRAP - San Francisco, CA 94107 <br /> 2. REHEAT COIL TRANSITIONS AND TRANSITIONS TO SMOKE AND/OR FIRE , J- CLG CEILING ID INSIDE- DIAMETER SV . STEAM VENT " <br /> DAMPERS SHALL BE PROVIDED IN DUCTS AS REQUIRED. ! <br /> 3. LOCATE CEILING AIR OUTLETS ACCORDING TO THE ARCHITECTURAL - - c0. CLEANOUT - IE INVERT ELEVATION SW SPECIAL WASTE _ <br /> REFLECTED CEILING PLANS. CONTRACTOR SHALL CONFIRM CEILING �� COND:'. CONDENSER/CONDENSING/CONDENSATE IFS IN FURRED SPACE Structural Engineer <br /> TCA TEMPERATURE CONTROL AIR <br /> TYPES SHOWN ON ARCHITECTURAL DRAWINGS AND INSTALL CEILING TAP-IN CP CHROME PLATED IPS IRON PIPE SIZE Q�0 0 MA CR/ /F <br /> TCV TEMPERATURE CONTROL VALVE GUTTMANN & MacRITCHIE ti`s JP JC yc <br /> TYPE SUPPLY AND RETURN OR EXHAUST OUTLETS TO SUIT. j. I!I - CPVC' CHLORINATED POLYVINYL CHLORIDE IRRW IRRIGATION WATER 63tHoward Street, Suite 500 `' oe <br /> `l' TD TRENCH DRAIN: IIIK1(.f�9 y <br /> 4. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. - - - San Francisco, CA 94105 <br /> CRP CONDENSATE RETURN PUMP IW INDIRECT WASTE TH THERMOMETER `Y E)pA <br /> 5. WHERE FLEXIBLE DUCT CONNECTIONS ARE .USED; THEY SHALL BE EQUAL TRANSITION �--�� CS DOMESTIC COLD WATER (SOFT) L RAINWATER <br /> TO OR GREATER THAN CROSS-SECTIONAL AREA OF DUCTS SHOWN. USUALLY- ]-f1---t �r I I 1, TR TONS OF REFRIGERATION <br /> FOR MAXIMUM ALLOWABLE LENGTH SEE SPECIFICATION SECTION 15840. NOTSHOWN '�� CSK CLINICAL SINK LA LABORATORY COMPRESSED AIR - Mechanical Eng" ,f'yFC CFS' <br /> TS � TIP SPEED 9 l HAN1 �P <br /> "DUCTWORK." - ON SINGLE LINE CTE CONNECT TO EXISTING LAT LEAVING AIR. TEMRERATURE/LATENT - TSP TOTAL STATIC PRESSURE <br /> 6. PROVIDE TURNING VANES IN ALL ELBOWS WITHIN 8'-0" OF SUPPLY CV CONTROL VALVE - THE ENGINEERING ENTERPRISE <br /> LP LOW PRESSURE ,! <br /> DIFFUSERS AND GRILLES. RADIUS ELBOWS WITHOUT TURNING VANES gs� TV TURNING VANES 1305 Marina Village Parkway <br /> SHALL BE USED IN ALL EXHAUST AND RETURN DUCTS EXCEPT WHERE CWR -CONDENSER WATER RETURN LPDT LOW PRESSURE DRIP ,TRAP UR URINAL Alameda, CA 94501 <br /> SHOWN OR NOTED ON DRAWINGS. WHERE TURNING VANES ARE SHOWN <br /> IN EXHAUST AND RETURN DUCTS, ACCESS DOORS SHALL BE PROVIDED ELECTRONIC SUPPLY BOX CWS CONDENSER WATER SUPPLY LPG _. LIQUID PETROLEUM GAS ' V SANITARY VENT <br /> IMMEDIATELY UPSTREAM OF VANES. DB DRY BULB TEMPERATURE LPR LOW PRESSURE