My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
24
>
2300 - Underground Storage Tank Program
>
PR0232372
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 11:27:21 AM
Creation date
11/5/2018 1:34:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0232372
PE
2381
FACILITY_ID
FA0003631
FACILITY_NAME
ONE CANLIS
STREET_NUMBER
24
Direction
S
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14914024
CURRENT_STATUS
02
SITE_LOCATION
24 S HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HUNTER\24\PR0232372\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Rinsate Hauler N/A <br /> Name <br /> Address <br /> City State Zip <br /> PhoneNo.( Hauler Registration # <br /> Disposal Site <br /> C. Tank/Piping Hauler N/A <br /> Name <br /> Address <br /> City State Zip <br /> Phone No. Hauler Registration # <br /> d. Tank/Piping Disposal Site N/A <br /> Name <br /> Address <br /> City State Zip <br /> Phone No. EPA ID # <br /> e. Contaminated Soil Hazardous Waste Hauler N/A <br /> Name <br /> Address <br /> City State Zip <br /> Phone No. Hauler Registration # <br /> 9. Describe the method for purging and/or inerting of the tank(s). <br /> Soil samples wi11 be collected from soil borings (vertical and 1 angle ) <br /> dril ed in the vicinity of the tank. <br /> 10. Describe in detail how the soil and/or water samples beneath the tank's invert and piping will be obtained. <br /> There is less than 10 feet of distance between the tank and buildin <br /> in w is the piping leads. One of the two vertical borings will be <br /> —drille acijacent to the tank and piping. <br /> 11. Describe how the excavation will be backfilled with suitable material (earth, sand, etc.) upon removal. N/A <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.