My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
130
>
2300 - Underground Storage Tank Program
>
PR0231150
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 11:46:52 AM
Creation date
11/5/2018 1:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231150
PE
2381
FACILITY_ID
FA0003950
FACILITY_NAME
SJ COUNTY GARAGE
STREET_NUMBER
130
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
130 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HUNTER\130\PR0231150\BILLING.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEOFCALIFORNIA .' ••. `3 <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION• FORM B ? o <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT O 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SI E <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 8 TEMPORARY TANK CLOSURE 1-1_9.F'ANK REMOVED G <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: �V <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO(DAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> ILTANKCO ENTS IFA-11SMARKED.COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OILS* <br /> C. aUNLEA ED 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 60 EMPTY 1 PRODUCT O 1b PREMIUM4 GASAHOL ❑ 7 METHANOL <br /> UNLEADED O 5 JETFUEL <br /> Q 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN O 2 WASTE O 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.ANDC.ANDALLTHAT APPLIES IN BOXDANDE <br /> A. TYPE OF ❑ DOUBLE WALL O 3 SINGLE WALL WITH EXTERIOR LINER O 95 UNKNOWN <br /> SYSTEM SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) O 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD Wl FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE O 6 POLYVINYL CHLORIDE O 7 ALUMINUM O B 100!6 METHANOL COMPATIBLE WIFRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN 0 99 OTHER <br /> O 1 RUBBER LINED ❑ 2 ALKYD LINING F-13/EPDXY LINING E:] 4 PHENOLIC LINING <br /> C.INTERIOR O 5 GLASS LINING O 6 UNLINED . I/B5 UNKNOWN ❑ 99 OTHER <br /> LINING Epl <br /> IS LINING MATERIAL COMPATIBLE WITH 1009E METHANOL? YES_JNNYO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP O 2 COATING O 3 V L WRAP Ej 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION O 5 CATHODIC PROTECTION a 91 NONE 95 UNKNOWN O 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND.BOTH IFAPPLICABLE <br /> A. SYSTEM TYPE A 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION Ark 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A 1 HARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 31 99 OTNER <br /> MONITORING ❑ <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAD07E MONITORING [::] U OMATIC TANK GAUGING O 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE 95 UNKNOWN O 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAS USED(MOIDAYIYR) 2.ESTIMATED <br /> UANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO <br /> SUBSTANCE GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND 9:1.74E BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLINTCASNAME DA E <br /> IVRINTEDaSM.NATUREI � • <br /> kA <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK#00/ <br /> STATE I.D.# m a 3 O 1-,5-1 oil O <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE y <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> FORM 8 (12-91) <br /> FOR00BR5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.