CONDENSATE RETURN VAC. MEDICAL VACUUM Electrical Engineer <br /> 7. VOLUME DAMPERS SHALL BE INSTALLED IN ALL BRANCH SUPPLY AND DE DEIONIZED WATER LPS LOW PRESSURE STEAM VB VACUUM BREAKER <br /> EXHAUST OR RETURN DUCTS. LOCATE DAMPERS AS DISTANT AS POSSIBLE - VARIABLE AIR VOLUME BOX <br /> FROM OUTLETS,NAGGE95 APB LOGAT ONP� WITH REMOVE OP�.T2ATOR IN /q OF DRINKING FOUNTAIN LV LAVATORY VCP VITRIFIED CLAY PIPE <br /> SYMBOLS PG DI DISTILLED, WATER LVG LEAVING _ VD VOLUME DAMPER ' <br /> C. PLUMBING AND PIPING Some of the symbols shown may not be used - <br /> Y Y I PRESSURE GAUGE DL DOOR LOUVER LWT LEAVING TEMPERATURE VEL VELOCITY <br /> 1. VERIFY EXACT INVERT ELEVATION OF POINTS OF CONNECTION TO EXISTING - on this project - - <br /> DN GOWN MA MEDICAL COMPRESSED AIR, VTR VENT THRV ROOF <br /> SERVICE PRIOR TO INSTALLATION OF NEW BRANCH, MAINS OR SERVICE - <br /> THERMOMETER <br /> RELOCATION. _ - Z GATE VALVE DR DRAIN M8H THOUSAND BRITISH. THERMAL UNITS PER HOUR VV VAPOR VENT <br /> 2. PROVIDE A VALVED DRAIN AT THE LOW POINT IN EACH PIPING SYSTEM. UNION <br /> - <br /> -'17CF'CJ'- DSP DRY STANDPIPE MCC MOTOR CONTROL CENTER . W - WASTE Approvals <br /> � - � �� <br /> 3. VENT ALL HIGH POINTS IN HEATING WATER AND CHILLED WATER PIPING AS - - GLOBE VALVE. DT DRIP TRAP MR.D MOTORIZED DAMPER - WB ,WET BULB TEMPERATURE - <br /> SPECIFIED. - FLANGE (E) -EXISTING MFR MANUFACTURER WC WATER CLOSET <br /> 4. PROVIDE CONDENSATE DRIP TRAP ASSEMBLIES AT THE ENDS OF STEAMS MAINS, -�-- CHECK VALVE EA EXHAUST AIR MG MEDICAL GAS <br /> BRANCHES, AND AT ALL LOW POINTS IN THE STEAM LINES. PIPE ANCHOR WOO WALL CLEANOUT <br /> EAT ENTERING AIR TEMPERATURE MGA MEDICAL GAS ALARM �' ccc ar acewir.+ <br /> WP WEATHER OR WATER PROOF <br /> ^- SPRING LOADED CHECK VALVE <br /> D. HEALTH CARE FACILITY PROJECT NOTES HUMIDISTAT <br /> ED EXTRACTION DAMPER - MPDT MEDIUM PRESSURE DRIP TRAP WSP WET STAND PIPE .-�' <br /> © <br /> 1. PIPES, DUCTS AND CONDUITS SHALL BE SUPPORTED AND BRACED PER CONTROL VALVE, TWO WAY EF EXHAUST FAN MPR MEDIUM PRESSURE CONDENSATE RETURN WT WEIGHT l n ,. " . i 3 ..' <br /> OSHPD ANCHORAGE PRE-APPROVAL NO. ROOIO, THE SMACNA "GUIDELINES - , " OH HYGROMETER EJ EXPANSION JOINT - MPS MEDIUM PRESSURE STEAM 1" <br /> � _ y <br /> FOR SEISMIC RESTRAINTS OF MECHINCAL SYSTEMS AND PLUMBING PIPING - <br /> SYSTEMS" OR R-0003 THE "SUPERSTRUT