Laserfiche WebLink
SEP 23 192 13:26 CRO CRr-TAL PROJECTS F•J <br /> L <br /> Task 3 - Laboratory Analysis and Database Management <br /> Two soil samples will be selected from each of the additional vertical soil borings for <br /> laboratory analysis. The samples will be analyzed for: <br /> o Extractable Total Petroleum Hydrocarbons (diesel range) <br /> o Purgeable Total Petroleum Hydrocarbons (gasoline range) <br /> o Benzene, Toluene, Ethyl benzene, and Xylenes (BTEX) <br /> Client assumptions and Responsibilities <br /> The client assumptions and responsibilities presented in Kleinfelder' Proposed Scope of Work, <br /> dated April 23, 1992 are in effect for this work plan addendum. <br /> If you have any questions regarding the scope of the work plan addendum, please do not <br /> hesitate to call us. <br /> Sincerely, <br /> KLER-TFEL)ER, INC. <br /> 0' <br /> Eric S. Findlay, R.G, <br /> Senior Geologist <br /> Puss2l t Carey, <br /> Engineering Manager <br /> ESF:ROC:ml <br /> Attachments <br /> Cost Breakdown <br /> Revised Plate 1, Tank Location Map <br /> cc: Ms. Carol Oz <br /> GM 19-92-274 Page 2 of 2 <br /> Copyright 1992 Kleinfelder, Inc. <br /> KLEINFELUEK 1077 Fite Cir:.la, SerraMe.Wo, CA 95827 (916) 366-1701 <br />