SEISMIC RESTRAINT SYSTEM" OR - CONTROL VALVE, THREE WAY EL ELEVATION - - - (N) NEW - _-- , pgtg SEP 211993 <br /> R-0017 THE "KIN-LINE SEISMIC RESTRAINT SYSTEM" FOR PIPES AND Y - THERMOSTAT <br /> CONDUITS ONLY. ONCE THE EXACT LOCATION OF ALL PIPES AND DUCTS N2 NITROGEN ENT ENTERING " °'r" ""` "I`RIA!, <br /> ° - <br /> - - - ADDITIONAL ABBREVIATIONS <br /> ' „v a.,,• !, <br /> HAS BEEN ESTABLISHED, THE STRUCTURAL ENGINEER MUST CHECK THE COCK OR BALANCING VALVE ETO ETHYLENE OXIDE ' NC NORMALLY CLOSED AFF ABOVE FINISH FLOOR <br /> ADEQUACY OF THE SUPPORTING STRUCTURE TO ENSURE THAT THE ORIGINAL HC FLEXIBLE CONNECTION-PIPE <br /> DESIGN IS STILL ADEQUATE. SEE FOOTNOTES 12 AND 13 TO TABLE 23-P EOV ETHYLENE OXIDE VENT NFPA NATIONAL FIR✓;PROTECTION ASSOCIATION BLDG BUILDING <br /> OF TITLE 24 FOR LIMITATIONS, SOLENOID VALVIE REHEAT COIL ESP ETERNAL STATIC PRESSURE NO NORMALLY OPEN BMS BUILDING MANAGEMENT SYSTEM <br /> 2. WHEN INSTALL DRILLED-IN ANCHORS RAND/OR POWDER DRIVEN PINS IN -- -- PRESSURE REDUCING VALVE ASSEMBLY EVAC GAS EVACATION. N20 NITROUS OXIDE CD CONDENSATE DRAIN <br /> NON-PRESTESSED REINFORCED CONCRETE, USE CARE AND CAUTION - . . <br /> TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS. WHEN I FLEXIBLE CONNECTION-DUCT EWT ENTERING WATER PRESSURE NTS NOVTO SCALE CF CHEMICAL FEED Revisions <br /> INSTALLING THEM INTO EXISTING PRESTRESED CONCRETE (PRE- OR POST - <br /> RELIEF VALVE <br /> TENSIONED), LOCATE THE PRESTRESED TENDONS BY USING A NON- LINED DUCTWORK EXH EXHAUST NW NON-POTABLE WATER <br /> DESTRUCTIVE METHOD PRIOR TO INSTALLATION. EXERCISE EXTREME CARE I Date <br /> AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDON DURING nln FA FACE AREA 02 OXYGEN DWG DRAWING -It- <br /> INSTALLATION. MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN ' BUTTERFLY VALVE <br /> THE REINFORCEMENT AND THE DRILLED-IN ANCHOR AND/OR PIN. - ® SUPPLY AIR DUCT FC FLEXIBLE CONNECTION OA OUTSIDE AIR FIT_ FUTURE <br /> 3. ALL MEDICAL GAS- PIPING SHALL HAVE ALL BURRS REMOVED S. I ET]UB RETURN AIR DUCT NEEDLE VALVE FCO FLOOR CLEANOUT OD OUTSIDE DIMENSION <br /> P f�^ ® - <br /> sH4E-L 2EOME0 Iwo 'Oi A, Pl LI vED • TIIF_ka ('I('ItJCi SFt6.;L 2E- " FD FLOOR GRAIN ' OSY OUTSIDE STEM AND YOKE - LWCO LOW WATER CUT-OFF <br /> FLEXIBLE <br /> M p,SHALLur-ONSIS wIF N EXTERIOR <br /> O , - STRAINER FDC FIRE DEPARTMENT CONNECTION OV OUTLET VELOCITY. PCHS PRIMARY CHILLED WATER SUPPLY <br /> 4. FLEXIBLE DUCTS SHAL/L CONSIST OF AN EXTERIOR REINFOGALSS INSULATION RCED LAMINATED � t ® EXHAUST AIR DUCT <br /> DEGREES F), ENCAPSULATED C PRINGRSTEEL WIRE HELIX AND IMPERVIOUS, i PETE'S PLUG FOR FIRE DAMPER PD PUMP DISCHAGE/PRESSURE DROP "PCHR PRIMARY CHILLED WATER RETURN <br /> SMOOTH, NON-PERFORATED INTERIOR VINYL LINER. INDIVIDUAL LENGTHS ® ACCESS DOOR - FE FIRE EXTINGUISHER PFF PLUG FOR FUTURE - CHR SECONDARY CHILLED WATER RETURN <br /> OF FLEXIBLE DUCTS SHALL CONTAIN FACTORY FABRICATED STEEL CONNECTION - - <br /> COLLARS. - .----C=)- REDUCERRHQ HS - FEC FIRE EXTINGUISHER CABINET - PG PRESSURE GAUGE CHS SECONDARY CHILLED WATER SUPPLY <br /> B�HR REHEAT COIL VALVE STATION FH FIRE HYDRANT - PIV POST INDICATOR VAL',F_ SFD COMBINATION SMOKE FIRE DAMPER <br /> 5. FLEXIBLE DUCTS SHALL BE SUPPORTED AT OR NEAR MID-LENGTH WITH 2" � � ' <br /> WIDE 28 GA, STEEL HANGER ATTACHED TO THE STRUCTURE WITH BACKFLOW PREVENTER - <br /> AN APPROVED DUCT HANGER. INSTALLATION SHALL MINIMIZE SHARP RADIUS EXISTING TO REMAIN FHR FIRE HOSE CABINET PLBG • PLUMBING <br /> TURNS OR OFFSETS. THE MAXIMUM LENGTH WILL BEFIVE. FEET AND CAN � I BLIND FLANGE I FIN FINISHED PR PUMP RETURN g''R'�FR1FTFr•�YVrk7FFaT= pPE� <br /> T <br /> BE USED AT THE TERMINAL ENDS ONLY, EXCEPT THAT FLEXIBLE DUCTS `f O BE REMOVED <br /> PROPERLY INSTALLED MAY BE USED TO CROSS SEISMIC JOINTS WITHOUT FL FIRE LINE - PRV PRESSURE REDUCING VALVE . . BFF I361LE6_ FEED 2G'(LI F-I! <br /> OFFSETS. SiElEi PIPE GUIDE NEW WORK - - FLG ' FLANGE PSI POUNDS PER SQUARE INCH APC l A4"ID P-F�IsTp+�T zvsj' --{¢oN <br /> - FLR FLOOR - PSIG POUNDS PER SQUARE INCH GAUGE WD WL`LL. DPAIr] - <br /> ANGLE OR STOP CHECK VALVE e FCO FLOOR CLEANOUT FM FLOW METER PTS PNEUMATIC TUBE SYSTEM FNV Pl\ <br /> • CD O /G�L.ON ROOF GRAIN <br /> E. FIRE PROTECTION - 15 BALL VALVE - FD FLOOR DRAIN FO FUEL OIL PW PUMP WASTE TMH TUNNEL• MANI-tOI� <br /> - - � ® _ <br /> 1. PROVIDE QUICK RESPONSE SPRINKLER HEADS THROUGHOUT SMOKE COMPARTMENTS FOF FUEL OIL FILL 65MH SFW ITARY SEWcR P.IgNHOLE <br /> THAT INCLUDE PATIENTROOE•1S. - - FOG FUEL OIL GAUGE 5c `..�1;mpCTB � 1"�R <br /> FLEXIBLE DUCT � Sp SUMP PUMP <br /> - HB HOSE BIBS <br /> 2. GENERALLY SPRINKLER PIPING SHALL BE LOCATED IN INTERSTITIAL SPACE. BRANCH FOR FUEL OIL RETURN FGTAGAB REGIRGIJLATIpN <br /> PIPING UP TO 2" COULD BE LOCATED ABOVE CEILING IN ZONE S-7. - _ ROUND DUCT - I CO CLEANOUT - A F AIR IR GAP FI T a r <br /> FFi; FIN151H - <br /> GD �I�(]pR El:.+iV,d�TION <br /> 50R-51-X SMOKE DAMPER NUMP�r=•.R ;< <br /> SQUARE TO ROUND DUCT TRANSITION <br /> OP 5UPPLY/RG(LIRN . <br /> '-� FSK FLOOR SINK OG ON GENTF <br /> R BUILDING SYSTEM /-\ - <br /> 1. ALL HVAC DUCTWORK PLUMBING, FIRE PROTECTION AND THE FIRE DAMPER i aPDF-A DRIPTRAPA55SMBLY . <br /> W Sc�FT WATE <br /> R <br /> ASSOCIATED HVAC PIPING SYSTEMS SHALL BE INSTALLED STRICTLY W - - - r'OG POI HT OF GOrI,JgGTION <br /> IN ACCORDANCE WITH THE BUILDING SYSTEM REQUIREMENTS. SEE VOLUME DAMPER -O BJ BALL JOINT - W/RfjQ DIFPUSER `41I110 GDLI ej F19D VAMPEUZ ' <br /> SPECIFICATION SECTION 01010, SUMMARY OF WORK AND DRAWING 50R - - We u NP'YV.bR1G GON?RDL UNrr <br /> AO.5 FOR A CONCEPTUAL DIAGRAM OF THE INTERSTITIAL SPACE AND SMOKE FIRE DAMPER 8pH <br /> GENERALUTIUTY ORGANIZATION. DRAWINGS SHALL NOT BE SCALED - SAN JOAQUIN <br /> FOR EXACT LOCATIONS OF DUCTWORK"AND PIPING LOCATIONS ASU__7 <br /> � - - ELECTRIC DUCT HEATER - <br /> THY ARE DIAGRAMMATIC AND MAY NOT SHOW TRUE SCALE. - (�, 7 ROUND TO RECTANGULAR TAP ? GENERAL HOSPITAL ,. <br /> _ PM REPLACEMENT PROJECT <br /> 2. TO MAXIMIZE THE ACCESS SPACE BETWEEN UTILITY ZONES 4 & 5, -� r-4A FLOW METERS PHASE 1 B <br /> INSTALLING THE DUCTWORK&PIPING AS HIGH AS POSSIBLE IN ----0­� PIPE UP <br /> THEIR RESPECTIVE 84 ZONES AND AS CLOSE TO THE WALK DECK AS - - <br /> POSSIBLE IN THE S-5 ZONE. - [F - <br /> J PIPE Dowty -�-- FLOW swlTcri' - ' GENERAL NOTES, SYMBOLS, <br /> 3. THE DUCTWORK ANDPIPING AT THE S3 UTILITY ZONE SHALL. BE - <br /> SUPPORTED AND SEISMICALLY BRACED FROM, THE STRUCTUREB ELECTRONIC RETURN BOXLEGEND <br /> 4. <br /> ABOVE. - t� `-I 5 -- - --QQ POINT OF CONNECTION <br /> 4. THE DUCTWORK & PIPING AT THE S4 UTILITY ZONE SHALL BE ' POC - Scale: NONE <br /> SUPPORTED AND SEISMICALLY BRACED FROM THE WALK DECK THE <br /> SUPPORT FRAME DETAILS DESIGN�D FOR ELECTRICAL UTILITIES AS <br /> SHOWN ON DRAWING E7.4 MAY E USM AS A REFERENCE FOR DUCT HUMIDIFIER - Project No. Drawing No. <br /> CONSTRUCTION OF SUPPORT FRAMES, FOR THE lll _ - - 53000.09 - 0 • 0 1 <br /> MECHANICAL/PLUMBING U`RUTIES,AT THE S4 ZONE: I FSOR--{ - Date I <br /> COMBINATION FIRE AND SMOKE DAMPER 26 JULY, 1993 <br /> - I---"i-.� - <br />